Fitting bathroom and WC accessories

A towel rail, robe hooks, a shower shelf, a toilet roll holder and a toilet brush. Bathroom accessories are small items fitted right at the end of a renovation, yet every one of them means drilling into brand new tiles. A single cracked tile or a pipe drilled through inside the wall can spoil the whole bathroom.

Updated 11/2026·8 min read·5 price list items
Standard labour price
€12.00/ pcs
Indicative range
€9.60 - €15.60
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Fitting bathroom and WC accessories

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Bathroom renovation5 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Accessories

Installation of bathroom accessories (holders, hooks)pcs€12.00 / pcspcsenter quantity-
Installation of extractor fanpcs€45.00 / pcspcsenter quantity-
Installation of mirror with LED lightingpcs€35.00 / pcspcsenter quantity-
Fixing of mirrorpcs€40.00 / pcspcsenter quantity-
Installation of basin cabinetpcs€50.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

When bathroom accessories are fitted

Most often at the end of a bathroom renovation or a WC renovation, once the tiling is finished and grouted and the basin, taps and sanitaryware are in place. Accessories are also fitted as a separate job when replacing old ones that have rusted or come away from the wall.

This work mainly covers:

  • in the bathroom: towel holders and rails, hooks and hangers, shower shelves, tumbler and soap holders, soap dispensers, grab rails,
  • in the WC: toilet roll holder, spare roll holder, wall-mounted toilet brush, towel hook by the hand basin.

The price is charged per piece, meaning per accessory. A set that sits on the wall as one unit, for example a toilet roll holder with a shelf, is usually counted as one piece. Two separate items count as two pieces.

What to decide before the work starts

Drill or glue

Most accessories come with screw holes and wall plugs. However, adhesive systems are also available, where an adapter is glued to the tiles and the accessory slides onto it. tesa, for example, states for its system that the adhesive needs 12 hours to cure, the surface must be flat, and it is not suitable for places where water runs down the wall continuously.

  • drilling is more reliable for heavy items and those under strain: grab rails, towel rails people lean on, fold-down seats, dispensers that get pressed,
  • gluing suits rented properties, large-format tiles you do not want to drill, and light hooks and holders.

On forums, people report that a glued toilet roll holder stays on their tiles without any problems. With a soap dispenser that is pressed every day and splashed with water, though, they worry it will come unstuck and prefer to drill.

Position of each accessory

Mark the positions before the tradesperson arrives. It helps to stick a small piece of masking tape where each accessory should go and check whether it really suits you when sitting down or showering. Rough guidelines:

  • toilet roll holder: on the side wall, roughly 20 to 30 cm in front of the pan, at a height of about 65 to 75 cm from the floor to the centre of the roll,
  • towel hooks by the shower: within reach from the shower, but out of the direct spray,
  • towel rail: positioned so the towel hangs fully without touching the floor or the radiator, unless it is a holder mounted directly on the radiator,
  • shower shelves: away from the spot where the spray hits hardest, so that water does not sit on them.

What is behind the tiles

Bathroom walls carry water supply pipes, waste pipes and electrical cables. If you have photos of the walls taken before tiling, they are now invaluable. Without them a detector must be used, and the zones running vertically above the taps and horizontally from them should be avoided.

Type of wall

In brick and concrete, ordinary wall plugs of sufficient length are enough. Aerated concrete needs plugs designed for aerated concrete. A plasterboard partition will hold light hooks in cavity fixings, but heavier accessories and grab rails need a timber or metal pattress inside the partition, which must be prepared before tiling.

How the work is done step by step

  1. Checking services: using photos or a detector, the tradesperson confirms there is no pipe or cable where the hole will go.
  2. Marking out: hole positions are marked from a template or from the accessory itself, using a spirit level.
  3. Tape on the tile: masking tape is stuck over the drilling point so the bit does not skid on the glaze.
  4. Drilling the tile: with a tile bit or diamond bit, with hammer action off, at low speed and light pressure. With hard porcelain the bit is cooled.
  5. Drilling the wall: only once through the tile can you continue with a masonry bit. The hole must be deep enough for the plug to sit in the masonry, not in the adhesive and plaster.
  6. Sealing: in the shower and around the bath, a drop of silicone is injected into the hole before inserting the plug, so water cannot get behind the tiles.
  7. Fixing: the plug is pushed in so its rim does not expand inside the tile. The accessory is screwed on and levelled.
  8. Checking: the accessory is loaded by hand to make sure it does not move.

