Price list 2026 · Europe

Sheet Metal Works: cost per linear metre 2026 and installation steps

Tinsmith work covers gutters and downpipes, sheet metal cladding for window sills, parapets, chimneys and low walls, flashing around penetrations, and fitting sheet metal or standing-seam roofing. What mostly sets the price is the length and shape of the cladding, how many corners and penetrations there are, and how high above the ground the work is.

Updated 09/2026·15 min read·35 price list items
Standard labour price
€9.50/ lm
Indicative range
€7.60 - €12.35
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page
Short answer

Fitting an eaves gutter costs €9.50 per linear metre of labour on the current price list. Downpipes, hooks, outlets and brackets are charged on top, per linear metre or per piece. Cladding for window sills, parapets and chimneys has its own rates, depending on the shape and the number of corners. Work up above the roof takes longer than work on the facade.

Types of work and their prices

€9.50
per lm

The most common tinsmith job on both a new roof and when replacing an old system. The gutter is fixed to hooks while keeping the fall towards the downpipe.

€9.00
per lm

Carries water from the gutter to the drainage system or onto the ground. The number and diameter of downpipes depends on the roof area.

€16.00
per lm

Protects the masonry below a window from water ingress. Priced per linear metre including corners and side trims.

€22.00
per lm

The most stressed detail of the roof. The flashing must be carried high enough above the roofing so it does not let water through when there is snow.

€30.00
per m²

Tinsmith elements tie in with the roofing, so both types of work are often assigned to the same crew at the same time.

€5.50
per lm
Removing old sheet metal elements

When replacing a system, the old gutters, downpipes and flashing are removed separately before the new elements are fitted.

Roofing sheet metal work price list 2026

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Roof plumbing and sheet metal35 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Gutters and downpipes cost

Install guttering (eaves)lm€9.50 / lmlmenter quantity-
Install gutter bracketpcspcs-
Install downpipelm€9.00 / lmlmenter quantity-
Install downpipe clippcs€3.50 / pcspcsenter quantity-
Install gutter outletpcs€12.00 / pcspcsenter quantity-

Dismantling cost

Removal of gutters and downpipes incl. bracketsmm-
Removal of ridge tiles, verge trims, chimney flashings and valley gutterslm€5.50 / lmlmenter quantity-
Removal of sheet metal roofingm²€4.50 / m²m²enter quantity-
Remove roof tiles (clay or concrete)m²€8.50 / m²m²enter quantity-
Strip roof battens incl. de-nailingm²€2.70 / m²m²enter quantity-
Roof truss dismantlingm²m²-
Removal of metal sheet roofing - unscrewing and lowering sheetsm²€6.00 / m²m²enter quantity-

Roofs and coverings cost

Timber roof truss installation (load-bearing structure)m²m²-
Install battening for tiled roofm²m²-
Install counter-batteningm²€3.90 / m²m²enter quantity-
Install vapour barrierm²€2.90 / m²m²enter quantity-
Cladding facade - standing seamm²€20.00 / m²m²enter quantity-
Lock seam / standing seam metal roof coveringm²€19.00 / m²m²enter quantity-
Install PVC waterproofing membrane (flat roof)m²m²-
Spark test PVC membrane (flat roof)m²m²-
Lay ceramic/concrete tile coveringm²€30.00 / m²m²enter quantity-

Waterproofing cost

Torch-on felt, horizontal surface (1x layer)m²€9.20 / m²m²enter quantity-
Torch-on felt, vertical surface (1x layer)m²€15.00 / m²m²enter quantity-

Window sills cost

Window sill flashinglm€16.00 / lmlmenter quantity-

Roofs and parapets cost

Flat roof parapet cappinglmlm-
Roof cleaning and paintingm²€12.00 / m²m²enter quantity-

Flashing cost

Chimney flashinglm€22.00 / lmlmenter quantity-
Wall / penetration flashinglm€16.00 / lmlmenter quantity-
Capping wall / gablelmlm-
Install drip edgelm€10.00 / lmlmenter quantity-

