Price list 2026 · Europe

Timber Joist Floor Installation

Timber joist floor installation means setting and fixing structural timber joists onto loadbearing walls to a structural engineer's design. The guide price is €4.50 per running metre of joist, depending mainly on section size, span and the walls.

Updated 09/2026·12 min read·9 price list items
Standard labour price
€4.50/ lm
Indicative range
€3.60 - €5.85
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Timber Joist Floor Installation

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Roof carpentry9 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Roof structure cost

Install timber floor joistslm€4.50 / lmlmenter quantity-
Install traditional pitched roof structureslmlm-
Install trussed rafters (timber connector plates)m²m²-
Install wall platelm€10.00 / lmlmenter quantity-
Install rafterslm€7.50 / lmlmenter quantity-
Install collar tieslm€5.50 / lmlmenter quantity-
Install purlins / postslm€7.90 / lmlmenter quantity-
Pitched roof truss installationm²m²-
Roof truss installation (hipped / pyramid roof)m²m²-
Total labour
- enter quantity
Create quote from price list →

What a timber joist floor is and when it is needed

A timber joist floor is made of structural timber joists that bear on external or internal loadbearing walls. Decking, insulation and then floor finishes or a ceiling are added to the joists as needed. This work typically comes up in new cottages and timber frame houses, loft conversions, and the renovation of older houses, where a heavy concrete slab would put unnecessary load on the walls. It is work for carpenters and joiners and is always carried out to a structural design. For an overview of related trades, see carpentry construction.

Compared with concrete, timber is light, easy to work and goes in without wet trades or curing time. In older houses this is often the deciding factor, because the original masonry frequently cannot carry a reinforced concrete slab.

Typical situations where a timber joist floor is the answer:

  • a new cottage or timber frame house, where a timber floor is a natural part of the structure,
  • a loft conversion, where the existing ceiling joists are not strong enough or there is no acoustic or thermal insulation,
  • renovation of an old house, where the original joists are rotten, affected by woodworm or sagging badly,
  • an exposed beam ceiling, where the joists are both the structure and a visible feature of the room.

What to decide before calling a carpenter

Be clear about what the floor will be used for. An unheated loft for storage, a habitable room with furniture and an exposed beam ceiling have very different requirements for load, insulation and finish. These determine the joist size, spacing and the whole build-up.

Joist size, spacing, bearings and fixings should be set by a structural engineer, not estimated by the tradesperson. New or altered timber structures such as floor joists should be designed to Eurocode 5 (BS EN 1995-1-1) with the UK National Annex. Replacing a floor or installing a new one is work to the structure of the building. Check with your local authority building control or an approved inspector whether Building Regulations approval is needed before work starts. In Scotland, structural alterations, extensions and loft conversions need a building warrant from the council before work starts. In a flat, also agree the work with the freeholder or managing agent.

Other questions worth settling in advance:

  • What will be above the floor: only stored items, or rooms with furniture, a bathroom or heavy partitions. The engineer needs to know what load the floor has to carry.
  • What will be below the floor: exposed joists, a plasterboard ceiling or a traditional plastered ceiling. This decides the grade of timber and the type of boarding used.
  • Where services will run: cables, ventilation ducts or waste pipes in the floor void must be planned beforehand. Joists must not be notched or drilled with larger holes afterwards without the engineer's agreement. A new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts.
  • Fire safety requirements: if the design specifies fire resistance for the floor, this affects the joist size and the type of ceiling.
  • What the quote includes: only fitting the joists, or also timber, treatment, decking, insulation, vapour control layer and removal of the old floor.

