Price list 2026 · Europe

Tiling Services: cost per m² in 2026 and what it includes

Tiler rates for 2026, based on tile size, the surface underneath and the finishing details. Enter your square metres and you get an instant, itemised labour estimate.

Updated 09/2026·16 min read·37 price list items
Standard labour price
€39.00/ m²
Indicative range
€31.20 - €50.70
Bathroom 30 m²
€1170.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page
Short answer

Tiling with standard tiles up to 60 cm costs €39.00 per m² for labour, based on the current price list. Priming, tanking, sealing tapes, grouting, silicone and other details are priced separately, depending on what your job actually needs. You choose and buy the wall and floor tiles yourself.

Types of work and their prices

€39.00
per m²

The most common job in bathrooms and kitchens. Adhesive is applied with a notched trowel, and flatness is checked with a straightedge.

€49.00
per m²
Porcelain Over 60 cm

For larger porcelain formats, back-buttering and a levelling system are used to prevent lippage between tiles.

per m²

Slow, precise work with higher grout consumption. Typically used in shower areas or niches.

€45.00
per m²

Tiles are laid at a 45-degree angle. This involves more cuts, more waste, and a higher labour cost.

€7.00
per m²

A waterproofing slurry is applied in two coats. Sealing tapes and collars are embedded in corners and around penetrations.

€1.90
per m²

Cementitious grout is applied after the adhesive has cured. Coloured grouts can highlight the tile format, while grey is the most practical choice.

Tiling work price list 2026

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Tiling37 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Wall and floor tiling cost

Standard wall/floor tiling up to 60 cmm²€39.00 / m²m²enter quantity-
Porcelain tiling over 60 cmm²€49.00 / m²m²enter quantity-
XL format wall/floor tiling 60×120m²m²-
XXL format wall/floor tiling 120×260m²m²-
Mosaic tilingm²m²-
Natural/artificial stone / clinker tilingm²€59.00 / m²m²enter quantity-
Split face stone cladding (fences, plinth)m²m²-
Decorative strip / Listello tilinglm€2.50 / lmlmenter quantity-
Diagonal floor tiling up to 600 mmm²€45.00 / m²m²enter quantity-
Groutingm²€1.90 / m²m²enter quantity-
Silicone groutingm²€3.60 / m²m²enter quantity-
Siliconing internal corners and edgeslm€1.90 / lmlmenter quantity-
Microcement decorative coating 2-3 mmm²€80.00 / m²m²enter quantity-
Waterjet cutting 60×60 (mitred edge)lm€5.90 / lmlmenter quantity-
Waterjet cutting 120×120 (mitred edge)lm€7.90 / lmlmenter quantity-
Waterjet cutting - tile cut-outlm€10.50 / lmlmenter quantity-
Mitred edge (installation and fitting)lm€59.00 / lmlmenter quantity-
Skirting from tileslm€6.50 / lmlmenter quantity-
Cutting holes in tilespcs€12.00 / pcspcsenter quantity-
Core drilling holes in floor and porcelain tilespcs€12.50 / pcspcsenter quantity-

Sanitaryware installation cost

Bath installation (tiling work)pcs€61.00 / pcspcsenter quantity-
Bath boxing-in and waste connectionpcspcs-
Shower tray step construction and slopingpcspcs-
WC concealed cistern frame installation + boxing inpcspcs-
Close coupled WC installationpcs€45.00 / pcspcsenter quantity-
Bath / shower mixer tap installationpcs€55.00 / pcspcsenter quantity-
Basin installationpcs€35.00 / pcspcsenter quantity-
Basin mixer tap installationpcs€25.00 / pcspcsenter quantity-
Installation of glass screen on shower traypc€95.00 / pcpcenter quantity-
Installation of walk-in shower glass screen with U-channelpcpc-
Installation of glass bath screenpcpc-
Vanity unit installationpcs€60.00 / pcspcsenter quantity-
Fixing mirror with adhesivepcs€50.00 / pcspcsenter quantity-

Preparation

Primer application before tilingm²€1.90 / m²m²enter quantity-
Waterproofing (bathroom)m²€7.00 / m²m²enter quantity-
Installation of waterproofing sealing tape in cornerslm€8.70 / lmlmenter quantity-

