Building work price list: Roof decking removal
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Dismantling cost | ||||
| Dismantle roof sarking | m² | €1.60 / m² | m² | enter quantity- |
| Dismantle old roof truss | m² | m² | - | |
| Dismantle pitched roof battens | m² | €2.70 / m² | m² | enter quantity- |
| Dismantle framed roof structures | lm | €1.90 / lm | lm | enter quantity- |
What roof decking is and how to tell it is damaged
Roof decking is a layer of timber boards or OSB sheets nailed to the rafters. The roof covering or waterproofing sits on top of it. It forms the solid base of the roof. The covering, whether tiles, slates, metal sheet or shingles, is only the outer layer that protects the house from rain and snow.
Decking needs to be removed when the timber has rotted, has been attacked by wood-boring insects or has been damaged by water after a long-term leak. It is also removed when the roof build-up is being changed, for example to insulate the loft or a room in the roof. Decking cannot be replaced without taking off the covering first, so removal is almost always preceded by stripping the roof covering.
Damaged decking is hard to spot from outside, because the covering hides it. Warning signs usually appear in the loft or on the ceilings of the top floor. Look out for:
- dark stains and damp patches on the timber or ceilings,
- a musty smell that does not go away after airing,
- soft or mouldy boards,
- daylight showing through,
- fine wood dust (frass) below small holes in the timber. This is usually a sign of wood-boring beetles.
If the damage is limited to one spot, for example after a falling branch, replacing a few boards is often enough. When the timber is damp and affected over a larger area, piecemeal repairs rarely last and the problem returns. In that case the whole of the decking is removed.
What to decide before placing the order
- Scope: whether all the decking is being replaced or only part of the roof. The scope should be described specifically in the contract, stating the area or the parts of the roof.
- Covering: whether it is in good condition and should be stacked and reused, or whether it will be discarded.
- Membrane or felt on the decking: whether the waterproofing layer should stay, or whether its replacement is planned from the start.
- What comes next: new decking in the original build-up, or a new build-up with insulation. This determines how the open roof is handled and who takes over after the removal. Re-roofing should follow BS 5534:2014+A2:2018, including mechanically fixed ridges and verges and an underlay suited to the wind zone.
- Timing: it pays to plan the removal for a period of more settled weather and to coordinate it with fitting the new decking.
Types of decking and how removal differs
Older houses usually have decking made of boards roughly two to three centimetres thick. With close-boarded decking the boards are laid tight together, with open boarding there are gaps between them. Boards can be replaced one at a time, but they absorb moisture more readily.
Newer roofs use OSB sheets. They tolerate short-term damp, but with a long-term leak they swell and lose strength. The sheets are larger and heavier, so handling them on the roof calls for more care.
On a flat roof the decking carries the waterproofing and often the insulation as well. The layers are usually bonded or mechanically fixed together, so they cannot simply be separated. Before work starts, a specialist should decide which layers can be kept and which have to be removed entirely.
On pitched roofs with close-boarded decking there is usually bitumen felt or a roofing membrane laid on the boards. It tears easily during removal. If it is to stay, it must be handled very carefully. If it is old and brittle, its replacement should be planned from the outset.
How the removal is carried out step by step
Professional removal is more than ripping off boards. Each step follows on from the previous one, and skimping on preparation shows up later both on the roof structure and on the budget.
- Inspection of the roof and loft: a carpenter assesses the decking, rafters, purlins, membranes and the moisture in the timber, and sets the scope of work.
- Making the site safe: scaffolding or fall-arrest systems, roof ladders, protection for operatives and fencing off the area below the roof where material may fall.
- Stripping the covering: tiles are taken off course by course, metal sheets are unscrewed, felt is cut away. Covering in good condition can be stacked and reused. Where tiles sit on battens, removing the battens from the pitched roof follows before the decking itself.
- Removing the decking: boards are levered off gradually and carefully so the rafters are not damaged. OSB sheets are cut into smaller pieces as needed so they can be lowered safely.
- Nails: old nails are drawn out of the rafters or cut off so they do not get in the way when the new decking is fitted.
