Building work price list: Timber Staining/Dyeing & Cleaning
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Treatment | ||||
| Staining timber / wood + cleaning | m² | €2.50 / m² | m² | enter quantity- |
| Timber impregnation (coating / spray) | m² | €3.50 / m² | m² | enter quantity- |
What staining with cleaning involves and when it is done
The timber is first cleaned of dust, resin, grease and grey weathering. A wood stain is then applied to change or even out its colour. The grain stays visible. An opaque paint hides the grain, while a stain brings it out.
The work is most often done on exposed beams, soffits, cladding, pergolas, fences and balustrades. It is one of the finishing jobs within carpentry construction and is done either before fixing or when older timber is being refurbished. Typical situations:
- new spruce or pine timber should have a darker or warmer shade, such as walnut or oak,
- timber from different deliveries varies in colour and needs evening out,
- older external timber has weathered grey and should get back its original colour or a new one,
- new elements should match the colour of older timber in the house.
A stain on its own does not protect the wood. It is almost always followed by varnish, oil, wax or a translucent woodstain finish. When ordering the work, check whether the quote includes this protective coat or only cleaning and staining.
What to decide before work starts
Before placing the order, it helps to be clear on these points:
- Colour: the manufacturer's colour card is only a guide. Agree the shade on a sample made from the same timber that will be stained.
- Interior or exterior: this determines the protective coat and the products used.
- Before or after fixing: if the timber is not yet installed, arrange the staining with the carpenter or installer in advance. Later this option is gone.
- One product system: the cleaner, stain and protective coat should come from one manufacturer. When brands are mixed, coats often dry poorly, stay tacky or separate.
- Protection against insects and fungi: with structural carpentry timber, it must be known in advance whether and when preservative treatment will be applied, so that the coats go on in the right order.
Stain, woodstain or varnish: what to choose
A stain mainly changes colour. It soaks into the surface and highlights the grain, but it does not form a layer that resists water, sunlight and wear. A translucent woodstain combines colour with protection. It is the most common choice outdoors, for fences, pergolas, soffits and cladding. Varnish forms a hard film and suits interiors better, for stairs, banisters or furniture. Outdoors it can crack and peel as the timber moves. Oil and wax soak into the wood and give a more natural look. They are easier to touch up locally but need more frequent maintenance. Wax is for interiors only, and outdoors only an exterior-grade oil should be used.
Stains are either water-based or solvent-based. Water-based stains smell less but raise the grain, so the surface becomes rough. The method below explains how to prevent this. Solvent-based stains usually penetrate deeper but need good ventilation.
An important note on structural timber: a stain does not replace preservative treatment against wood-boring insects and fungi, which is recommended for load-bearing roof timbers. If a beam is to be both protected and coloured, check the order of coats and their compatibility in the products' technical data sheets. If a roof structure or other load-bearing element is affected by woodworm or rot, staining will not solve it. A specialist must assess its condition, and badly damaged timbers may need repair or dismantling of the traditional timber roof structure.
Cleaning and staining step by step
- Checking the timber: the tradesperson checks that the wood is dry, sound and free of mould, and whether old coats of varnish, oil or woodstain remain. The whole method depends on this.
- Masking the surroundings: with fixed timber, the walls, windows, floor or paving that stain could drip onto are covered.
- Cleaning: new timber is usually dusty from sawing, and pine or spruce often has resin around the knots. Older external timber tends to have grey weathering, moss or dark damp patches. Light dirt is removed with a brush and a suitable wood cleaner. Resin is removed with the thinner recommended by the stain manufacturer.
- Removing old coatings: any remaining varnish, oil or woodstain is sanded back to bare wood. Otherwise the stain will not soak in at those spots.
- Drying: if water is used for cleaning, the timber must then dry completely. Being dry to the touch is not enough.
- Sanding: the surface is sanded along the grain. With a water-based stain, the wood is first lightly dampened, left to dry and only then sanded. This raises the grain before staining rather than after it.
