Building work price list: Bathroom Vanity Unit Installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Sanitaryware installation cost | ||||
| Vanity unit installation | pcs | €60.00 / pcs | pcs | enter quantity- |
| Bath installation (tiling work) | pcs | €61.00 / pcs | pcs | enter quantity- |
| Bath boxing-in and waste connection | pcs | pcs | - | |
| Shower tray step construction and sloping | pcs | pcs | - | |
| WC concealed cistern frame installation + boxing in | pcs | pcs | - | |
| Close coupled WC installation | pcs | €45.00 / pcs | pcs | enter quantity- |
| Bath / shower mixer tap installation | pcs | €55.00 / pcs | pcs | enter quantity- |
| Basin installation | pcs | €35.00 / pcs | pcs | enter quantity- |
| Basin mixer tap installation | pcs | €25.00 / pcs | pcs | enter quantity- |
| Installation of glass screen on shower tray | pc | €95.00 / pc | pc | enter quantity- |
| Installation of walk-in shower glass screen with U-channel | pc | pc | - | |
| Installation of glass bath screen | pc | pc | - | |
| Fixing mirror with adhesive | pcs | €50.00 / pcs | pcs | enter quantity- |
When a vanity unit is fitted and what the job includes
A vanity unit hides the trap, the isolating valves and the flexible tap connectors. It also gives the bathroom storage for toiletries and cleaning products. It is usually fitted during a bathroom refurbishment or when an old pedestal basin is swapped for a furniture basin. Sometimes an old unit that has swollen from water needs replacing. The job combines two tasks: fixing the furniture securely and connecting the basin to the water supply and waste so that nothing drips. It often follows or runs alongside tiling work in the bathroom.
When getting a quote, be clear about what the job includes. The basic job is assembling and fitting the unit, fitting the basin and tap, and connecting the trap and flexible connectors to supplies that are already in place. Removing the old basin, replacing isolating valves or altering the pipework are extras. It is best to have them listed separately on the quote.
Floor-standing or wall-hung unit and choice of material
A floor-standing unit on legs carries its weight on the floor, so the wall does not have to take the full load. It suits older bathrooms with uneven floors, where adjustable legs take up the differences. It still needs some fixing, though. The basin is often screwed to the wall even with this type. The unit should also be fixed to the wall so it cannot tip over.
A wall-hung unit looks lighter and makes cleaning the floor easier. The wall, however, must carry the unit, the basin and everything stored inside.
What height to fit the basin
The usual height of the basin rim is roughly 85 to 90 cm from the floor. Taller people may prefer it higher. With a floor-standing unit the height is set by the unit, and the legs only adjust it slightly. With a wall-hung unit you choose the height yourself, so decide on it before drilling. Think about the mirror and light above the basin as well.
Which material
Resistance to moisture is what matters most:
- melamine-faced chipboard is common and affordable, but cut edges and cut-outs swell quickly if water gets to them,
- MDF machines and paints well. Only moisture-resistant MDF, which is usually greenish in the cut, copes better with damp, and only with a good lacquer on the edges too. Lacquer will not save raw cut-outs,
- solid wood looks warm but needs a good finish and regular care,
- plastic and aluminium are hardly affected by moisture and suit small bathrooms without a window.
Whatever the material, check the edges. They should have continuous ABS edging with no gaps. Gloss doors look striking, but fingerprints and water marks show more.
What to check before buying
- size: the width and depth of the unit must fit the space, clear the door frame and leave room to open the doors or drawers,
- basin and unit together: furniture basins are made for specific units, so buying them as a set is safer,
- doors or drawers: drawers need more room around the trap. A space-saving trap that runs the waste closer to the wall is often used with them,
- position of supplies: the height of the isolating valves and the waste in the wall should line up with the cut-out in the back panel of the unit,
- wall type: the fitter needs to know in advance whether the wall is brick, aerated concrete block or plasterboard, so they bring the right fixings.
How the installation is carried out step by step
- Turning off the water: the water is turned off at the isolating valves. If they do not hold, the main stopcock for the flat or house is closed. A cloth and a small container go under the trap to catch the remaining water.
- Removal: the fitter disconnects the old trap and connectors and takes down the basin and unit. Old wall plugs are removed and the holes filled.
- Checking the supplies: the fitter finds exactly where the water supplies and waste come out of the wall. If they are too high or too low for the trap of the new unit, it makes sense to alter them straight away. Once the unit is hung, this is much harder.
- Assembling the unit: the unit is assembled following the instructions. Doors and drawers are set aside for now so they are not in the way.