- Checking the exposed roof structure: timber moisture, insect attack or rot, cracks and the condition of joints. Damaged members are dealt with before the roof is closed up again.
- Temporary cover: the roof is sheeted over with a tarpaulin if the new decking is not fitted the same day.
- Waste and clean-up: waste is sorted and taken away, and the site is cleaned.
Why check the roof structure at this point? Because it is the only time the whole of it is visible. Once it is covered with new decking, hidden rot is much harder to deal with. If the exposed timbers only need cleaning or a protective treatment, this is the right moment for timber cleaning and treatment.
What the price depends on
The guide price for labour is €1.60 per m². It covers the removal of the decking itself. Stripping the covering, scaffolding, waste removal, temporary cover and rafter repairs are normally listed as separate items, so check in the quote which of them are included. The workload and the price are affected mainly by the following:
- Pitch and shape of the roof: a steep roof with dormers, valleys and chimneys is stripped more slowly than a simple gable roof. On a complex roof expect a noticeably higher price per m², because every detail is worked around by hand and with care.
- Access to the house: whether scaffolding can be erected and a skip placed right next to the building. When material has to be carried through the garden or lowered piece by piece, the work takes considerably longer.
- Type of decking and fixing: dense nailing makes removing the boards slower. On flat roofs, bonded and mechanically fixed waterproofing that has to be separated from the decking adds time. Large OSB sheets have to be cut up so they can be brought down safely.
- Condition of the timber: sound boards come off whole, rotten ones break and have to be removed in pieces. Badly damaged decking can increase the cost by several tens of per cent.
- Covering: if stripping it is part of the job, carefully stacking tiles for reuse takes longer than throwing them into a skip. In homes built before 2000, have suspect materials such as asbestos cement slates or corrugated sheets tested before work starts. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor, and specialist asbestos removal is a separate and more expensive item.
- Membranes and other layers: careful work with a membrane that is to be kept, or separating layers on a flat roof, adds time.
When comparing quotes, look mainly at exactly what they include. A quote without the covering, scaffolding and waste removal may only look good at first glance.
What makes the work easier and what slows it down
Besides the roof itself, it also matters how well the property is prepared for the work. The client can help mainly with the following:
- A cleared loft: items stored in the loft should be removed or covered. Levering off boards brings down dust, sawdust and old nails.
- Space for a skip and scaffolding: agreed in advance, and if the skip has to stand on the road or pavement, a skip permit from the council is needed. It is best to move the car and anything fragile away from the area where material may fall.
- Access to electricity: a working socket that the operatives can use is enough for saws and tools.
- Follow-on work: the carpenter or roofer fitting the new decking should start as soon as possible after the removal. Every day with an open roof means a risk of water getting in.
- Quick decisions: if damaged rafters are found once the roof is opened, it helps if you are available and can decide on extra work without unnecessary delay.
- Informed neighbours: on terraced and semi-detached houses the work extends to the neighbouring roof, so it helps if the neighbours know about it in advance.
On the other hand, rain, strong wind and snow slow the work down. In bad weather nobody works on the roof, and only as much is opened up as can be safely covered that day.
Permissions, flats and waste
Replacing decking to the original extent without changing the shape of the roof is usually treated as repair and maintenance, but the assessment always lies with the local authority. If the pitch, shape, height or structure of the roof is changing, if insulation is being added, or if the building is listed or in a conservation area, contact the local authority's planning and building control departments before work starts and confirm which procedure applies to your case. In Scotland, changing roofs or other structural elements needs a building warrant from the council before work starts.
In a block of flats the roof is a common part of the building. Decisions about the work are made by the freeholder or the management company, not by an individual flat owner.
Timber from the decking is construction waste and on a larger roof it is taken away in a skip. Before you hand over the skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note. Old timber treated with preservatives may count as hazardous waste. The local council or household waste recycling centre can tell you how to dispose of it. Asbestos roofing is disposed of separately and only through a specialist contractor.
Typical mistakes and how they show up later
- Starting without a thorough inspection of the roof structure: once the roof is opened, affected rafters come to light and work stops until a decision is made about them. Meanwhile the roof stays open and costs rise.
