Tips on how to save money on a kitchen renovation

NUMIQ TeamPublished: Updated: 3 minReads: 1,648
Tips on how to save money on a kitchen renovation
0%

Did you know that renovating your kitchen is one of the best ways to add value to your home? The kitchen is usually the most used room in the house and often attracts the most attention. That is why it is important to keep it modern, practical and up to date. The downside, however, is that a kitchen renovation can be very expensive.

On this page
  1. 1. Refresh existing kitchen cabinets
  2. 2. Add decorative details to cabinets
  3. 3. Invest in new appliances
  4. 4. Turn an old table into a kitchen island
  5. 5. Refresh the kitchen worktop
  6. 6. Install new tiles or a splashback
  7. 7. Consider a bespoke kitchen from a local joiner
  8. 8. Keep the existing kitchen layout
  9. 9. Look for refurbished or second-hand items
  10. Related articles

So how can you refresh your kitchen without overspending? Below are practical tips that can help you reduce costs while still achieving a functional and attractive result.

1. Refresh existing kitchen cabinets

One of the most affordable and effective solutions is repainting or refurbishing your existing kitchen cabinets. If the cabinets are structurally sound, there is often no need to replace them completely. A fresh coat of paint can dramatically change the look of the kitchen and save thousands of euros.

If you are not confident doing this yourself, hiring a professional is still far cheaper than installing a brand new kitchen.

Tips for DIY cabinet painting:

  • Check whether the cabinet surfaces can be painted. Some laminated finishes require special primers.
  • Lightly sand the surfaces before painting.
  • Use high-quality furniture paint with a satin or semi-gloss finish.
  • A paint sprayer can help achieve an even, professional look.
  • Remove cabinet doors and paint them flat or hung up.
  • Finish with a clear protective varnish for durability.

2. Add decorative details to cabinets

Even without replacing cabinets, you can improve their appearance by adding decorative trims, plinths or new handles. If there is unused space above wall cabinets, fitting a top trim can make the kitchen look more finished and premium.

Modern kitchens often combine different colours or wood tones, so everything does not need to match perfectly.

3. Invest in new appliances

Replacing appliances can instantly modernise the kitchen. Where possible, choose appliances in a matching style to create a cohesive look.

Energy-efficient appliances also help reduce long-term running costs, making them a smart investment.

4. Turn an old table into a kitchen island

Instead of installing an expensive built-in island, consider a creative alternative. An old table or trolley can be transformed into a practical kitchen island with minimal effort.

Adding castors makes the island mobile and flexible, saving both space and money.

5. Refresh the kitchen worktop

The worktop plays a major role in the overall appearance of the kitchen. Laminate worktops are an affordable option and relatively easy to install.

Another option is using leftover stone pieces from local suppliers, which are often available at reduced prices. In all cases, proper installation is essential to ensure longevity.

6. Install new tiles or a splashback

The area behind the worktop has a big visual impact. Self-adhesive tiles or panels can be installed quickly and are budget-friendly.

For a more premium finish, traditional tiles installed by a professional can deliver long-lasting and precise results.

7. Consider a bespoke kitchen from a local joiner

When planning new cabinets, it is worth comparing options. Flat-pack kitchens can be affordable but often have a shorter lifespan.

Local joiners may be able to design and build a bespoke kitchen for a similar price, with much higher quality and better use of space.

8. Keep the existing kitchen layout

If the current layout works well, keep it. Moving the sink, oven or hob usually requires new plumbing and electrical work, which significantly increases costs.

Instead, focus on upgrading surfaces, lighting or flooring to refresh the space without major structural changes.

9. Look for refurbished or second-hand items

For accessories, lighting and even appliances, refurbished or second-hand items can offer excellent value. Online marketplaces and local sellers often have high-quality products at a fraction of the original price.

This approach not only saves money but is also more environmentally friendly.

Property marketKitchenKitchen renovation

NUMIQ Team

At NUMIQ we track current market prices for construction work in your region. Our articles are based on real data from thousands of quotes, so you know what your build or renovation will actually cost.