Insulation cost

Spray foam insulation - closed cellm²€17.00 / m²m²enter quantity-
Spray foam insulation - open cell (20-25 cm)m²m²-
Spray foam insulation - open cell (30-35 cm)m²m²-
Blown-in glass wool insulation for lofts and cavity wallsm²€15.00 / m²m²enter quantity-

Other works

Other unspecified workhrhr-
Total labour
- enter quantity
Create quote from price list →

How much it costs by scope

Model scope for replacing the gutter system on a house (20 linear metres)
Gutters only
20 linear metres of gutter installation, gutter hooks and outlets, without downpipes
Gutters with downpipes
Gutters as above, plus 2 downpipes of 6 linear metres each with brackets
Complete replacement including the old system
Gutters and downpipes as above, plus removal of the original cladding over a length of 32 linear metres
An indicative total of labour for the stated quantities, for a roof with a 20-linear-metre eaves edge. It does not include removing the roofing, scaffolding, or repairing the roof structure beneath the cladding.

Preparation and the tinsmith work process

01
Checking and measuring the roof

The tinsmith measures the length of the eaves edge and the fall, and counts the corners and penetrations. From the roof area they work out the gutter diameter you need and how many downpipes.

02
Taking off the old cladding

If you are replacing an old system, the existing gutters, downpipes and flashing come off first. The tinsmith then checks the supporting structure and the batten the hooks sit on.

€5.50/lm
03
Fixing the gutter hooks

The tinsmith fixes the hooks to the rafters or boarding with an exact fall towards the downpipe, usually 3 to 5 mm per linear metre.

04
Putting up the gutter

The tinsmith joins the gutter sections in the hooks and seals the corners and end caps. Then they fit the outlet where the downpipe will go.

€9.50/lm
05
Putting up the downpipes

The tinsmith fixes the downpipes to the facade with brackets. They carry rainwater into the drainage pipes, or onto the ground well away from the foundations.

€9.00/lm

Method of work

  1. 01Look over the roof, measure the lengths and choose the material and size of the gutter system.
  2. 02Take off the old cladding if it is a replacement.
  3. 03Fix the gutter hooks, keeping the fall towards the downpipe.
  4. 04Fit the gutter sections, joints and end caps, then the outlets.
  5. 05Fit the downpipes and brackets and connect them to the rainwater drainage.
  6. 06Clad the window sills, parapets, chimneys and other penetrations.
  7. 07Run water through to check the joints are tight and the fall works.

5 common mistakes

01
Gutter fall set wrong

If the gutter is flat or falls the wrong way, water sits in it or spills over the edge instead of running to the downpipe.

02
Too few downpipes for a big roof

If the downpipes are too few or too narrow, the gutter overflows in heavy rain even when the fall is right.

03
Chimney flashing not taken high enough

If the flashing stops too low, water gets in under the roofing when there is snow or heavy rain.

04
No expansion joints on long runs

Long, straight runs of sheet metal without expansion joints warp as the temperature changes, and the seams tear.

05
Mixing metals that do not go together

If incompatible metals, for example copper and galvanised sheet, touch with nothing to separate them, they corrode where they meet.

Where the roofer stops and the sheet metal worker starts

A sheet metal worker, in many countries also called a tinsmith, works with thin metal sheet and the parts made from it. On a family house this mainly means gutters and downpipes, metal cappings on window sills, parapets and low walls, flashing around chimneys, roof windows and other penetrations, and metal roofing joined with seams. The roofer lays the roof covering itself: tiles, shingles or profiled metal sheet. The line between the two trades is thin. Chimney flashing and valleys are built together with the roof covering, and one simply does not work without the other.

So before work starts, agree who is responsible for which detail. In practice it often happens that the roofer lays the tiles and the sheet metal worker turns up a month later. By then the flashing can only be glued or siliconed onto the finished roof. That lasts a few seasons. Then the sealant hardens, comes away, and water finds its way under the covering. When one crew does both jobs, or both trades stick to a shared schedule, the flashing is slid under the covering and lapped the way the system manufacturer specifies.

