Building work price list: Surcharge for Paving Small Cobbles (up to 10x10 cm)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Paving cost | ||||
| Surcharge for small pavers up to 10×10 cm | m² | €5.50 / m² | m² | enter quantity- |
| Laying block paving, 4-6 cm thick | m² | €11.00 / m² | m² | enter quantity- |
| Laying block paving, 8-10 cm thick | m² | m² | - | |
| Laying decorative block paving | m² | m² | - | |
| Cutting block paving, 4-6 cm thick | lm | €3.50 / lm | lm | enter quantity- |
| Cutting block paving, 8-10 cm thick | lm | €5.50 / lm | lm | enter quantity- |
| Jointing with silica sand | m² | €1.90 / m² | m² | enter quantity- |
| Final sanding and brushing into joints | m² | €1.00 / m² | m² | enter quantity- |
What the surcharge means and when it applies
This is not a separate job. It is an extra charge for the small format. A quote will show a base item for laying the paving and a surcharge for small cobbles on top, both priced per m². The overview of block paving and edging costs shows how these items fit together in a typical project.
Typical materials are granite setts, natural stone mosaic and small concrete setts. The same area takes several times as many pieces, and each one has to be set by hand. The surcharge most often appears for house entrances, footpaths, edging round flower beds, decorative patterns and repairs to old street paving.
Why the small format costs more
With larger block paving, one piece covers a fair amount of ground. Small setts are different: one square metre takes dozens to hundreds of pieces. Each one has to be picked up, placed, levelled and checked. The work is much slower, even when the area does not look large.
The second reason is accuracy. A larger format hides small deviations, small setts do not. If a course drifts slightly at the start, the error grows over a few metres and the pattern goes crooked. It cannot be corrected later without relaying. A good paver therefore checks the level, the joints and the line of the courses continuously, not just at the end.
Natural stone adds one more factor: the setts are not all the same height or shape. Each one has to be tapped into the bed until its top sits flush with its neighbours. Handwork is the rule with small setts.
Where small setts work well and what to watch
Small setts follow curves, gentle slopes and irregular shapes well. That is why they are used in conservation areas, on older properties and wherever a surface should look fine and hand-crafted. On a good sub-base, loads spread across many pieces and the surface lasts a long time.
Bear in mind that there are a great many joints. If they are not properly filled, rain washes them out, dirt collects and weeds grow through. Any error in level also shows immediately. Most later problems, however, come from a poor sub-base rather than from the setts themselves.
For large, simple areas where appearance is not the priority, small setts are less worthwhile. Laying is slower and joint maintenance more demanding. They are often combined: the main area in block paving or large slabs, with small setts only as a border, a strip at the entrance or a decorative feature. For the main area see laying block paving 4 to 6 cm thick for footpaths and patios, or laying block paving 8-10 cm thick for driveways.
What to decide before placing the order
With small setts, many things cannot be changed once work has started, or only at the cost of lost time. It pays to be clear on the following:
- Material: concrete setts are uniform in size and quicker to lay. Granite or other stone setts are more durable and look more natural, but every piece is different and the work takes longer.
- Pattern: straight courses, a bond, arcs or fans. Ideally it should be drawn with dimensions and agreed before work starts, not worked out during laying.
- What will use the surface: foot traffic or cars. This determines the depth of the sub-base and whether the setts are laid on a sand or grit bed or in concrete.
- Levels and falls: where the water should drain and how the surface meets the door threshold, a step, a path or the road. A fall of about 2 % away from the building is usual.
- Joints: sand, fine grit or a bound jointing compound. Unbound joints let water through, bound joints resist washing out better when the setts are laid in concrete.
- Kerbs and edging: which type, at what height and whether they will be visible or flush.
- Consents: if the paving forms a new driveway or a connection to the road, check with the local council in advance whether planning permission or other consent is needed, for example for a dropped kerb. Check the Planning Portal before you start: residential permitted development rights only apply to houses, and listed buildings and conservation areas have stricter rules. For a block of flats, changes to a shared yard are agreed with the managing agent or the freeholder.
When comparing quotes, check whether the surcharge covers only laying the setts or also the sub-base, edging and jointing. These are often listed as separate items.
How small setts are laid, step by step
The process is similar to standard paving. The difference lies mainly in the pace, the checking and the compaction method:
- Setting out: the area is marked with pegs and string lines, and levels, falls and the direction of the courses are fixed.
