Dismantling traditional timber roof structures

Dismantling a traditional timber roof means taking the cut roof structure apart in a set order. The guide price is €1.90 per running metre of timber removed. Timber size, condition, building height and access affect the cost most.

Updated 09/2026·11 min read·4 price list items
Standard labour price
€1.90/ lm
Indicative range
€1.52 - €2.47
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Dismantling traditional timber roof structures

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Roof carpentry4 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Dismantling cost

Dismantle framed roof structureslm€1.90 / lmlmenter quantity-
Dismantle old roof trussm²m²-
Dismantle roof sarkingm²€1.60 / m²m²enter quantity-
Dismantle pitched roof battensm²€2.70 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

What a traditional cut roof consists of and why it is not pulled down in one go

The work covers rafters, purlins, ties, collars, posts and wall plates. This type of roof is called a cut or traditional roof because its members are joined with carpentry joints and support one another. The roof covering sits on battens fixed across the rafters. The rafters bear on purlins, the purlins are carried by posts, and the wall plates transfer the load into the masonry or a ring beam. Ties and collars brace the whole frame across its width.

A roof is dismantled when it can no longer safely carry the covering, when the timber is damaged by damp or insects, or when an extra storey, a new roof shape or a loft conversion is planned. This is not ordinary demolition. The roof frame holds the whole roof together and often also steadies the gable walls. It is therefore taken apart so that nothing moves before it should.

When it makes sense to dismantle the roof

The most common reason is a long-term leak. Water slowly rots rafter feet, wall plates and joints. The timber softens, splits and loses strength, even though the roof may still look fine from outside. In practice, the true condition often only becomes clear once the covering has been stripped.

A careful look inside the loft is worthwhile. Warning signs include:

  • dark stains and a musty smell,
  • fine, powdery dust under the timbers, which points to wood-boring insects,
  • soft rafter feet that a screwdriver goes into easily,
  • a sagging roof slope or cracks in the timbers,
  • old unprofessional alterations, such as timbers cut out without replacement.

It is not always necessary to remove everything. If only a few members are damaged, a carpenter or structural engineer may propose partial dismantling and replacement of specific timbers. With widespread fungal decay or insect attack, however, replacing the whole roof structure is usually the more sensible choice, so that the problem is not carried over into the new roof.

What needs to be decided before work starts

Dismantling is only the first half of the job. Most of the decisions are therefore about what comes next.

  • Scope: full or partial dismantling. For partial work, it must be clear exactly which members stay and how they will be propped during the work.
  • New roof and temporary cover: have the design for the new roof ready and a carpenter booked before anything is taken apart. New or altered roof timbers, such as rafters, should be designed by an engineer to Eurocode 5 (BS EN 1995-1-1) with the UK National Annex. If the new roof does not follow straight away, agree who will cover the ceiling and wall heads and with what.
  • Gables: have someone assess whether the gable walls will remain stable once the purlins and wall plates are removed, or whether they need temporary bracing.
  • Roof covering: decide whether it is to be saved and reused or sent to waste.
  • Authorities and building management: before starting, check what is required by local building control and, for old fibre cement sheets or slates, how asbestos will be dealt with (more on this below).
  • Extra work: agree in writing how hidden damage found after stripping the covering will be approved and charged.

How the dismantling is carried out step by step

Everything starts with a survey. An experienced carpenter assesses the condition of the timber, the type of covering, the pitch and height of the roof, the state of the chimney and gable walls, and access to the house. Only then is the method decided. The work forms part of carpentry construction and is closely linked to the trades that follow.

  1. Survey: deciding between full or partial dismantling and planning the order of work.
  2. Making safe: erecting scaffolding, providing fall protection and marking out an exclusion zone around the house.
  3. Services: isolation of the loft wiring by a qualified electrician and checking whether other cables run through the loft, such as an aerial or lightning protection.
  4. Roof covering: stripping the covering, then removing the battens and counter-battens, flashings and gutters. Where the roof has boarding, roof decking removal is done at this stage too.
  5. Propping: temporary support of weakened parts of the roof and, where needed, bracing of the gable walls.
  6. Dismantling: releasing members gradually, from the less loaded ones to the main structural timbers, in small sections.
  7. Releasing fixings: carefully removing the wall plate straps and anchors without damaging the ring beam or wall head.
  8. Lowering: lowering timbers to the ground in a controlled way rather than throwing them down.
  9. Clean-up and covering: sorting materials, removal from site, cleaning the ceiling and masonry, and weatherproofing the building if the new roof does not follow immediately.

Why does the order matter? The members of a cut roof support and stabilise one another. If a purlin or post is cut too early, a larger part of the roof can shift and load a gable or ceiling that was never designed for it. A tall gable wall that has lost the support of the roof can become unstable in strong wind. It is therefore braced during the work and may later be altered to suit the new roof.

Cost of dismantling a roof per running metre

The guide price for the labour is €1.90 per running metre. Running metres are measured by the length of members removed, that is the total length of rafters, purlins, ties and other timbers, not by roof area. Length alone does not set the price, though. Price lists for this work are usually also broken down by timber section. Heavy purlins, wall plates and large posts cost more per metre than lighter rafters and ties. The covering and battens are normally priced separately, often by roof area.