- Marking out and drilling: the height and fixing points are marked on the wall and checked with a spirit level. The fitter checks that no pipes run where the holes will go. Tiles are drilled with a tile bit with hammer action off. Hammer action is only switched on once the bit reaches the masonry behind the tiles.
- Fitting the unit: a wall-hung unit is hung on brackets or hangers and levelled with the adjusting screws. A floor-standing unit is levelled on its adjustable legs. It is then fixed to the wall with an angle bracket or hanger so it does not tip forward when a drawer is pulled out. The level is checked in both directions.
- Trial fit of the basin: the basin is first simply placed on the unit. This shows whether it sits properly and whether the trap cut-out is in the right place.
- Tap: the tap is often fitted before the basin goes in, because it is hard to reach from underneath later. The flexible connectors are attached to it at the same time.
- Fitting the basin: the basin is levelled. Many furniture basins are also screwed to the wall with their own fixings. The manufacturer's instructions decide.
- Connecting: the trap is connected to the basin waste and the waste pipe in the wall, and the connectors to the isolating valves. Joints are tightened with care, not force.
- Leak test: the valves are opened slowly and the water runs for a while. Every joint is checked with a dry paper towel.
- Sealant: finally, a silicone bead is run between the basin and the wall and smoothed off. It cures in the time stated by the manufacturer, usually about a day.
- Finishing: the doors and drawers are fitted and the hinges adjusted.
How to fix a wall-hung unit to different walls
A wall-hung unit is only as secure as the fixings in the wall. Fixings are chosen by wall material and total load. That load includes the unit, the basin, full drawers and a person leaning on the basin. The unit usually hangs on at least two hangers, and each needs its own fixing. The load rating of a fixing is given by its manufacturer for a specific wall material. It is worth checking and allowing a margin.
- solid brick and concrete: good-quality wall plugs and screws long enough to pass through the tile and adhesive deep into the masonry are sufficient,
- aerated concrete blocks and hollow blocks: standard plugs do not hold. Fixings designed for aerated blocks or hollow materials are used, and for heavier loads a chemical anchor,
- plasterboard: the most secure option is a timber noggin or support fitted into the stud wall before tiling. In new work it is worth planning this in advance. If there is none, the unit is fixed into the metal studs or with special cavity fixings. Plasterboard alone without support usually cannot carry a heavy ceramic basin.
How long the job takes
Fitting a new unit and basin to supplies already in place usually takes a few hours. Removing the old basin, replacing valves, altering cut-outs or difficult fixing add time, sometimes up to a full day. Altering the pipework in the wall may mean a separate visit. The basin can be used fully once the silicone has cured.
What affects the price
The guide price for labour is €60.00 per piece. It applies to fitting the unit and basin and connecting to supplies that are in the right position. A floor-standing unit against a flat wall is the least work. This is a labour price. Materials such as the trap, connectors and fixings are paid for separately, so check on the quote who supplies them.
The price goes up mainly with:
- supplies and waste outside the trap area: rerouting them is separate plumbing work and usually adds the most,
- removing an old basin with seized joints or corroded valves: adds time and may mean replacing the valves,
- a wall-hung unit instead of a floor-standing one: accurate measuring, drilling and levelling take longer,
- aerated blocks, hollow blocks or plasterboard without a noggin: special fixings cost more and take longer to fit, and with plasterboard the studs have to be found,
- altering cut-outs in the back panel or shelf: cutting and sealing the edges takes extra time,
- large ceramic basins that need two people to hold: fitting is slower and a second fitter is sometimes needed.
How to prepare for the installation
Good preparation by the customer saves a lot of time:
- the unit, basin, tap and trap are on site and have been checked for damage and missing parts,
- the height and exact position of the basin have been decided,
- the old unit has been emptied and the area around the basin is clear,
- it is known where the main stopcock is and, in a block of flats, whether a communal riser needs shutting off,
- photos of the walls before tiling, if available, show where pipes and cables run,
- tiling and sealing around the bath or shower are finished, including any bath installation and waste connection, the bath panel enclosure or building the shower kerb and its fall, so the unit does not have to come off again for other work.
The job takes longer if other trades are working in the bathroom on the same day and the fitter has to wait for space.
Typical mistakes and how they show up later
- Unit not level: if it is even slightly out, the doors do not close straight and water pools in one corner of the basin. The spirit level should be used at every step.
- Weak fixing: ordinary plugs are sometimes used in aerated blocks or plasterboard. The unit holds at first but later starts pulling away from the wall. It can come loose together with the basin.