Materials and how they age

The material you will meet most often is galvanised steel sheet, either bare or with a coloured coating, often sold as pre-painted or plastic-coated sheet. The coloured layer protects the zinc from the weather, but bending and cutting can damage it. Cut edges and scratches therefore need a coat of the touch-up paint the manufacturer recommends. Skip this, and corrosion slowly creeps from those spots under the coating.

Titanium zinc is a zinc alloy with small amounts of titanium and copper. It forms its own protective patina, and if you scratch it, the patina grows back over time. It is joined by soft soldering with tin, so even complicated shapes can have watertight joints. It has one quirk, though: it does not like the cold. Manufacturers usually say that if the material is below roughly 10 °C, it should be warmed before bending, otherwise it can crack at the bend.

Copper is mostly seen on historic and prestige buildings. After fitting, it first turns brown, and the familiar green patina comes slowly, usually only after many years, depending on the local air. Aluminium is light and does not rust, but it must not touch fresh mortar, concrete or lime render directly. Their alkaline moisture eats into it. Keep this in mind if your window sills are being fitted into external insulation or render.

When different metals meet running water

When two different metals touch and there is moisture around, they form a galvanic cell. The less noble metal then corrodes faster. Compared with copper, zinc, galvanised sheet and aluminium are all the less noble ones. What few people know is that the metals do not even have to touch. Water running off a copper roof or copper flashing carries dissolved copper ions. When it lands in a galvanised gutter below, it gradually eats small pits into it.

The rule is simple: in the direction the water flows, copper may sit below zinc or aluminium, never above it. On older houses this rule is broken quite often. A cheaper galvanised gutter is connected to an original copper detail, the joint looks fine, and a few years later small holes appear in the bottom of the gutter. In a similar way, titanium zinc suffers under old bitumen felt, which can shed acidic water. Manufacturers recommend a protective coating or a different material in such places.

How big should the gutter system be?

Gutter size and the number of downpipes depend on how much roof drains into the gutter and how heavy the rain gets in your area. The roof area is measured in plan, as seen from above, not along the slope. In shops, gutters are labelled by diameter or by the girth of the sheet, which is its width before forming, and downpipes by diameter. Every manufacturer publishes tables showing what roof area a given gutter and downpipe can reliably handle. On an ordinary roof, sizing by eye usually works out. On large areas, steep roofs and long eaves, it tends to end with water spilling over the edge in a summer storm.

Fall, brackets and expansion

The gutter has to slope towards the outlet, usually by a few millimetres per metre according to manufacturers. Got a long eaves line? Adding another downpipe is more sensible than increasing the fall. A steeply sloping gutter is visible on the facade and ends up sitting high above the eaves at the far end.

Bracket spacing is set by the manufacturer, usually up to one metre, and less in mountain areas with heavy snow. A metal gutter gets longer and shorter as the temperature changes. Long straight runs are therefore split with an expansion joint, or the downpipe is placed so the gutter can move freely in both directions. Depending on the material and manufacturer, expansion joints usually go in roughly every 10 to 15 metres.

Think about snow too. On a roof without snow guards, it slides off all at once and can tear away the gutter along with its brackets. Snow guards above the eaves protect not only the people below but also the gutters themselves.

Window sills and external insulation

An external window sill has one job: to carry water from the window as far from the facade as possible. For that it needs a fall outwards, a drip edge that projects beyond the face of the wall, and side end pieces that let the sheet expand. If the sheet is built rigidly into the reveal with no room to move, it buckles as the temperature changes. The render then cracks at the side ends, and water gets into the insulation through the cracks.

When a facade is insulated, the window sill is not a separate job for the end. It is part of the insulation system and goes in at the right point in the sequence: under the bottom window profile or into the connection strip, before the final render coat. Original short sills do not reach past the new insulation thickness, so water runs straight down the render. The typical result is dark streaks below the windows and insulation that slowly gets damp.

Flashing around chimneys and penetrations

A chimney stands still, while the roof around it moves slightly. The flashing should therefore never be fixed rigidly to both the chimney and the roof covering at once. A two-part solution has proved itself. The flashing is turned up the side of the chimney and slid under the covering, and a separate cover flashing, set into a chase cut in the chimney, laps over it from above. Trade rules usually give the upstand above the covering as around 15 cm.

