Building work price list: Cutting Paving Slabs 4-6 cm Thick
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Paving cost | ||||
| Cutting block paving, 4-6 cm thick | lm | €3.50 / lm | lm | enter quantity- |
| Laying block paving, 4-6 cm thick | m² | €11.00 / m² | m² | enter quantity- |
| Laying block paving, 8-10 cm thick | m² | m² | - | |
| Laying decorative block paving | m² | m² | - | |
| Surcharge for small pavers up to 10×10 cm | m² | €5.50 / m² | m² | enter quantity- |
| Cutting block paving, 8-10 cm thick | lm | €5.50 / lm | lm | enter quantity- |
| Jointing with silica sand | m² | €1.90 / m² | m² | enter quantity- |
| Final sanding and brushing into joints | m² | €1.00 / m² | m² | enter quantity- |
What cutting 4-6 cm paving involves and when it is needed
Block paving is laid in a regular pattern, but the area around a house rarely is. At kerbs, walls, manholes, channel drains and curves a full block will not fit, so it has to be cut to size. These edges decide whether the finished area looks tidy and whether the edge blocks start to move over time.
Blocks 4 to 6 cm thick are commonly used for paths, patios and areas around a house. Cutting is needed on almost every new area, as part of laying block paving 4 to 6 cm thick. It is also needed when repairing or extending existing paving, when adding a manhole, drainage channel or post to a finished path, and wherever the paving meets the house wall, steps or a flower bed. Visible edges are cut with a diamond blade. Edges that will be hidden by a kerb or lawn can also be split with a block splitter.
What to decide before the paving is laid
How many cuts there will be and how good they look is largely settled before the first block goes down. When these points are agreed in advance, there are fewer cuts, the pieces are larger and the paving holds together better.
- Where to start laying: paving is normally laid from the most visible or straightest edge, for example the house wall or the entrance. The cuts then fall on a less noticeable side, such as the lawn edge.
- Setting out the pattern: it pays to measure the area before laying and shift the pattern so that narrow slivers do not appear at the edges. As a rule, an edge piece should be at least half the width of a full block. Small triangles and thin strips are hard to lock in, break out under load and eventually come loose. Sand and weeds then take their place.
- Direction and type of pattern: laying at 45 degrees or in herringbone produces far more angled cuts at the edges than a straight bond. With shaped blocks, the manufacturer often supplies half blocks or edge blocks, which reduces the number of cuts.
- Manholes, covers and gullies: their position and finished level should be known in advance. Where possible, it makes sense to align them with the pattern.
- Cutting or splitting: agree where a block splitter is acceptable and where a clean sawn edge is wanted. A clean cut matters mainly on visible edges by the house and at the entrance.
Price per running metre: what affects the cost of cutting 4-6 cm paving
Cutting paving is usually priced per running metre of cut, meaning the total length of all cuts, not the area of the whole paving. Some contractors charge cut-outs around manholes, posts and downpipes separately per piece, because they take longer than a straight cut. The guide price for labour is €3.50 per running metre. For a breakdown of the related items, see the overview of block paving and edging costs.
The price depends less on the size of the area than on how much detail it has. A simple rectangular patio between straight kerbs only needs cutting on two sides. An area around a house with corners, manholes, rainwater downpipes and a curved bed can have several times as many edge cuts. The final cost varies mainly with these factors:
- Shape of the cut: a straight cut along a straight kerb is the cheapest. Angled cuts in a diagonal pattern take longer. Curves, where every block has a different shape and is often cut in several short sections, can be several times more labour-intensive.
- Cut-outs and details: an L-shaped cut-out or a cut around a round cover means careful measuring, several cuts on one block and a higher risk that the block breaks and another one is needed.
- Thickness and hardness of the blocks: 6 cm blocks take longer to cut than 4 cm blocks. Blocks with a hard stone aggregate in the surface wear the blade faster.
- Required edge finish: a clean cut on a bench saw at the front entrance is slower than splitting blocks along an edge that the lawn will cover.
- Decorative paving: a coloured face layer, textured surface or stone-effect finish needs more careful cutting, because every chip shows. Small cobbles are a separate case, covered by the surcharge for paving small cobbles up to 10x10 cm.
- Uneven kerbs: if the kerb line wanders, every edge block has to be measured and cut individually, which slows the work noticeably.
- Cutting into existing paving: when a manhole or channel has to be added to old paving, the blocks are first lifted, cleaned and relaid. This takes more work than cutting on a new area.
- Small jobs: with only a few metres of cutting, setting up the tools and travel also feed into the price, so the rate per running metre tends to be higher.