Other works

Other unspecified workhrhr-
Total labour
- enter quantity
Create quote from price list →

How much it costs by scope

Indicative Labour Cost for a Bathroom (30 m² of Wall & Floor Tiling)
Tiling Only
Standard format up to 60 cm, excluding preparation.
€1170.00
Tiling with Grouting
Priming, tiling, and cementitious grouting.
€1284.00
Tiling with All Details
30 m² of priming, tiling, and grouting; 12 m² of tanking; 10 m of sealing tape; 8 m of silicone; 4 cut-outs; and 5 m of skirting.
€1550.70
Indicative total labour cost based on the quantities shown. Does not include tiles or the installation of sanitaryware.

Types of materials and their cost

C2TE S1 Adhesive
as required

Flexible adhesive for porcelain and large formats, priced separately according to consumption.

Primer
as required

Evens out the substrate's absorbency and improves adhesive bond.

Waterproofing Slurry/Membrane
as required

Two-part or dispersion-based waterproofing, applied in two coats in wet zones.

Grout
as required

Cementitious for standard joints, epoxy for high-stress and chemically exposed areas.

Surface preparation step by step

01
Checking the Surface

Before any tiles go on, the tiler checks that the surface is flat, solid, clean and dry enough. Bigger dips and bumps get filled with levelling compound, not hidden under a thicker layer of adhesive.

02
Priming the Surface

A primer helps the adhesive grip properly and stops the surface pulling the water out of it too fast. Absorbent surfaces like plasterboard or lime plaster always need priming.

€1.90/m²
03
Waterproofing Wet Areas

In showers and around baths, the tiler brushes on two coats of waterproofing slurry. Sealing tapes and collars go into corners and around pipes, and the tanking runs up any walls that get wet.

€7.00/m²
04
Laying Tiles to a Fall

The tiler uses a C2TE S1 class adhesive. In a shower, the floor slopes 1.5% to 2% towards the drain. Tiles over 60 cm also get adhesive spread on the back.

€39.00/m²
05
Grouting and Silicone Joints

Once the adhesive has cured, the tiler grouts the joints. Internal corners and the edge along the bath get sanitary silicone, which can flex as things move.

€1.90/lm

Method of work

  1. 01The tiler measures up, plans the joint layout and works out where the cut tiles will go.
  2. 02The tiler cleans and primes the surface, and levels it where needed.
  3. 03The tiler seals wet areas with a continuous waterproof layer and matching system components.
  4. 04The tiler sets out the tiles so the cuts end up where you notice them less.
  5. 05Tiles go on with a notched trowel, and the tiler checks flatness and joint widths with wedges or a levelling system.
  6. 06Once the adhesive has cured, the tiler grouts the joints, then seals corners and the edges around sanitaryware with silicone.
  7. 07A final clean, then the tiler taps the tiles to find any hollow spots.

5 common mistakes

01
Leaving Out Movement Joints

Without movement joints around the edges and across big areas, tiles can crack or come loose. Edge joints should sit behind skirting or be filled with silicone.

02
Only Tanking the Floor

In a shower, the tanking has to go up the walls too. If it doesn't, water gets behind the tiles and within a few years damp shows up in the room next door.

03
Sticking Tiles On with Dabs

A tile that isn't fully bedded in adhesive sounds hollow and can crack when weight goes on it. On floors, the adhesive always has to cover the whole surface.

04
Large Tiles Laid without Levelling Clips

With tiles over 60 cm, it's hard to keep the edges level with each other without levelling clips, and raised edges are easy to trip on.

05
Grouting Before the Adhesive Cures

If the grout goes in before the adhesive has fully cured, it won't bond properly and can drop out over time.

Installing Sanitaryware After Tiling

Once the adhesive has cured and the grouting is done, the bath, WC, basin, taps, cabinets or mirrors can go in. These are separate items on the price list and aren't part of the indicative tiling cost, because the work involved depends on how your bathroom is being fitted out.