- Sealing tape in the wrong place: connectors with a flat rubber washer are sealed by the washer, and tape on the thread does more harm than good. PTFE tape or hemp belongs on threads without a washer, for example when fitting an isolating valve.
- Unsealed cut-outs: a raw chipboard edge in the cut-out for the trap or supplies soaks up water and swells quickly. The cut-out should be as small as possible. The edge is protected by a plastic cover or grommet, edge-sealing tape, or at least silicone or lacquer.
- Kinked or too-short connectors: a connector stretched to its limit or kinked is more likely to fail. It should run freely in a gentle curve.
- Over-tightened joints: plastic trap nuts can crack and the rubber washer in a connector can be squeezed out. The leak only shows days later as a wet unit base.
- Smell from the waste: usually a badly seated trap, a missing washer or a trap that does not hold water. Tightening the joints or replacing the washer helps.
- Isolating valves boxed in: if the unit or a drawer blocks access to the valves, the water cannot be turned off quickly in a fault. The valve then cannot be replaced without taking the unit out.
How to check the finished work
- the unit is level and does not rock when pushed,
- a wall-hung unit is held firmly and does not pull away from the wall,
- a floor-standing unit does not tip forward with a drawer pulled out,
- the basin sits level and water drains towards the waste,
- after running hot and cold water for a while, all joints are dry,
- the isolating valves can be opened and closed and are accessible,
- the connectors are not kinked or stretched,
- the trap does not leak when the basin is filled and emptied,
- the silicone is continuous, smooth and without gaps,
- doors and drawers run easily and are aligned,
- cut-outs in the unit are small and sealed, and the area has been cleaned.
It is worth looking inside the unit again the next day. A dry base and a dry paper towel placed under the trap mean the joints are sound.
Doing it yourself: what to watch out for
With a drill, a spirit level and some patience, both floor-standing and wall-hung units are manageable as a DIY job. The method is the same as in the numbered list above. Get a helper for a heavy basin.
- have ready a hammer drill, a tile bit, a spirit level, a tape measure, a spanner and a sealant gun,
- before drilling, find out where pipes and cables run in the wall, and do not drill directly above or below the supplies,
- choose fixings to suit the wall and check their load rating on the packaging,
- tighten plastic nuts by hand first, then only lightly with a spanner.
If water supplies or waste in the wall need rerouting, leave it to a plumber. A badly sealed joint inside the wall only shows itself later, when the damage is greater. Moving a light or socket near the basin is a job for a qualified electrician.
Frequently asked questions
Around €60.00 per piece. The final price depends mainly on whether the unit is floor-standing or wall-hung, what the wall is made of and whether an old basin has to be removed. It also matters whether the water supplies and waste line up with the new unit.
Usually a few hours where the supplies are already in place. With removal of the old basin, valve replacement or difficult fixing, the job can stretch to a full day.
The water is turned off at the main stopcock for the flat or house. It is worth replacing the valves before fitting the unit. Later they are harder to reach, and in a fault the water under the basin could not be turned off quickly.
Silicone belongs mainly in the joint between the basin and the wall, where water runs down. A floor-standing unit does not need sealing to the floor around its edge. It is better left unsealed so the floor beneath can be cleaned and dry out.
The water can be turned on as soon as everything is connected, as the joints under the basin do not rely on the silicone. Until the silicone at the wall has cured, usually about a day, avoid splashing the back edge and do not wipe the joint. If possible, leave the basin unused until the next day.
Replacing a unit and basin on existing supplies does not usually need reporting. If the water has to be shut off for a whole communal riser, arrange it in advance with the managing agent or the building's management company.
Only if the new basin matches its size and the trap cut-out exactly and the unit has not swollen from water. If the basin overhangs or does not sit flush, water gets onto the edge of the unit and it gradually swells.
Related work
How a built-up shower kerb and base is constructed, what fall it needs, which materials suit it and what to check before tiling and at handover.
How a bath is fitted properly: levelling, waste and trap connection, boxing in, waterproofing and sealing, plus common mistakes and how to check the work.
How a built-in bath is boxed in, which materials to use for the panel wall, why waterproofing and an access hatch matter, and how to check the finished work.
How wall-hung, vanity and inset basins are fitted, what to watch with fixings and connections, and how to check the finished job.
How to stick a mirror to plaster, plasterboard or tiles, which adhesive to choose, what to avoid and how to check the finished job.
How a close-coupled WC is fitted and connected, which waste outlet you have, what complicates the job and how to check it stands firm and does not leak.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.