When comparing quotes, it is worth asking how the cuts are measured and whether the price includes bedding the cut pieces, blade wear, cleaning the surface and removing offcuts.
How cutting 4-6 cm paving is done step by step
The full blocks are laid first, right up to the edge of the area. The remaining gap at the kerb or wall is left open. Only then are the pieces cut, because every edge is a slightly different size and judging it by eye does not work.
- Marking out: the block is placed in position and the cutting line is marked directly from the kerb or wall. For curves, a template or string line is used. Along a long straight edge, a string line can mark the cut for a whole row at once.
- Securing: the block is placed on a firm base so that it does not move during cutting. Otherwise the cut easily ends up crooked.
- Cutting: the blade is guided slowly along the line without forcing it. Ideally the cut is made wet on a saw designed for wet cutting. The water cools the blade and suppresses dust.
- Checking and finishing: the piece is tried in place. Sharp burrs are ground off.
- Bedding: the cut piece is set into the bedding sand and levelled with the neighbouring blocks. Finally the whole area is compacted with a plate compactor and the joints are filled with sand.
- Cleaning: dust and slurry from cutting are rinsed off the surface before they dry, and offcuts are cleared away.
What paving is cut with and when to use each method
Four types of tool are used for concrete block paving. Each suits a slightly different situation.
- Angle grinder with a diamond blade for concrete: quick to use and able to make cuts in place and along curves. It needs a steady hand, however. Edges chip more easily, and dry cutting produces a lot of dust.
- Bench saw for paving with water cooling: gives a straight, clean cut and suits a larger number of straight cuts. Water greatly reduces dust.
- Petrol cut-off saw with a large blade: used mainly for thick blocks and kerbs, where a smaller grinder does not have enough cutting depth.
- Block splitter (guillotine): splits the block rather than cutting it. It is fast and dust-free, but the edge is not smooth. It is suitable where a kerb or lawn will cover the edge, not for visible details.
The blade should be chosen to suit the material. For concrete, use a concrete blade or a general-purpose construction blade; for natural stone, a blade for hard materials. An unsuitable or worn blade overheats, cuts crooked and tears the edges.
4 cm and 6 cm blocks: how cutting differs
Block thickness relates to what will walk or drive over the paving. Blocks 4 cm thick are usually used for paths and patios for pedestrians only. Blocks 6 cm thick are the most common around houses and are also used for driveways and parking for cars. The manufacturer of the specific product always states its intended use.
When cutting, the key factor is the cutting depth of the blade. A larger angle grinder with a 230 mm blade cuts through both 4 cm and 6 cm blocks from one side. That does not mean in a single pass. The blade is worked into the material gradually, in several passes along the same line, so that it does not overheat and the edge does not chip. A smaller grinder with a 125 mm blade cuts roughly 3 cm deep, so the block has to be cut from both sides. The two cuts must then line up exactly.
With 6 cm blocks on a driveway, every poorly cut edge shows more. A car pushes on the edge blocks as it passes, and a small or badly locked piece soon works loose.
Thicker blocks of 8 to 10 cm, used for areas with more frequent or heavier traffic, take longer to cut and are often cut on a larger saw or with a cut-off saw. Laying block paving 8-10 cm thick is a separate item, and the price on this page applies only to 4 to 6 cm paving.
What should be ready on site
Cutting goes faster when the contractor does not have to wait for anything. Before the contractor arrives, it helps to have ready:
- finished kerbs and manholes: kerbs firmly bedded, covers and gullies at their finished level. Later adjustments mean redoing pieces that have already been cut,
- a cutting area: a level, firm surface away from the laid paving, where a bench saw can stand and slurry water can drain away,
- water and electricity supply: a bench saw needs water and power. If these are not available, petrol equipment is used and the work tends to be dustier,
- enough spare blocks: the contractor does not have to save every piece and can replace a spoiled cut straight away. If blocks run short, work stops until more are bought,
- timing agreed with the neighbours: cutting is noisy and dusty. If neighbours cannot tolerate dusty work or there is little space around the house, the job becomes more complicated.
Rainy or very cold weather also extends the work. Wet blocks are slippery, slurry is hard to rinse off, and in frost the cooling water cannot be used safely.
Typical cutting mistakes and how they show up later
Dry cutting over laid paving. Concrete dust combined with water or dew forms a film on the surface that is difficult to remove. Slurry from wet cutting must also be rinsed off before it dries. Otherwise grey stains remain on the paving, which are particularly visible on coloured blocks.
A cut piece simply dropped in, not levelled with its neighbours. This creates a lip that people trip over and that breaks out during compaction.
Gaps that are too wide at the kerb or manhole. A gap filled only with sand washes out, the blocks spread apart and the edge of the paving starts to break up.