Bath installation (tiling work)€61.00/pcs
Bath boxing-in and waste connection
Shower tray step construction and sloping
WC concealed cistern frame installation + boxing in
Close coupled WC installation€45.00/pcs
Bath / shower mixer tap installation€55.00/pcs
Basin installation€35.00/pcs
Basin mixer tap installation€25.00/pcs
Installation of glass screen on shower tray€95.00/pc
Installation of walk-in shower glass screen with U-channel
Installation of glass bath screen
Vanity unit installation€60.00/pcs
Fixing mirror with adhesive€50.00/pcs

The quality of tiling shows in the details

A tiler does more than most people expect. They prepare the substrate (the wall or floor surface the tiles go onto), fix wall and floor tiles, waterproof wet areas and finish the grout joints, flexible joints and edges. You will usually call one in for a bathroom, a toilet, a kitchen splashback, a hallway or a staircase.

How do you recognise good work? A tile in the middle of the wall tells you very little. Look at the corners, at the cuts around the taps, and at the wall under side lighting, when every wave shows. The real test comes years later: a well laid floor does not start to sound hollow when you tap it.

Most of the result is decided before the first tile goes on. It depends on how flat the substrate is, which adhesive the tiler chooses and how they set out the area. Once the job is finished, you cannot change any of this without breaking tiles out.

Tile format: large format, thin slabs and mosaic

Tiles of 60 × 120 cm and larger now appear in bathrooms as well as living rooms. They have few joints and make a room feel more open. They are, however, very demanding on the substrate. The bigger the tile, the more clearly it shows every bump in the wall or floor. With large formats, the tiler therefore often levels the whole surface with a skim coat or self-levelling compound.

It helps to know that a large tile is never perfectly flat. It bows slightly during manufacture, usually in the middle of the longer side. If you lay such tiles in a half-bond pattern, the high point of one tile meets the low point of the next and a small step appears at the edge. Tilers call this lippage. For rectangular formats, manufacturers therefore usually recommend an offset of no more than a third of the length. Until the adhesive cures, a levelling system with clips and wedges keeps the edges flush.

Thin porcelain slabs are roughly 6 mm thick. They can be fixed over existing tiles and are also used on furniture and kitchen worktops. So that they do not bend while being moved, they are carried in a frame with suction cups and cut with a special cutter.

Mosaic is the opposite extreme. Small pieces on a mesh backing follow curved surfaces, niches and sloped shower floors well. Expect fixing and grouting to be slow, though, and expect to use a lot of grout.

Adhesives: what C2TE S1 means

On the adhesive bag you will find a code based on the European standard EN 12004. It looks technical, but it makes choosing an adhesive for your substrate and tile size quite simple:

  • C: cement-based adhesive, the type you will meet most often. Dispersion (ready-mixed) adhesives are marked D, and reaction resin adhesives such as epoxy are marked R.
  • 1 and 2: normal and improved adhesive. Class 2 grips more strongly, so it is the right choice for porcelain, large formats and outdoor work.
  • T: reduced slip. A tile you press onto the wall stays put instead of sliding down.
  • E: extended open time. The spread adhesive stays tacky for longer, so you do not have to rush.
  • F: fast-setting. Useful when the next job needs to follow quickly.
  • S1 and S2: deformable and highly deformable adhesive. This flexibility matters with underfloor heating, on timber and plasterboard, with large formats and outdoors.

Adhesive is spread with a notched trowel, and the notch size is chosen to suit the tile. On floors, and with large formats on walls too, adhesive also goes on the back of the tile. Tilers call this back-buttering. It is the only way to get a continuous bed with no hollow spots underneath. Checking is easy: the tiler lifts one freshly laid tile and looks at its back.

Renovation: can you tile over old tiles?

When you renovate a flat or house, it is not always worth stripping the old tiles. If the existing tiles are firmly stuck, do not sound hollow when tapped and the substrate does not move, new tiles can go straight on top. You save the demolition, a great deal of dust and time. The old surface needs a thorough degreasing, then a bonding primer made for non-absorbent surfaces, and the new tiles go on with a deformable adhesive.

There are catches, though. The floor rises by the thickness of the new tile plus adhesive, which can cause trouble at thresholds and doors. Sometimes a door has to be trimmed. On walls, the new layer stands proud of the door frame and builds up around the taps, which then need extending. Any old tiles that sound hollow in places must come off and the area must be made good.