- Excavation and formation: the soil is dug out and the formation is levelled and compacted.
- Sub-base: crushed stone or a granular sub-base material is laid and compacted in layers. The depth depends on the expected loads and the ground.
- Edging: kerbs are bedded and haunched in concrete. They hold the edges and define the line of the area.
- Bedding layer: fine grit or sharp sand, or a cement-based mix on a rigid base, is spread and screeded level.
- Laying the setts: the setts are laid by hand to the string line and pattern, and each one is tapped down with a rubber mallet or a small hammer. On a sand or grit bed they are laid slightly proud, roughly 1 cm, because they settle during compaction. The exact surcharge depends on the depth and material of the bed.
- Continuous checking: after each course or section, the level is checked with a straight edge, along with joint width and the line of the courses.
- Jointing: joints are filled with sand, fine grit or jointing compound.
- Compaction: the method depends on the bedding. Setts on sand or grit are vibrated with a plate compactor fitted with a rubber mat so the surface is not scratched. Very small setts and mosaic can shift or tip under the plate, so a lighter plate is used carefully with the joints already filled, or the work is done by hand only. Setts laid in fresh concrete or a mortar bed are not plate compacted, they are tapped level as they are laid.
- Finishing: joints are topped up and the surface is cleaned.
For areas used only on foot, the sub-base is usually around 15 to 20 cm deep. Where cars drive over the surface it is deeper, around 25 to 30 cm, and more on weak ground. The bedding layer is around 3 to 5 cm. The exact build-up has to suit the ground and the actual loads. When laying in concrete, follow the mortar or concrete manufacturer's instructions and allow the full curing time before the surface is used.
Price of the small cobble surcharge per m² and what affects it
The guide labour price is €5.50 per m². The final surcharge is not the same everywhere. The work takes longer, and therefore costs more, mainly because of:
- Sett size: the smaller the setts, the more pieces per m² and the slower the work. Mosaic of around 4 to 6 cm takes more effort than setts just under 10 cm.
- Material: irregular natural stone instead of uniform concrete setts. Stone setts have to be sorted by height and adjusted more, so the work is noticeably slower.
- Pattern: a complex pattern such as arcs, fans, fish scales or mixed colours can take several times longer than straight courses.
- Irregular layout: small, broken-up areas with corners, steps, inspection chambers and a lot of cutting. With a small format, every cut means more pieces that have to be trimmed precisely. For larger units see cutting paving slabs 4-6 cm thick.
- Condition of the base: a poor or unfinished base that has to be put right first. This is usually priced separately but also slows down the laying.
- Bedding method: laying in concrete with bound joints takes more effort than a grit bed with sand joints.
- Access: difficult access where materials cannot be delivered to the area and have to be barrowed or carried by hand.
- Job size: on a very small area, such as a short border, the work is spread over few square metres and the price per m² comes out higher.
On the other hand, straight courses, a larger continuous area, a well-prepared base and clear access all help considerably.
How to prepare so work does not stall
Much depends on what the client has arranged before the paver arrives. Work goes faster when:
- the material is delivered on time and in full, ideally from one batch so the setts match in colour,
- the levels of thresholds, inspection chambers and gullies are marked in advance,
- other trades, for example for water pipes or drainage, have finished their work under the area,
- water and electricity are available on site for cutting and mixing,
- it is clear where excavated soil and waste will go, for example a skip, and the carrier who takes it away is registered with the Environment Agency and gives you a waste transfer note,
- the area is kept clear during the work, with no parked cars and no walking on unfinished sections.
Rain and frost slow the work down. Setts cannot be laid accurately on a waterlogged bed, and laying in concrete needs a suitable temperature for setting. Changes to the pattern during the work also cause delays.
Typical mistakes and how they show later
Poorly compacted sub-base. Over time hollows and ruts appear, especially where foot or vehicle traffic is heaviest. The repair means lifting the setts, recompacting the base and relaying.
Missing or insufficient fall. Water ponds on the surface or soaks towards the house. In winter it freezes in the joints and loosens the setts.
Setts laid without allowance for settlement. After compaction the surface drops below the kerbs and thresholds. A step forms at the entrance and water collects at the edge.
Pattern not planned in advance. Narrow slivers result at the edges. They hold poorly and look untidy.
Uneven joints. They spoil both appearance and stability. Where a joint is too tight, setts bear on each other at the arrises and chip. Where it is too wide, the filling washes out quickly.
