Final Spreading with Joint Brushing

Final spreading with joint brushing is the last stage of laying block paving: dry sand is brushed into the joints and compacted with a plate compactor. The guide price is €1.00 per m², depending mainly on the material and the shape of the area.

Updated 09/2026·10 min read·8 price list items
Standard labour price
€1.00/ m²
Indicative range
€0.80 - €1.30
60 m² flat
€150.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Final Spreading with Joint Brushing

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Paving and block paving8 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Paving cost

Final sanding and brushing into jointsm²€1.00 / m²m²enter quantity-
Laying block paving, 4-6 cm thickm²€11.00 / m²m²enter quantity-
Laying block paving, 8-10 cm thickm²m²-
Laying decorative block pavingm²m²-
Surcharge for small pavers up to 10×10 cmm²€5.50 / m²m²enter quantity-
Cutting block paving, 4-6 cm thicklm€3.50 / lmlmenter quantity-
Cutting block paving, 8-10 cm thicklm€5.50 / lmlmenter quantity-
Jointing with silica sandm²€1.90 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

What final spreading is and why paving needs it

Joint sanding is used on concrete block paving and on natural stone setts laid on a sand or grit bed. Dry sand is spread over the finished surface and brushed into the gaps between the blocks until they are completely full. It is one stage within the wider block paving and edging work, and it closes the job.

The blocks are not bonded together. A paved area stays stable because of a sound sub-base, a level bedding layer and full joints. Through a full joint, each block bears against its neighbours, and they bear against the edging kerbs, so the whole area acts as one unit. If a joint stays empty, the block moves under load and starts to rock. Gradually the neighbouring blocks shift as well. Jointing is therefore not cosmetic. It is part of the load-bearing performance of the paving.

Grass reinforcement blocks are a different case. Their openings are filled with topsoil and seed or with gravel, depending on whether the area is meant to grow over with grass. Normal sand jointing is not used on them.

When jointing is needed and what to agree beforehand

Final spreading is done in two situations:

  • New paving: sanding and compaction complete the laying. Without them the area is not finished, even if it looks it.
  • Maintenance and repair: over time, rain washes sand out of the joints, wind blows it away and sweeping or jet washing pulls it out. When the joints are visibly empty, weeds grow in them or the blocks start to rock, it is time to top up the sand.

Before ordering the work, it is worth agreeing a few points with the paving contractor:

  • Material: kiln-dried sand, polymeric jointing sand or fine grit, depending on the type of paving and the joint width.
  • What the price includes: whether it covers the material, compaction and repeated topping up, not just one sweep.
  • Removing surplus sand: when and who will sweep it off if a thin layer is left on the surface for a while.
  • Cleaning old joints: on a repair, whether removing weeds and dirt is included.

Which jointing sand to choose for block paving

The choice depends on the joint width, the load on the area and how much maintenance you are prepared to do.

Kiln-dried sand

The usual choice for paths, patios and yards. It is a dry, fine, clean sand, typically graded roughly 0 to 2 mm. It flows well even into narrow joints. Its drawback is that rain and sweeping gradually wash part of it out, so it needs topping up from time to time.

Polymeric jointing sand

Sand with a binder that hardens after it is wetted with a fine spray. It washes out less and makes it harder for weeds to grow. It suits driveways and busy areas. It is, however, less forgiving of mistakes. The surface must be perfectly clean before wetting, otherwise grey haze marks stay on the blocks. It must also not rain before the binder has set, or the rain will wash it out and the joints will not firm up. The manufacturer states the minimum joint width and depth and the curing time, and these must be followed.

Fine grit

For paving with wider joints and for permeable paving, which is designed to let water through, fine stone grit is brushed into the joints as recommended by the paving manufacturer. Ordinary sand would wash out of such joints quickly.

How much sand is needed

Consumption depends on the joint width and depth and on the block size. For standard block paving with narrow joints, allow roughly 3 to 5 kg of sand per m², more for wider joints and smaller blocks. For polymeric sand and grit, the manufacturer gives the coverage on the bag. It is worth keeping some spare for topping up after compaction.

If you are unsure which material to use, check the paving manufacturer's technical data sheet or installation guide. Manufacturers often state which material and grading they recommend for the joints.

How to brush sand into block paving step by step

Jointing comes only after the blocks have been laid, the edging set and the edges cut in, whether the job is laying block paving 4 to 6 cm thick for paths and patios or heavier paving. The method is simple, but thoroughness is what counts.

  1. Check and clean: make sure both the paving and the sand are dry. Sweep off offcuts, cutting dust, leaves and soil. On old paving, first scrape weeds, moss and soil out of the joints.
  2. Spread the sand: scatter the dry sand over the area in a thin, even layer.
  3. Brush: work the brush in alternating directions, ideally diagonally across the joints. This makes the sand drop into the joints rather than stay on the surface.
  4. Compact: run a plate compactor fitted with a protective rubber or polyurethane paving mat over the area several times. The blocks settle into the bedding and the sand in the joints is compacted.
  5. Top up: after compaction the sand in the joints drops. Add more and brush it in again. Repeat until the joints are full to the top edge.
  6. Final clean: sweep off the surplus sand. With standard sand, a thin layer is sometimes left on the surface so that foot traffic and rain work it into the joints. On new paving this is often left for one to two weeks before the rest is removed.
  7. Extra steps for polymeric sand: all compaction and topping up is done while everything is still dry. The surface is then cleaned perfectly, for example with a leaf blower, and only at the end is it lightly wetted according to the manufacturer's instructions. Once wetted, the area is not compacted again.