If the bathroom pipework is being replaced as well, the old tiling usually comes off entirely. Leave bathroom electrics to a qualified electrician: in many countries, work in bathrooms falls under special rules and has to be done or signed off by a competent person. If you live in a block of flats, talk to the building management or owners' association before touching risers or shared pipes. And if you plan to move partition walls or alter other parts of the structure, check with your local building authority first what your local building regulations require for your case.

Setting out and joint width

An experienced tiler does not start fixing straight away. First they set out the area and work out where the cuts will fall. The aim is equal cuts on both sides of a wall and no thin slivers next to the door, window or bath, which always look like a makeshift fix. Where possible, the wall joints line up with the floor joints so they continue into each other at the corner. Tap and waste outlets are placed in the middle of a tile or exactly in a joint.

How wide should the joint be? That depends on the tiles. Rectified tiles have their edges ground to a precise size after firing, so they can be laid with a narrow joint of about 2 mm. Non-rectified tiles vary slightly in size and need a wider joint to even out the differences. Tiles are never laid with no joint at all, because each tile needs a little room for small movements.

The grout colour changes the look more than you might expect. Grout in the same shade as the tile makes the surface look calmer, while a contrasting colour picks out the format and pattern. Light grout on a floor gets dirty quickly, which is why grey is a more common choice for floors.

Underfloor heating and movement joints

Tiles suit underfloor heating very well, because they conduct heat well. They should only be laid once the heating has been commissioned and the screed has dried to the moisture level the manufacturer specifies. A deformable adhesive is used so it can cope with the floor moving as it warms up and cools down.

Movement joints in the tiling must sit exactly above the joints in the screed, not somewhere next to them. Further joints go around the edges of the room along the walls and at thresholds, and large areas are split into smaller bays. These joints are not filled with grout but with a flexible sealant or a movement joint profile. Without them, tiles crack or come loose as temperatures change.

Kitchen splashback

The tiling between the base units and the wall cabinets is done after the base units and worktop are fitted, or working from an exact kitchen drawing. The tiles then start just above the worktop and the joint between them is sealed with silicone. If you tile before the kitchen goes in, take the tiles a few centimetres below the planned worktop height. Otherwise an ugly gap may be left once the worktop is in place.

Behind the cooker and hob, grout soaks up grease quickly. A larger format with fewer joints helps, as does epoxy or water-repellent grout. Plan the sockets before tiling so that they sit centred on a tile or on a joint, rather than randomly across a tile edge.

Mitred edges, skirting and other details

External corners are finished either with a trim or with a mitred edge. A mitre means the tile edge is ground at 45° and the two tiles meet neatly at the corner. It looks cleaner, but it takes more work and leaves no room for error. With glazed tiles whose body is a different colour, a lighter strip may show along the ground edge, so a trim is the more sensible choice for those tiles.

A tiled skirting protects the bottom of the wall from the mop and vacuum cleaner. It can be cut from the same floor tiles or bought ready-made. Holes for sockets, taps and waste pipes are drilled with diamond core bits. Breaking out the edges by hand easily damages the tile.

Outdoors: terraces, balconies and steps

Only frost-resistant tiles with very low water absorption belong outdoors, and that usually means porcelain. Ordinary ceramic absorbs water, which expands when it freezes and breaks the tile apart. The adhesive also has to be deformable and rated for exterior use.

A balcony or terrace needs waterproofing under the tiles. The surface needs a fall away from the wall of the house and drainage at the edge, for example a drip edge or a channel. Why does this matter so much? Water trapped under the tiles freezes in winter and lifts them off. Larger terraces therefore use drainage systems that carry water away from under the tiles, or slabs on pedestals with open joints. If you live in a block of flats, the balcony and its waterproofing are often part of the shared building. Speak to the building management or owners' association before any work starts.

On steps, safety comes first. Treads need a slip-resistant surface, and the front edge of each step should be finished with a stair nosing trim or a special step tile that will not chip underfoot. All steps must be the same height, because even a difference of one centimetre makes people trip. Ceramic tiles fixed in adhesive are not suitable for driveways or anywhere cars drive. Block paving or stone paving on a gravel bed belongs there.