- Dust removal: sanding dust is removed thoroughly with a brush, vacuum cleaner and dry cloth.
- Colour test: a sample is made on an offcut of the same timber or in an inconspicuous spot and left to dry. The shade is judged only when dry, as wet stain looks different.
- Applying the stain: the stain is applied evenly along the grain. Long boards are coated along their full length in one go. End grain and edges are treated too.
- Drying: the stain must dry for as long as the manufacturer states.
- Protective coat: once the stain is dry, the protective finish is applied in the number of coats the manufacturer specifies. Outdoors this is a woodstain or exterior-grade oil. Varnish and wax are used indoors.
How much timber staining costs per m² and what affects the price
The guide labour price is €2.50 per m². The area actually coated is measured. For a beam or post, that means all treated faces, not just the visible one. When comparing quotes, ask how the area is measured and whether the protective coat and materials are included.
New, dry, smooth timber laid out on trestles before fixing is the cheapest to treat. The following factors increase the price:
- Fixed and hard-to-reach timber: ceiling beams or roof soffits are coated overhead, more slowly and with more masking. The work can take several times longer than on trestles.
- Old varnish, oil or woodstain: sanding it off is often more laborious than the staining itself and can raise the price considerably.
- Weathered timber, moss or mould: these need more thorough cleaning, drying time and sometimes a mould treatment.
- Intricate elements: balustrades with spindles, picket fences or pergolas with many joints, edges and corners are done by hand. They therefore cost more per m² than flat boards.
- Masking the surroundings: walls, windows or floors that need protecting add work.
- Matching older timber: if the new shade must match older wood exactly, more samples and sometimes colour mixing are needed.
- Working at height: soffits and gables belong with a firm that has scaffolding or an access platform and experience of working safely at height. Scaffolding or a platform is usually charged separately.
- Number of protective coats and type of products: each coat means another application and more drying time.
How to prepare for staining and what weather to expect
The work goes faster when:
- the timber is delivered on time, stored under cover and not freshly rain-soaked,
- there is enough space for trestles and for drying coated pieces without stacking them,
- the shade and protective finish, and possibly the brand, have been chosen,
- water and electricity are available nearby for cleaning, sanding and dust extraction,
- the area around fixed timber is cleared, for example furniture under beams or plant pots by a fence,
- the carpenter or installer knows that cuts made during fixing need to be touched up afterwards.
Rain, high humidity, frost or strong direct sun slow the work down. Outdoors, staining is done in dry weather and in shade, because on hot timber the stain dries too fast and leaves lap marks. The working temperature range is given by the manufacturer on the tin. For outdoor work, allow some slack in the schedule.
Mistakes that spoil the colour and durability
Most mistakes happen during preparation and show up only after the stain is applied or several months later:
- Stain on dusty or greasy timber: greasy spots stay light and open grain darkens. Remains of old coatings behave similarly and leave patches.
- Sanding across the grain: scratches absorb more stain and stand out. Dark lines remain, which can only be removed by sanding back and restaining.
- Staining damp timber: moisture later escapes through the coating. Blisters form and the protective coat peels, often only after several months.
- Skipping the colour test: spruce, pine and oak take the same stain very differently. The result can be much darker or a different tone from the colour card.
- Softwood without a conditioning base: spruce and pine have harder latewood and softer earlywood rings, which absorb stain unevenly. The surface then looks blotchy. Some manufacturers offer a conditioner that evens out absorbency.
- Untreated end grain: it absorbs the most water. Board and beam ends then darken, split and, on fences and pergolas, are the first to rot.
- No protective coat after staining: outdoors the colour fades quickly and the timber starts to go grey as if it had never been treated.
- Too much water pressure when cleaning: it tears soft fibres, leaves a furry surface and the stain soaks in unevenly.
- Stopping mid-surface: where coating was interrupted, a darker band forms that does not disappear when dry.