Behind a wider chimney, water from the roof collects, and snow and leaves get stuck there. For wider chimneys, a small saddle, often called a back gutter or cricket, is made behind it to send the water off to the sides. You cannot see this detail from the ground, and that is exactly why it tends to be left out on cheap jobs. The same principles apply to roof windows, vent pipes and solar panel penetrations. There, the manufacturer's own flashing kits are the preferred choice.

Parapets, low walls and standing-seam roofs

Parapet capping needs to fall towards the roof so water does not run down the facade. The sheet is held with clips or a continuous support profile, not with screws through the top surface. Every hole in that horizontal face is a place where water can get in. Depending on the material, joints are made with seams, with overlaps and a seal, or by soldering.

A standing-seam roof is joined by raised seams that are closed by hand or by machine. It is fixed to the deck with hidden clips, some fixed and some sliding, so the metal can expand. Many people think standing-seam roofing also suits a completely flat roof. It does not. Manufacturers set a minimum pitch, usually a few degrees, and at low pitches they ask for a double-lock seam, sealing tape and a suitable underlay. Under the metal you also need ventilation or a separating layer, otherwise condensation damages the sheet from below.

Permits, flats, lightning protection and rainwater

Replacing gutters and flashings like for like is usually treated as maintenance. The rules differ from country to country, though, and sometimes from one municipality to the next. Check your local building regulations and ask the local building authority before you start, rather than assuming nothing is needed. If the roof shape changes, or the house is listed or in a conservation area, agree the approach in advance with both the building authority and the heritage authority. In a block of flats, work on the roof and facade is decided by the building management or the owners' association.

On many houses, the metal gutter system is connected to the lightning protection, or the down conductors run right next to the downpipes. When gutters and downpipes are replaced, that conductive connection must not be broken and the clamps must not be removed. Any changes to the lightning protection and its inspection afterwards may only be done by a qualified electrician or lightning protection specialist.

If you want to connect downpipes to the drains, the conditions of the sewer operator and the municipality apply. You are usually not allowed to send rainwater into a foul sewer, and more and more often you are asked to hold the water back or let it soak away on your own plot. Find out these conditions before you reroute any downpipes. One more thing: work on a roof is work at height. The contractor must provide fall protection in line with health and safety rules.

DIY guide: cleaning gutters and downpipes on a single-storey house

If your house has a low eaves line, you can handle routine gutter cleaning yourself. For taller houses, steep roofs or any job that means climbing onto the roof, leave it to a company with proper equipment for work at height.

  1. Stand the ladder on firm, level ground, secure it against slipping and ask someone to hold it.
  2. Remove leaves, needles and silt from the gutter with a gloved hand or a plastic scoop, not a metal tool that scratches the surface.
  3. Clean the strainer or leaf guard basket in the outlet above the downpipe.
  4. Flush the gutter with a hose from the far end towards the outlet and watch that the water flows smoothly and does not stand anywhere.
  5. Check that the downpipe is clear, and if it drains slowly, clear the blockage from below through the access fitting or the rainwater trap.
  6. Clean the rainwater trap at ground level and remove settled tile grit and other dirt.
  7. Inspect brackets, joints and pipe clips and note any spots with corrosion, looseness or dripping for a professional to repair.

How to check the work at handover

Check the sheet metal details before the scaffolding comes down. Heavy rain is the ideal test, otherwise use water from a hose. At handover, go through these points:

  • Water in the gutter runs to the outlets and does not stand in the gutter after rain
  • Brackets are evenly spaced as the manufacturer specifies and the gutter does not sag under hand pressure
  • Joints, corners and gutter ends do not drip and long runs have an expansion joint
  • Downpipes are plumb, pipe clips are firm and downpipes discharge into a trap or away from the foundations
  • The conductive connection to the lightning protection is intact and the contractor has pointed out the need for an inspection
  • Window sills fall outwards, have a drip edge beyond the facade and side end pieces that allow expansion
  • Chimney flashing is turned up above the covering and lapped by a cover flashing, not just sealed with mastic
  • Parapet cappings fall towards the roof and no screws are visible in the top surface
  • The coating is not peeling at cut edges of coloured sheet and copper is not fitted above zinc or aluminium
  • The contractor has given you information on the material used, the system manufacturer and the warranty terms

Frequently asked questions

Fitting an eaves gutter costs €9.50 per linear metre of labour on the current price list. Hooks, outlets and downpipes are charged on top, by the number of pieces and the length.