How a timber joist floor is installed step by step

The process differs between new build and an old house, where the existing floor is opened up first. The basic steps are similar:

  1. Survey: the carpenter measures the space, checks the loadbearing walls and compares the site with the drawings and structural design.
  2. Opening up in renovations: the existing joists are exposed and their ends, the pockets in the masonry and moisture levels are assessed. If anything differs from what the design assumed, the engineer is consulted before work continues. In homes built before 2000, have suspect materials tested before drilling or demolishing; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
  3. Preparing the timber: the timber is cut to length and prepared. Where specified, it is treated against fungal decay and wood-boring insects. Exposed joists are also planed and sanded.
  4. Preparing the bearings: the base in the pockets or under the wall plate is levelled and the timber is separated from the masonry with a damp-proof layer.
  5. Setting the joists: the joists are set into pockets, onto a wall plate or a beam, or into joist hangers, at the specified centres and fixed as designed.
  6. Checking level: height, level and spacing of the joists are checked throughout.
  7. Decking and further layers: boarding or decking is fixed on top and insulation is fitted between the joists. On the underside, the heated room side, a continuous vapour control layer goes up followed by the ceiling. In a habitable loft, acoustic insulation and the floor finish are laid on the decking. The exact order and materials are set by the design.

Why so much attention to level? A small difference in joist height later shows up as an uneven floor or a cracking ceiling, and fixing it means taking finished layers apart.

Timber, sizes and floor build-up

Floor joists are usually structural softwood, typically spruce or pine, often in strength class C24. For longer spans or where dimensional stability matters, glulam beams are chosen because they twist and split less. The timber must be free of rot and insect damage and, above all, dry. Kiln-dried structural timber is typically supplied at around 15 % moisture content and should not exceed about 18 %. Freshly sawn timber has far higher moisture content and is not suitable for floors.

Rough figures from practice to help understand a quote. The final values are always set by the engineer:

  • joist spacing is commonly 400 or 600 mm centres, to suit standard board sizes,
  • joist depth under normal loads works out at roughly one twentieth of the span, so around 200 mm for a 4 m span,
  • bearing in masonry is often around 150 mm deep, with a small air gap left around the joist end in the pocket so the timber can dry out.

Whether the timber needs chemical treatment depends on the conditions. Well-dried structural timber in a dry, heated interior does not always need it. In old houses, damper locations and joist ends built into masonry, treatment is common. The design decides.

The build-up depends on what is above and below the floor:

  • a ceiling below an unheated loft mainly needs thermal insulation between the joists and a vapour control layer on the underside, the heated room side, so that indoor moisture does not get into the construction,
  • a floor below a habitable loft room also needs a resilient acoustic layer on the decking with a heavier spreader board or a dry floor system on top, so footsteps are not carried into the room below,
  • an exposed beam ceiling needs better-quality timber, visible boarding, careful sanding and a protective finish, with staining an optional extra for the desired shade,
  • a concealed floor hidden above a plasterboard ceiling can be decked with OSB or structural boards, where function matters more than appearance.

Mineral wool or wood fibre insulation goes between the joists. It must fill the space evenly, without gaps or compressed areas, otherwise cold bridges and a risk of condensation result.

Timber is combustible, but a solid joist chars on the surface in a fire and loses strength gradually. If the design requires a certain fire resistance, it is achieved with larger joists or a ceiling of fire-rated plasterboard. Mineral wool in the build-up is non-combustible and helps.

Price of timber joist floor installation per running metre

The guide price for labour is €4.50 per running metre. It is charged by running metres of joists installed, not by room area. The rate per running metre covers setting and fixing the joists. Timber, decking, insulation, vapour control layer and floor layers are usually priced separately, either per m² or as materials. Always check how a particular quote is set out.

To estimate the total length, multiply the number of joists by the length of one joist including the part built into the wall. For example, a 5 m long wall with joists at 600 mm centres needs roughly 9 joists. If each is about 4.4 m long, that is roughly 40 running metres in total. The actual spacing and bearing length are set by the engineer.

The rate per running metre and the overall scope depend mainly on these factors:

  • Span and section size: long spans need deeper joists, closer spacing or beams and steelwork. Heavier joists are harder to handle and each running metre takes longer.
  • New build or old house: the simplest case is a new build with straight walls, known dimensions and good access for materials. In an old house, opening up often reveals rotten joist ends, damp walls or damaged pockets. Repairs, removing the old floor and taking away waste can raise the budget by tens of per cent. Before the old timber and rubble are taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
  • Exposed joists: an exposed beam ceiling needs better timber, accurate work, planing, sanding and a finish. It costs noticeably more than a floor hidden above a ceiling.
  • Habitable loft above: acoustic and flooring layers add extra materials and labour.
  • Access and height: if materials have to come through narrow access, up stairs or to height without a crane, installation takes longer.
  • Materials: glulam beams cost more than standard structural timber, but are often worth it for long spans.