Two houses with the same roof area can mean very different jobs. A bungalow with a simple pitched roof, good access from the road and room for a skip next to the house is the easier case. The main factors that raise the cost are:

  • Timber section: large old timbers are heavy, are taken apart in shorter lengths and take longer to lower.
  • Building height and roof pitch: a two-storey house with a steep roof needs more scaffolding and fall protection, and the work goes more slowly. This adds noticeably to the cost.
  • Roof complexity: dormers, valleys, hips and chimneys mean more short members, more joints and more careful work near masonry.
  • Timber condition: badly decayed timber needs more propping because it can break where it is least expected. This is one of the factors that add most to the labour.
  • Roof covering: heavy or brittle coverings take longer to strip, and saving them for reuse slows the job further.
  • Access: carrying materials by hand through a garden or the house takes far more effort than lowering them straight into a skip.
  • Problem materials: asbestos coverings and chemically treated timber are a separate cost for removal and disposal.
  • Partial dismantling: often more demanding per running metre than full removal, because the remaining structure must be kept stable throughout.

When comparing quotes, look at the scope, not just the total. Ask how the contractor measures running metres and which members are included. Also check whether the quote covers the roof covering, scaffolding, skip, removal, clean-up and temporary weatherproofing.

What makes the job easier and what slows it down

A lot of time can be saved before the carpenters arrive. It helps if they have clear access to the roof from day one and do not have to wait for other trades.

  • Cleared loft: everything stored in the loft should be removed. Otherwise it has to be moved around, and anything left behind is exposed to dust and debris.
  • Electrician booked in advance: if the wiring is isolated before work begins, the carpenters do not have to stop.
  • Space for a skip and scaffolding: if the skip or scaffold is to stand on the road or pavement, arrange the necessary licence from the council in good time.
  • Neighbours informed: in terraced or semi-detached housing, let the neighbours know, move cars out of the danger zone and agree any access over their property.
  • Protecting the interior: cover furniture and floors in the rooms below the loft, as dust and old loft debris can fall through gaps in the ceiling.
  • Timing and weather: plan for a period of settled weather and so that the carpenter can start the new roof straight after dismantling.

Safety, permissions and asbestos

This is work at height on old and often weakened timber. The contractor should provide fall protection, safe access, hard hats and harnesses, and keep everyone out of areas where material may fall. In terraced housing, neighbouring gardens, windows and cars must also be protected. If a gas pipe or flue runs through the loft, any work on it must be done by a Gas Safe registered engineer.

Removing a roof structure is work on the load-bearing structure of the building. Whether your project needs building regulations approval or planning permission should always be checked before work is ordered, particularly if the shape, height or pitch of the roof will change. Check the Planning Portal before you start: planning permission and building regulations approval are separate, and even permitted development usually still needs building regulations approval. In Scotland, changing a roof or other structural elements needs a building warrant from the council before work starts. Listed buildings and conservation areas may have additional requirements. In a block of flats, do not start without the consent of the freeholder or management company, as the roof is usually a shared part of the building.

Older roofs often have fibre cement slates or corrugated sheets that may contain asbestos. These must be dealt with under the Control of Asbestos Regulations 2012, and asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. In homes built before 2000, have suspect materials tested before anything is drilled, cut or demolished. Before work starts, ask the contractor for evidence of their training and, where required, their licence. Do not break or cut such materials yourself.

Removal and sorting of materials

An ordinary roof produces a surprising amount of material. It is worth sorting it on site:

  • timber, meaning rafters, purlins, battens and ties,
  • roof covering by type,
  • metals such as nails, screws, straps and flashings,
  • mixed construction waste and old insulation.

Sound timbers free of rot and insects can be reused for outbuildings or garden structures, ideally after cleaning and treating the timber. Rotten, infested or timber treated with older chemicals does not belong in a new structure and should not be burned in a stove or fireplace. Agree in advance where the skip will stand and who will remove what. Before you hand over the rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.

Typical mistakes and how they show up later

Starting without a survey. Anyone relying on how the roof looks from outside will run into rotten wall plates or infested timbers during the work. The plan changes on the go, extra work piles up and the risk of something moving unexpectedly grows.

Cutting timbers without temporary propping. Part of the roof can drop or push out a gable. The result is often cracks in the gable wall, a damaged chimney or a ceiling hit by an impact it was not built for.

Unbraced gable. A tall gable wall without the support of the roof can crack or lean in the wind. The fault often only appears a few days later when the weather changes.

Ripping out fixings roughly. The ring beam or wall head gets damaged, and the new wall plate then cannot be fixed securely without repairs.

Throwing heavy pieces off the roof. Besides the risk of injury, it damages the facade, windows, paths or the neighbour's property. The damage is then dealt with afterwards, often at the client's expense.

Leaving the house open. One heavy downpour is enough to soak the ceilings and wall heads. It shows as damp patches on ceilings, falling plaster and later mould.

All waste in one skip. Mixed waste costs more to dispose of, and if it contains asbestos or chemically treated timber, the waste site may refuse it altogether.

Extra work not agreed. When hidden damage appears, a dispute arises over who pays. Work stops and the house is left open.

How to check the finished work

Before signing off, walk round the site with the contractor:

  • the agreed scope has been removed and any retained members are stable,
  • the gable walls stand firm or are braced, and together with the chimney and ceiling are undamaged,
  • the wall heads and ring beam are clean, without broken areas left by fixings, and ready for the new wall plate,
  • any hidden damage to masonry or ring beams has been recorded and photographed,
  • the building is weatherproofed if the new roof does not follow immediately,
  • no nails, broken covering or insulation remains are left on the ceilings,
  • loft wiring is safely isolated and made safe as agreed with the electrician,
  • waste has been removed and you have a waste transfer note,
  • the surroundings, facade and windows are undamaged.

Frequently asked questions

As a guide, €1.90 per running metre of roof timbers removed. The final figure depends mainly on timber section, building height, roof pitch and complexity, timber condition and access. The covering, scaffolding, skip and removal are often charged separately.