Related work

Waterproofing
Torch-on bitumen membrane on vertical surfaces, single layer

How torch-on bitumen membrane goes on basement walls and parapets: substrate prep, top termination, laps, corners, mistakes and checks before backfill.

Roofs and coverings
Angle Standing Seam Facade Cladding

How angle standing seam metal facade cladding is installed, which metals are used, what makes the job harder and how to check the finished work.

Gutters and downpipes
Installation of Guttering and Gutter Brackets

How eaves guttering is fitted: brackets, fall, joints, outlet and water test. What to consider when choosing materials and checking the finished work.

Gutters and downpipes
Installing Rainwater Downpipes

How a downpipe is fitted, which material and size to choose, where the rainwater should go and what to watch with brackets and pipe joints.

Window sills
Installation of External Window Sills with Reinforcement Strips

How a tinsmith fits an external window sill, why sealing strips go underneath, which material to choose and how to check the finished work.

Roofs and coverings
Installing roof battens for tiled roofs

How roof battens for tiles are installed: setting out the gauge, batten size and treatment, fixing, typical mistakes and checks before tiling.

Roofs and coverings
Vapour Barrier Installation & Fitting

How a vapour barrier is fitted in a loft or plasterboard ceiling, which membrane to choose, how to seal joints and how to check the finished work.

Roofs and coverings
Installing counter battens on a roof

How counter battens are fixed on a roof, what height to choose, what to prepare beforehand and what to check before the roofers move on.

Roofs and coverings
Double Standing Seam Roofing/Folded Roofing - Pitched (Gable) Roof

How a sheet metal roofer lays a double standing seam roof, what roof build-up it needs, which metal to choose and how to check the finished work.

Roofs and parapets
Coping for Flat Roof Parapet Walls (Perimeter)

How metal coping is fitted to a flat roof parapet, which metal to choose, why the fall and the waterproofing joint matter, and how to check the work.

Roofs and coverings
Installation of Fatrafol PVC Sheet Waterproofing (Flat Roof)

How a PVC membrane is fitted on a flat roof, when it can go over old felt, which mistakes cause leaks and how to check the finished work.

Roofs and coverings
Spark Test for PVC Membrane (Flat Roof)

How a spark test finds leaks in a PVC flat roof membrane, when to book one, what the roof needs and how to check the test report.

Roofs and coverings
Laying and Installation of Clay/Concrete Tile Roofing

How clay and concrete roof tiles are laid, what must be ready before installation, where mistakes happen and how to check the finished roof.

Insulation
Sprayed Closed-Cell Foam Insulation

How rigid closed-cell PU spray foam is applied, where it makes sense, what to check before ordering and how to inspect the finished insulation.

Insulation
Sprayed Foam Insulation (Open Cell PUR, 20-25cm)

How open cell PUR spray foam is applied to roofs and ceilings, when 20 to 25 cm is enough, and what to check before the foam is covered.

Insulation
Open-cell spray foam insulation, 30 to 35 cm thick

How open-cell spray foam is applied at 30 to 35 cm: extending rafters, spraying in passes, vapour control, typical mistakes and checks before plasterboard.

Insulation
Blown insulation for lofts and cavity walls

How glass wool is blown onto a loft floor and into cavity walls, what depth and density to ask for, common mistakes and how to check the work.

Roofs and parapets
Roof cleaning and coating

How metal and concrete tile roofs are cleaned and coated, the right weather, which paints to use, common mistakes and why asbestos cement needs care.

Flashing
Chimney flashing

How chimney flashing is fitted, which parts and materials to use, why sealant alone fails, when a back gutter is needed and how to check the work.

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.