- Overlooked damage to the roof structure: if rot or insect attack is covered with new decking, it keeps spreading and the renovation becomes pointless within a few years. Where the damage is extensive, dismantling the traditional timber roof structure may be the better option.
- Cutting corners on safety: moving across exposed rafters without fall protection is dangerous and also risks damaging the rafters and the ceiling below. Work at height belongs to professionals with scaffolding and fall-arrest systems.
- Rough levering: cracked or split rafters only show up when the new decking is fitted, when nails do not hold or the roof is not flat.
- Underestimating the weather: an open roof without temporary cover can soak the insulation and ceilings in a single shower. Wet insulation loses its effectiveness, and stains and mould remain on the ceilings. A sensible contractor only opens up as much as can be covered in time.
- A torn membrane that was meant to stay: if the damage goes unnoticed, water that the membrane should have caught later runs into the structure.
- A vague agreement: wording such as "removal as required" leads to disputes. The contract should state the scope of work, the dates and the procedure for extra work, for example replacing rafters found during removal. The contractor should notify you of such work in advance and agree it with you in writing.
How to check the finished work
Once the removal is complete, walk the roof with the carpenter before fitting of the new decking begins:
- the decking has been removed to the agreed extent,
- the rafters are not cracked or needlessly damaged by levering,
- old nails have been drawn out or cut off,
- the contractor has shown you the condition of the roof structure and pointed out affected or damp members,
- any extra work has been agreed in writing,
- the membrane is either intact or its replacement has been agreed,
- the roof is temporarily covered against rain,
- retained covering has been stored so it will not be damaged,
- there are no new damp patches in the loft or on the ceilings,
- waste has been removed and the area around the house has been cleaned.
Frequently asked questions
The guide price is €1.60 per m². The final amount depends on the shape and pitch of the roof, access to the house, the type of decking and the condition of the timber. Stripping the covering and related work are usually charged as separate items.
Decking is the boarding on the rafters that forms a solid base. The covering is the outer layer that protects the house from the weather. The covering can sometimes be replaced without touching the decking, but the decking cannot be replaced without removing the covering.
On a typical family house it is usually a matter of a few working days. It depends on the area and shape of the roof, the type of decking, the condition of the timber and the weather. Erecting scaffolding, waste removal and any repairs to the roof structure need to be added. A carpenter will set a more precise schedule after the inspection.
It is not recommended. This is work at height on an exposed structure, with a risk of falls and of damaging the rafters. A non-specialist will also find it hard to assess the condition of the roof structure. The work belongs to a firm in carpentry and roofing with scaffolding, fall protection and public liability insurance.
Yes, if insulation is planned. Both jobs require opening up the same layers, so scaffolding, safety measures and transport are dealt with only once. The thickness and type of insulation should be specified by a designer or specialist to suit the condition of the roof. In England, insulation on renovations must currently meet Approved Document L (2021 edition); the new 2026 edition (Future Homes Standard) takes effect on 24 March 2027.
They need to be repaired, strengthened or replaced before the new decking is fitted. Where the damage is extensive or the load-bearing structure is affected, a structural engineer should assess it, and new or altered rafters should be designed to Eurocode 5 (BS EN 1995-1-1) with the UK National Annex.
Replacement to the original extent is usually treated as repair and maintenance, but the decision lies with the local authority. If the shape or structure of the roof is changing, insulation is being added, or the building is listed or in a conservation area, contact the local authority before work starts.
Related work
How battens are removed from a pitched roof, what makes the job harder, what to watch out for and how to check the rafters and underlay afterwards.
How a timber roof frame is safely dismantled, when it is needed, what to watch for with safety, waste and asbestos, and how to check the work.
Price list for structural carpentry in 2026: roof frames, rafters, timber floors and carports. What drives the cost and a quick estimate in NUMIQ.
How timber is cleaned and stained, what makes the job harder, which mistakes to avoid and how to check the finished surface.
How a timber joist floor is installed, which timber and build-up to choose, what makes the job harder and how to check the finished floor at handover.
How carpenters build a traditional cut timber roof on site, which roof types suit which house, common mistakes and how to check the finished frame.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.