Why is one sweep not enough? In a narrow joint the sand initially lodges only near the top. Only compaction and repeated topping up get it down to the full depth. Only a full joint really holds the blocks in place.

What affects the price of jointing and brushing

The guide labour price is €1.00 per m². The actual cost depends mainly on how much handwork and how many repeat passes the area needs:

  • Size and shape of the area: a large, flat area with a simple shape goes quickly, and the plate compactor turns easily on it. Small areas usually cost more per m², because setting up and transporting the equipment takes just as long.
  • Complexity: curves, steps, kerbs and the areas around inspection chamber covers and gullies have to be finished by hand. These are much more labour-intensive than an open area.
  • Joint width: narrow joints fill more slowly and need more rounds of brushing and compaction. Small units with many joints, covered by the surcharge for paving small cobbles up to 10x10 cm, also take longer to fill.
  • Block surface: textured or tumbled blocks hold sand in small hollows, so cleaning off takes longer.
  • Material: polymeric sand costs more than kiln-dried sand and takes longer to work with, as it needs thorough cleaning, wetting and watching the weather. The difference in material cost shows in the price per m² if the material is included.
  • New paving or repair: repairing old paving is usually more work than a new area. Where joints are heavily overgrown, cleaning can take longer than the jointing itself.
  • Compaction: if the price includes hiring and operating a plate compactor, it will be higher than for brushing alone. Without compaction, however, new paving is not finished. This applies all the more to driveways built by laying block paving 8-10 cm thick.

What makes the job easier and what slows it down

The weather often decides the date. It pays to have everything ready so the contractor does not need to come back several times:

  • Dry forecast: plan the work for a period that should stay dry for at least one to two days, and for polymeric sand in line with the manufacturer's curing time.
  • Clear area: move the car, plant pots, garden furniture and wheelie bins.
  • Space for materials: provide access and a place to put down the bags of sand, ideally under cover so they stay dry.
  • Water: for polymeric sand, have an outside tap and a hose with a fine spray nozzle available.
  • Keep the area clear: during the work and shortly after, keep children, dogs and cars off the paving so they do not bring in dirt or disturb the sand.

Mistakes that only show up later

The area may look finished, but after the first winter the blocks start to rock. The cause is almost always in the joints.

  • Working in the wet: damp sand clumps and stays on top. Once it dries it falls out and the joints are left half empty.
  • Joints filled only at the surface: after the first rain the sand drops and the blocks lose support. This shows as rocking and clicking underfoot.
  • Skipping compaction: the blocks do not settle and the sand is not compacted. The area spreads sooner, especially on driveways.
  • Compacting without a protective mat: the steel plate scratches or chips the block edges. The damage is permanent.
  • Compacting a wet or dirty surface: dirt is pressed into the surface and leaves stains that are hard to remove.
  • Unsuitable material: loamy, dusty or too coarse sand does not fill the joints. It can also stain light-coloured paving.
  • Strong water jet: pressure washing straight after jointing flushes the sand out of the joints.
  • Wrong order with polymeric sand: if the area is compacted after wetting, binder that has started to set is broken up in the joints and smeared over the surface. The joints then do not hold and the blocks are left with haze marks.

DIY guide: brushing sand into joints

You can do the jointing or a sand top-up yourself, following the same steps as above. A plate compactor can be hired from a tool hire shop. Ask for one with a protective paving mat. Wear ear defenders and sturdy footwear when compacting. Brushing dry kiln-dried sand raises fine dust, so on a larger area wear a dust mask and work when there is no strong wind. For paving that belongs to a block of flats, agree the work in advance with the managing agent or the residents' management company.

Points to watch when working yourself:

  1. Buy sand intended for paving joints, with some extra according to the coverage, and store it dry. Cover opened bags.
  2. When repairing old paving, clean the joints out to depth, for example with a joint scraper.
  3. Work in smaller sections so the sand does not blow away or get damp.
  4. Run the plate compactor from the edges towards the middle in overlapping passes, and do not let it stand in one spot.
  5. For polymeric sand, keep to the order of steps above and the manufacturer's instructions.

How to check the finished joints

When signing off the work, or after jointing it yourself, go over the area carefully, ideally in daylight.

  • Full joints: the joints are full to the edge of the blocks, with no visible gaps.
  • Stability: no block rocks or clicks when walked on.
  • Level: the surface is even, with no sunken spots around kerbs and inspection chamber covers.
  • Block edges: they are not scratched or chipped from compaction.
  • Clean surface: there are no dirt stains or polymeric sand haze marks on the paving.
  • Surplus sand: it has been removed, or it has been agreed when it will be swept off.
  • Material record: you know which material was used, for later top-ups.

After the first heavy rain it is worth checking the area again. If the sand in the joints has visibly dropped, top it up and brush it in.

Frequently asked questions

As a guide, €1.00 per m². The price goes up for complex areas with curves and inspection covers, narrow joints, textured blocks, polymeric sand and, on old paving, joint cleaning.