DIY guide: replacing a cracked tile

You can replace a single cracked wall or floor tile without damaging its neighbours. The one condition is that you have a spare from the original delivery.

  1. Cover the surrounding tiles with masking tape so they do not get scratched.
  2. Rake out the grout around the cracked tile with a grout scraper or an oscillating multi-tool.
  3. Drill several holes in the tile or score it across, then break it out with a chisel working from the centre towards the edges, never from the edges inwards.
  4. Clean the old adhesive off the bed so the surface is flat and the new tile will not stand proud.
  5. Spread deformable adhesive on the substrate and on the back of the new tile, then press the tile in flush with its neighbours.
  6. Check it with a spirit level or straightedge laid across the neighbouring tiles, and insert spacers so the joints stay even.
  7. Once the adhesive has cured as stated on the packaging, grout the joints and wipe off the excess with a damp sponge.
  8. If tiles keep cracking in the same spot, look for a hollow under the tile or movement in the substrate, not a fault in the tile itself.

Whenever you have tiling done, keep a few tiles from the same production batch. Shades vary between batches, and the same tile is often no longer on sale a few years later.

How to check the finished work

  • Check flatness with a 2 m straightedge; steps between neighbouring tiles should be minimal
  • Tap the tiles to make sure none sound hollow
  • Joints are straight, even in width and fully filled
  • Cuts are clean and symmetrical, with no thin slivers by the door or bath
  • Corners and joints with the bath, basin and shower tray are sealed with silicone, not grout
  • In the shower, water runs to the drain and does not pool anywhere
  • Movement joints are filled with flexible sealant or a profile
  • The surface is clean of adhesive and grout residue

Frequently asked questions

Tiling with standard tiles up to 60 cm costs €39.00 per m² for labour, based on the current price list. Priming, tanking, grouting, silicone sealing and tricky details are charged as separate items.

Related work

Wall and floor tiling
Tiling and Paving Installation up to 60 cm

How wall and floor tiles up to 60 cm are laid, what the substrate needs, which adhesive to choose, common mistakes and how to check the work.

Wall and floor tiling
XL wall and floor tiles 60×120

How 60×120 wall and floor tiles are laid: preparing the substrate, adhesive, levelling clips, cutting, typical mistakes and checking the finished work.

Wall and floor tiling
Large Format Tile and Slab Installation (120 x 260 cm)

How 120 x 260 cm tiles and slabs are laid, what the wall or floor underneath must be like, which tools are used and what to check at handover.

Wall and floor tiling
Mosaic Tiling

Mosaic tiling in bathrooms, showers and kitchens. How it is laid, which adhesive and grout to choose, what makes it harder and how to check the result.

Wall and floor tiling
Grouting Wall and Floor Tiles

How wall and floor tiles are grouted, which grout to choose, the mistakes to avoid and how to check finished grout lines.

Wall and floor tiling
Silicone Sealant Application for Tiles and Paving

Where silicone belongs instead of grout, which type to choose, how to apply it neatly and how to check finished joints in bathrooms and kitchens.

Wall and floor tiling
Diagonal Tile Laying - Cost & Price List

How floor tiles are laid at 45°, when a diagonal layout is worth it, what makes the job harder and how to check the finished floor.

Wall and floor tiling
Decorative Tile Trims (Listels / Bombati)

How listels and bombato trims are set into wall tiling, what makes the job harder, common mistakes and how to check the finished work.

Wall and floor tiling
Installation of Mitred Tile Edges (Jolly Edges)

How a mitred Jolly edge is made on tiles, when it suits better than a trim, what makes the job harder and how to check the finished corner.

Wall and floor tiling
Natural Stone, Artificial Stone, or Klinker Brick Cladding

How natural stone, artificial stone and clinker brick slip cladding is fitted, where each material suits, mistakes to avoid and how to check the work.

Wall and floor tiling
Split-Face Stone Cladding - (Concrete Fencing, External Plinth/Sill)

How split-face stone cladding is fitted to fences and plinths: natural or cast stone, the right adhesive, common mistakes and checking the finished work.

Wall and floor tiling
Tiled Skirting / Wall Base Installation - Interior

How tiled skirting is fitted: cut strips or ready-made pieces, the fixing method, typical mistakes and how to check the finished work.