When comparing quotes, check exactly what they include. Some cover only fitting the joists, others also timber, treatment, fixings, decking, insulation and delivery. Only quotes for the same scope of work can be compared fairly.

How long installation takes and how to speed it up

In a new build with one small room, carpenters often set the joists and decking in 1 to 3 days. A whole floor of a small house usually takes up to a week. In renovations, add time for removing the old floor, repairing pockets and any assessment by the engineer. Insulation, vapour control layer, ceiling and floor finish are further work adding several days.

Good preparation by the client saves a lot of time and misunderstanding:

  • a completed structural design and any required approval before the carpenters arrive, so nobody waits with the structure opened up,
  • a dry place for the timber under cover or a tarpaulin, not on mud in the rain,
  • weather protection during installation if the roof is open, for example after roof decking removal. Wet insulation and decking must be dried out or replaced,
  • a cleared space below the floor and in the loft, with a clear route for long joists,
  • a storage area for materials as close to the building as possible and agreed access for a delivery lorry,
  • planned services, so the electrician or plumber comes at the right time, after the joists are in and before insulation and ceiling close them up,
  • an available engineer in renovations, who can come and assess unexpected conditions after opening up.

If the roof structure is being renewed at the same time, coordinate the floor with the installation of traditional timber roof trusses or the installation of timber trussed rafter roofs, as the ceiling joists often form part of the roof structure. Work is held up when decisions on build-up or appearance change during installation, when timber arrives wet and has to be replaced, or when other trades are not ready.

Typical mistakes and how they show up later

Wet or poorly stored timber. Once built in, it dries, twists and splits. The floor above creaks and cracks appear in the ceiling.

Underestimated structural design. Excessive deflection only shows once the floor is laid or partitions are built. The floor bounces underfoot, and tiles and partitions crack.

Joist ends set straight into damp masonry without separation. This leads to rot exactly where the joist carries the most load. It shows after years, and repair means opening up the floor.

Covering old joists with new boarding without checking their condition. Rot or woodworm under the new layer carries on, it is just no longer visible.

A missing, broken or wrongly placed vapour control layer. Moisture from the room condenses in the insulation, which loses effectiveness, and the timber gets damp. It often shows as stains on the ceiling or a musty smell.

Floor fixed rigidly to the joists without a resilient layer. Every step can be heard on the floor below.

Notching joists afterwards for services. This weakens the section and the joist may sag more or crack. Services should be routed as the structural design allows.

Most of these mistakes cannot be seen once the work is finished. It is therefore worth inspecting the work before the joists are covered.

How to check the finished floor

Ideally, visit the site twice: after the joists are set and before they are covered, and again at handover. At handover, check that:

  • joist size and spacing match the structural design,
  • joist ends are separated from the masonry and sit in dry conditions,
  • fixings are as designed and the joists do not move,
  • the timber is dry, free of splits or signs of pests, and treated where the design requires it,
  • there are no notches in the joists that the design did not allow for,
  • the decking is level and does not creak when walked on,
  • insulation fills the space without gaps and the vapour control layer on the heated side is continuous, including at walls and penetrations,
  • in a habitable loft, there is a resilient acoustic layer under the floor,
  • exposed joists have an even surface and finish,
  • you have received documentation for the materials and treatment and a record of the work carried out.

DIY installation is not recommended for this work. A timber joist floor is a structural element on which the safety of the whole house depends, and it belongs in the hands of carpenters working to an engineer's design.

Frequently asked questions

The guide price is €4.50 per running metre of joist installed. The final cost depends on joist size and length, whether it is a new build or an old house, whether the joists will be exposed and what the quote includes. Timber, decking and insulation are usually charged separately.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.