Poorly filled joints. The setts loosen and start to move, and dirt and weeds get into the joints.
Missing or badly set edging. The paving spreads at the edges and setts tip out of the area.
Wrong vibration. Without a rubber mat, stone or coloured concrete setts are left with scratches and chipped edges. Too heavy a plate on mosaic shifts the setts and breaks up the pattern.
Using the surface before the concrete has cured. With setts laid in concrete, they come loose and the joints crack.
How to check the finished surface
- the surface is even, with no obvious dips or proud setts under a long straight edge,
- no sett moves or rattles when walked on,
- joints are even and completely filled,
- courses and the pattern are straight, curves flow smoothly, and lines do not wave when viewed from a distance,
- there are no narrow or broken slivers at the edges,
- after rain the water drains away without puddles, with the fall away from the house,
- the surface meets thresholds, inspection chambers and gullies without steps,
- the setts are not scratched or stained with mortar,
- the edging is firm and the paving fits tightly against it,
- the surroundings are clean and surplus material has been removed.
With sand joints, it is worth agreeing who will top them up after the first few weeks and when, because the filling naturally settles.
DIY guide: a small border or path in small setts
A short garden path or bed edging is manageable as a DIY job if you have patience. For a driveway or a large area it is wiser to use a professional, because the base has to carry a car. Before digging, check whether underground services such as electricity cables, gas pipes or water pipes run through the area. Do not interfere with them and leave any diversion to a suitably qualified professional. Any work on gas pipes must be done by a Gas Safe registered engineer. If you smell gas, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland).
- Set out the area with pegs and string, and mark the levels and fall.
- Dig out to the required depth and compact the bottom.
- Lay crushed stone or sub-base material in layers and compact each layer.
- Bed the edging in concrete and let it harden.
- Spread a bed of fine grit and screed it level with a straight edge.
- Lay the setts from a fixed edge to the string line, slightly proud to allow for settlement, and tap each one down with a rubber mallet.
- After each course, check the level with a straight edge and spirit level.
- Fill the joints with sand or fine grit, brush it in and compact the area carefully. For a small border, tapping down by hand through a board is enough.
- After a few days, check the joints and top them up.
Stone setts are worth sorting by height before laying. Pieces of similar height can then be laid next to each other and less adjustment is needed.
Frequently asked questions
As a guide, €5.50 per m². It is added to the price of standard paving. The amount depends mainly on the size and material of the setts, the complexity of the pattern, how irregular the area is and the access to it.
The surcharge is linked to the small format, so it usually applies to both concrete and stone setts. With natural stone the work is slower still, because the pieces vary in height and need more adjustment.
A simpler pattern, less cutting, a continuous area without unnecessary corners and a well-prepared base all help. Saving on the base or on jointing is a false economy, because later repairs cost more.
For paths and patios, a well-compacted granular sub-base with a grit bed that lets water through is usually sufficient. Concrete is used mainly where loads are higher or bound joints are required. The decision depends on the ground and on what will drive over the surface.
Sand or grit gradually settles in the joints and some is washed out by rain. It is normal to top up the joints once or twice after a while. If the setts are also moving, the cause is usually a poorly compacted sub-base or bed.
Often yes, especially granite setts, which last for decades. They need cleaning of old mortar and sorting by size. Laying takes longer because the pieces are worn and uneven.
Fully filled and compacted joints and regular sweeping, so soil does not collect in them, help most. When laying in concrete, a bound jointing compound can be used, which greatly limits weeds. It does not eliminate them entirely, because weeds still grow through cracks or where the compound comes away.
Related work
How 4 to 6 cm block paving is laid for paths and patios: sub-base, bedding, falls, jointing, typical mistakes and how to check the finished area.
How block paving is laid for driveways and paths, when 4 to 6 cm blocks are enough, when you need 8 to 10 cm, what sub-base it needs and what to check.
How block paving 4 to 6 cm and 8 to 10 cm thick is cut to fit, which tools to use, what makes it harder and how to check the finished edges.
How thick block paving for driveways and parking is cut: tools, method, common mistakes, how it differs from thinner paving and how to check the cuts.
How to spread sand over finished paving and brush it into the joints, which jointing material to choose, why to use a plate compactor and how to check the result.
What does block paving cost per m² in 2026? Labour price list for excavation, sub-base, laying blocks and setting kerbs, plus a quick estimate in NUMIQ.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.