What affects the price

The guide price for labour in the price list is €12.00 per piece. The final amount mainly depends on the following:

  • number of accessories: with a single hook, most of the time goes on travel and preparation. With a whole set fitted at once, each piece works out cheaper,
  • type of tiles: hard porcelain and large-format panels are drilled slowly, with cooling and greater risk,
  • number of holes: a towel rail with two brackets and four screws is more work than a hook with one screw,
  • wall: plasterboard without a pattress or aerated concrete requires special plugs,
  • removing old accessories: pulling out old plugs and covering old holes is extra work,
  • grab rails and accessibility fittings: they must bear a person's weight, so they are anchored more thoroughly,
  • materials: the labour price does not include the accessory itself, only small fixings.

In the WC the price per toilet accessory is the same, €12.00 per piece. In practice, accessories are often combined with bonding a mirror or fitting a vanity unit, which are done during the same visit.

Grab rails and accessories for older people

A grab rail by the WC or in the shower is not an ordinary accessory. It has to support a person leaning on it with their full weight or grabbing it when they slip. That is why it is anchored into solid masonry or into a pattress in the partition, with longer plugs and screws as specified by the manufacturer. For an older person or someone with reduced mobility, the height of the toilet roll holder, grab rails and hooks is adapted to them, not to the usual recommendations. If grab rails are planned, it is best to prepare the pattresses before tiling.

What should be ready

  • the tiles are grouted and the grout has cured,
  • the accessories have been bought and unpacked, with all screws and cover caps,
  • the position of each accessory is marked or at least agreed,
  • photos of the walls before tiling or a plan of the services are available,
  • pattresses for heavy accessories and grab rails are in place in any plasterboard partition,
  • for glued accessories, the bathroom is warm and can be left unused for 12 hours.

Common mistakes and how they show up later

Drilling with hammer action

The tile cracks straight away, or a hairline crack appears that widens over time. Replacing a single tile in a finished bathroom is time-consuming, and a matching tile can rarely be found.

Drilling through a pipe or cable

The most expensive mistake. With water it shows as a damp patch behind the tiles or at the neighbours', with electricity immediately. The only way to avoid it is to check before drilling.

Plug in the adhesive instead of the masonry

A short plug only grips the tile and adhesive. The accessory works loose over time, and a towel rail or grab rail will come away together with a piece of tile.

Plug expanding inside the tile

If the plug expands within the tile, it creates stress, and the tile cracks only when the screw is tightened.

Unsealed holes in the shower

Water runs along the screw into the wall and behind the tiles. The hole also pierces the waterproofing membrane under the tiles that was meant to protect the wall. Over time the surrounding tiles loosen or mould appears in the corner.

Glued accessory in an unsuitable place

Accessory adhesives do not belong on wallpaper or painted plaster and, according to manufacturers, not in places where water runs down the wall continuously. There the accessory will sooner or later come unstuck.

Accessory fitted before the grout has cured

If you drill into freshly grouted tiles, the grout around the hole can crumble and the tile may shift when the screw is tightened. Between grouting and fitting accessories it is best to wait until the grout has cured according to the information on the packaging.

Wrong height

A toilet roll holder behind your back, or a hook only a tall person can reach. Moving it means more holes in the tiles.

How to check the finished work

  • the accessories are level; check rails and shelves with a spirit level or by eye against the tile joints,
  • they do not move or creak when loaded by hand,
  • there are no cracks or chipped glaze edges around the holes,
  • screw cover caps are fitted and no screws or plugs are visible,
  • in the shower the holes are sealed and there is no silicone squeezed out around the accessories,
  • the accessories are where you agreed and do not get in the way of the door or shower screen in use.

DIY guide: what to watch out for

A handy DIYer can manage fitting bathroom accessories. With porcelain, large-format tiles and grab rails it is better to call a tradesperson. For a DIYer the key points are:

  1. Before drilling, confirm where pipes and cables run.
  2. Switch off hammer action and use a tile bit or diamond bit.
  3. Stick tape on the tile and start drilling slowly, without pressure.
  4. With hard porcelain, cool the bit with water and take breaks.
  5. Use plugs long enough to reach into the masonry.
  6. In the shower, seal the holes with silicone before inserting the plugs.

Wear safety glasses when drilling, and for longer drilling into porcelain also a dust mask.

Frequently asked questions

The guide price for labour in the price list is €12.00 per piece, excluding the accessory itself. In the WC, fitting a toilet accessory costs €12.00 per piece. Hard porcelain, plasterboard without a pattress and grab rails tend to cost more.