Cuts from both sides that do not meet. A step remains on the edge, or the block snaps off at an angle when finished off. On a visible edge this spoils the appearance; on a hidden edge the piece sits less securely.
Cutting with a worn blade. A crooked cut and torn edges show straight away, and the only fix is to replace the whole block.
A block splitter on a visible edge. A rough, uneven edge at the front door or along a wall looks untidy and cannot be improved without replacing the blocks.
How to check the finished cutting
When signing off the work, walk the whole edge of the paved area and focus on these points:
- cuts are straight or follow the curve smoothly without steps,
- edges on the visible side are not chipped or cracked,
- edge pieces are not too small and are held firmly between their neighbours and the kerb,
- edge blocks do not rock or sink when stepped on,
- the joint at the kerb or wall is even and filled with sand,
- cut pieces are flush with the surrounding paving and do not form a lip,
- there are no wide gaps around manholes and covers that would be filled only with sand,
- there are no dried traces of dust or slurry from cutting on the surface,
- offcuts and waste have been cleared from the paving and its surroundings.
DIY guide: a straight cut in 4-6 cm paving with an angle grinder
Straight cuts on a patio or path made of 4 to 6 cm blocks can be done without a contractor, provided there is experience with an angle grinder. Complex curves and visible edges are safer left to a contractor with a bench saw. Concrete dust contains silica, which harms the lungs, so protective equipment should never be skipped.
Warning about water: a standard electric angle grinder is not designed for wet cutting and must not be used with water. Water may only be used with equipment that the manufacturer has designed for wet cutting, such as a bench saw with water cooling. Even then, the extension lead and socket must not lie in water. If the socket is not protected by an RCD, the supply should be checked by an electrician.
- Put on safety glasses, an FFP2 or FFP3 respirator, ear defenders, gloves and sturdy footwear.
- Check that the grinder has its guard fitted and a diamond blade designed for concrete, and that the blade is not damaged.
- Place the block in position and mark the cutting line along its full length with a pencil or marker.
- Lay the block on a firm base away from the laid paving and secure it so that it cannot move.
- Cut dry, slowly and without forcing. First score the whole line shallowly, then deepen the cut gradually in several passes until the blade goes through the full thickness or reaches its maximum depth.
- If the grinder cannot reach the full depth, turn the block over and finish the cut from the other side exactly on the same line.
- Try the piece in place and lightly grind off any unevenness.
- Bed the piece, level it with the surrounding blocks using a rubber mallet and rinse the dust off the surface.
Frequently asked questions
The guide price is €3.50 per running metre. Straight cuts along a straight kerb tend to be cheaper. Curves, cut-outs around manholes, hard or decorative blocks and cutting into existing paving increase the price.
A block splitter is fast and dust-free, but the edge is rougher and less accurate. For visible edges at a patio, wall or entrance, a sawn cut is more suitable. A splitter is sufficient where a kerb, gravel or lawn will cover the edge.
A grinder with a 125 mm blade cuts roughly 3 cm deep, so the block has to be cut from both sides and the cuts must line up exactly. A larger grinder with a 230 mm blade cuts 6 cm blocks from one side. For a larger number of straight cuts, a bench saw is more practical.
If a very narrow sliver would be left at the edge, the contractor prefers to split the remaining space into two pieces of similar width. This means the last full block before the edge is cut too. There are more cuts, but both pieces are large enough to lock in well and stay put under load.
For a simple rectangular area, an allowance of around 5 % is usual. Curves, many cut-outs and diagonal laying need a larger allowance. It is also worth keeping a few blocks for later repairs, so that the shade matches.
Dust and slurry should be rinsed off with water as soon as possible, before they dry. A dried film can sometimes be removed with a cleaner for concrete block paving. It should always be tested first on an inconspicuous spot, following the paving manufacturer's instructions.
Related work
How 4 to 6 cm block paving is laid for paths and patios: sub-base, bedding, falls, jointing, typical mistakes and how to check the finished area.
How block paving is laid for driveways and paths, when 4 to 6 cm blocks are enough, when you need 8 to 10 cm, what sub-base it needs and what to check.
Why setts and cobbles up to 10x10 cm cost extra to lay, how hand laying works, what base they need and how to check the finished surface.
How thick block paving for driveways and parking is cut: tools, method, common mistakes, how it differs from thinner paving and how to check the cuts.
How to spread sand over finished paving and brush it into the joints, which jointing material to choose, why to use a plate compactor and how to check the result.
What does block paving cost per m² in 2026? Labour price list for excavation, sub-base, laying blocks and setting kerbs, plus a quick estimate in NUMIQ.