Preparation
Waterproofing Coating (Around Bathtub, Around Washbasin, Under Shower Tray)

How bathroom waterproofing is applied under tiles, around the bath, washbasin and shower tray, which materials to use and how to check the work.

Preparation
Applying Waterproofing Tapes to Corners

How to apply waterproofing tapes to bathroom and shower corners, which tapes and corner pieces to use, and what to check before tiling.

Sanitaryware installation
Constructing and Creating a Fall for a Shower Kerb

How a built-up shower kerb and base is constructed, what fall it needs, which materials suit it and what to check before tiling and at handover.

Sanitaryware installation
Bath Installation and Waste Connection

How a bath is fitted properly: levelling, waste and trap connection, boxing in, waterproofing and sealing, plus common mistakes and how to check the work.

Wall and floor tiling
Waterjet Cutting 60 x 60 cm (Mitred Edge)

How a mitred edge is waterjet cut on 60 x 60 cm tiles, when it works better than a metal trim, and how to check the finished outside corner.

Wall and floor tiling
Waterjet cutting of 120×120 tiles with a Jolly edge

How large 120×120 slabs are cut by waterjet with a 45° Jolly edge, what to prepare, which mistakes to avoid and how to check the finished corner.

Wall and floor tiling
Waterjet Cutting (Mitred Edge) - Tile Cut-out

How a waterjet cut-out in a tile is made, when it is worth it, what to prepare before ordering and how to check the finished pieces.

Sanitaryware installation
Bath Panel Enclosure

How a built-in bath is boxed in, which materials to use for the panel wall, why waterproofing and an access hatch matter, and how to check the finished work.

Sanitaryware installation
Basin Installation

How wall-hung, vanity and inset basins are fitted, what to watch with fixings and connections, and how to check the finished job.

Sanitaryware installation
Installing a Bathroom Vanity Unit

How floor-standing and wall-hung vanity units are fitted, what makes the job harder, the mistakes to avoid and how to check the finished work.

Sanitaryware installation
Adhering a Mirror

How to stick a mirror to plaster, plasterboard or tiles, which adhesive to choose, what to avoid and how to check the finished job.

Sanitaryware installation
Installing and Connecting a Close-Coupled WC

How a close-coupled WC is fitted and connected, which waste outlet you have, what complicates the job and how to check it stands firm and does not leak.

Sanitaryware installation
Installing a Geberit WC Frame with Boxing-In

How a Geberit concealed WC frame is fitted and boxed in with aerated concrete or plasterboard, what to prepare, how to check the work and what to avoid.

Sanitaryware installation
Fitting a Water Tap

How basin, kitchen sink and wall-mounted taps are fitted, what you can do yourself, how to avoid leaks at the seals and how to check the finished job.

Sanitaryware installation
Fitting a Bath or Shower Mixer Tap with Shower Head Holder

How a bath or shower mixer tap is fitted, how wall-mounted, deck-mounted and concealed types differ, and how to check the finished job for leaks.

Wall and floor tiling
Cutting Holes in Tiles & Paving

How holes and cut-outs are made in wall tiles, floor tiles and porcelain, which tools are used, what to avoid and how to check the finished work.

Wall and floor tiling
Core drilling round holes in porcelain and ceramic floor tiles

How round holes are drilled in porcelain tiles with a diamond core bit, what to prepare, how to avoid cracked tiles and how to check the finished job.

Wall and floor tiling
Silicone Sealing of Corners and Joints

How to seal corners and joints in bathrooms and kitchens with silicone, which sealant to choose, how to remove old silicone and check the result.

Wall and floor tiling
Installation of Large Format Porcelain Tiles (over 60cm)

How large format porcelain tiles over 60 cm are laid, what substrate and adhesive they need, typical mistakes and how to check the finished work.

Sanitaryware installation
Walk-in shower screen installation in a U channel

Walk-in shower glass in a U channel: how it is fitted, fall and tanking, glass thickness, why the job is charged by the metre and common mistakes.

Wall and floor tiling
Microcement

How microcement is applied to floors, walls and showers, which substrate it needs, how coats and sealer go on, which mistakes to avoid and what to check.

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.