DIY guide: staining timber before fixing
A small amount of timber that has not yet been fixed can be stained without a tradesperson. Work outdoors in shade or in a well-ventilated room. With solvent-based products, wear gloves and a respirator as instructed on the tin. Leave work at height, such as soffits or gables, and treatment of load-bearing roof timbers to professionals. This applies especially when the roof is being stripped, for example during roof decking removal or removing battens from a pitched roof. The preparation and staining follow the method above. These steps help at home:
- Set up trestles so that all sides of the timber are accessible, and a drying area out of direct sun where coated pieces will not lie on top of each other.
- Buy the cleaner, stain and protective finish together and in sufficient quantity so that nothing runs out mid-surface.
- Prepare the timber following the cleaning, sanding and dust removal steps above.
- On an offcut, test not only the shade but also the technique: brush or cloth, amount of stain and speed of strokes.
- Coat hidden faces, edges and end grain first and the visible face last, so it does not need handling after coating.
- Once the stain is dry, apply a protective finish suited to where the timber will end up.
- Do not leave oil-soaked rags crumpled in a pile, as they can self-ignite. Lay them out flat in the open air or place them in a container of water as the manufacturer instructs.
How to check the finished work
Inspect the finished surface in daylight and at a low angle, when most defects are visible. At handover, go through these points:
- the colour is even and matches the agreed sample,
- there are no blotches, bands or lap marks,
- no scratches from sanding across the grain are visible,
- the surface is smooth, without raised grain or dust in the coating,
- end grain, edges and joints are treated the same as the faces,
- the protective coat has been applied and is not tacky,
- the surroundings are clean, without drips of stain on walls, windows or floors,
- you know which products were used and how to maintain the timber.
Write down the names and shades of the products used. They make it easier to achieve the same look when refurbishing later or adding new elements.
Frequently asked questions
The guide price is €2.50 per m². The final price depends mainly on whether the timber is still unfixed or already at height, whether old coatings need sanding off, how intricate the elements are and how many protective coats are applied.
Almost always. Even new timber has rough fibres from sawing and uneven absorbency. New wood needs only a light sand, while older surfaces with remains of coatings need more thorough sanding.
No. A stain changes the colour but does not keep out water or sunlight in the long term. Outdoors it must be followed by a woodstain or an exterior-grade oil.
Yes, if it is sound and healthy. Old varnish, wax or oil must be removed first and the wood sanded. The final shade on old timber often differs from the sample, so a test in an inconspicuous spot is always worthwhile.
Before fixing is easier and more thorough, because all sides can be treated, including end grain and hidden faces. After fixing, hidden areas can no longer be reached. Cuts made during fixing then need touching up.
It depends on the type of stain, the temperature and the humidity. The exact time is given by the manufacturer on the tin. In cold, damp weather timber dries more slowly, so it is sensible to wait longer.
The interval is given by the manufacturer of the woodstain or oil. In practice it depends on how exposed the timber is to sun and rain. South and west-facing sides and horizontal surfaces, such as the tops of fences, wear first. When the surface starts to fade or water no longer beads on it, maintenance is due. If the colour has faded only slightly and the protective coat is intact, cleaning and recoating the protective finish is usually enough. If the timber has already gone grey or the coating is peeling, it needs cleaning, sanding and often restaining.
Related work
Price list for structural carpentry in 2026: roof frames, rafters, timber floors and carports. What drives the cost and a quick estimate in NUMIQ.
How roof decking is removed, what makes the job harder, what to watch for with rafters and membranes, and how to check the finished work.
How battens are removed from a pitched roof, what makes the job harder, what to watch out for and how to check the rafters and underlay afterwards.
How a timber roof frame is safely dismantled, when it is needed, what to watch for with safety, waste and asbestos, and how to check the work.
How a timber joist floor is installed, which timber and build-up to choose, what makes the job harder and how to check the finished floor at handover.
How carpenters build a traditional cut timber roof on site, which roof types suit which house, common mistakes and how to check the finished frame.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.