Building work price list: Installation and Connection of Electrical Extractor Fan (Bathroom, WC)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Electrical works cost | ||||
| Install and connect extractor fan (bathroom/WC) | pcs | €55.00 / pcs | pcs | enter quantity- |
| Data cabling installation (FTP) | pcs | pcs | - | |
| 230V socket outlet point - first fix | pcs | €6.80 / pcs | pcs | enter quantity- |
| Switch point - first fix | pcs | €8.50 / pcs | pcs | enter quantity- |
| Lighting point - first fix | pcs | €8.40 / pcs | pcs | enter quantity- |
| 230V socket / switch - second fix | pcs | €11.00 / pcs | pcs | enter quantity- |
| Pulling power cable (up to 3x2.5) | lm | €1.50 / lm | lm | enter quantity- |
| Pulling data/comms cable (FTP, coaxial) | lm | €1.20 / lm | lm | enter quantity- |
| Chasing for cable - brick / aerated concrete | lm | €5.80 / lm | lm | enter quantity- |
| Chasing for cable - concrete / panel | lm | €8.50 / lm | lm | enter quantity- |
| Making good walls after electrical installation | lm | €7.50 / lm | lm | enter quantity- |
| Install and connect consumer unit | pcs | €150.00 / pcs | pcs | enter quantity- |
| Connect 1-phase circuit breaker | pcs | €12.00 / pcs | pcs | enter quantity- |
| Connect RCD (Residual Current Device) | pcs | €30.00 / pcs | pcs | enter quantity- |
| Install and connect doorbell | pcs | €55.00 / pcs | pcs | enter quantity- |
| Connect and fit room thermostat | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install LED strip with aluminium profile | lm | €12.00 / lm | lm | enter quantity- |
| Installation of recessed spotlight in plasterboard ceiling | pcs | €50.00 / pcs | pcs | enter quantity- |
| Install pendant light fitting | pcs | pcs | - | |
| Install wall-mounted light fitting | pcs | €14.00 / pcs | pcs | enter quantity- |
| TV / data socket point - first fix | pcs | €12.00 / pcs | pcs | enter quantity- |
| TV / data socket - second fix | pcs | €50.00 / pcs | pcs | enter quantity- |
| Professional connection of 400V hob | pcs | pcs | - | |
| Install external LV connection to flat | pcs | pcs | - | |
What the work includes and when you need a fan
People usually call an electrician about an extractor fan for one of three reasons. The bathroom has no window, the mirror stays steamed up long after a shower, or dark spots appear in a corner of the ceiling. The work covers fitting the fan in a wall, ceiling or shaft and wiring it to a switch, the light, a timer or a humidity sensor. The fan removes moist air before it can settle on the walls.
A fan is usually needed in these situations:
- a bathroom or WC without a window, where moist air escapes only slowly through the natural draught of a shaft, if at all,
- a bathroom with a window that is rarely opened in winter, so moisture from the shower stays in the room for a long time,
- replacing an old, noisy or faulty fan with a new one,
- a bathroom refurbishment, when new wiring, tiling and a suspended ceiling are going in and the fan can be planned from the start,
- mould in corners and on grout lines that keeps coming back after cleaning.
Where there is mould, the fan deals with the cause, which is moisture. It will not remove mould that is already on the wall. That needs to be cleaned off separately, otherwise it will show through again after redecorating.
What to decide before booking the work
Most decisions are made on site together with the electrician. It still helps to know about them in advance and to be clear about what you expect from the fan.
Where the air will go and where the fan will sit
The air can be extracted into a ventilation shaft, into ducting or straight outside through an external wall. The fan should be as close as possible to the source of moisture, which means the shower or bath. It must, however, be out of reach of splashing water and respect the bathroom zones.
The zones are defined by distance from the bath and shower. The closer the fan is to water, the stricter the requirements for its IP rating and power supply. In the zones around the bath and shower, a rating of at least IPX4 is normally required, and IPX5 where water jets can reach it, for example from a shower head. Fans fitted directly above a bath or shower are often SELV models running at 12 V. Their transformer is then placed outside the zones, for example above the ceiling or in an adjoining room. Only models the manufacturer specifically approves for that position should be used there.
Which fan to choose: switch, timer or humidity sensor
The type of fan determines how it is wired and how convenient it is to use.
- A basic switched fan is turned on and off by hand. It suits a WC or utility room where little steam is produced.
- A timer fan usually comes on with the light. After the light is switched off it runs on for a few minutes, roughly 3 to 15 minutes depending on the setting. This is a common and practical choice for a WC.
- A humidistat fan starts automatically when humidity rises above the set level and switches off once the room has dried. For a bathroom without a window this is often the most sensible option.
The fan type should be decided before any cable is run, because each type is wired differently. Once the cable is buried in the wall and the tiling is finished, changing it means chasing out again.
What extraction rate
Fan performance is given in m³/h. A WC usually needs a lower flow rate, while a bathroom with a shower needs more. For a rough estimate, the room volume and the number of air changes per hour are used. For bathrooms, five to eight air changes are often assumed. A bathroom of 2 × 2.5 m with a ceiling height of 2.6 m has a volume of about 13 m³. At six air changes per hour, that gives a flow rate of around 80 m³/h.
The length of the ducting and the number of bends also matter. For a longer run or several bends, a fan with higher pressure is worth choosing. Otherwise it will hum but move very little air. The flow rate on the box applies to the fan without ducting, so the real figure is lower. If the bathroom is next to a bedroom, also check the noise level stated by the manufacturer.
Backdraught shutter and air supply
In a block of flats with a shared shaft, a backdraught shutter is important. It stops air and smells from the shaft coming back into your flat. When the fan vents through an external wall, an outside grille with louvres does a similar job, closing when the fan is off.
A fan only extracts air. The same amount of air has to come into the room from somewhere. That is why a vent in the door or a gap under the door leaf is needed. With new doors, this can be arranged when ordering.
Gas appliance in the bathroom
If the bathroom or flat has a gas water heater or boiler that draws its combustion air from the room, the fan can create negative pressure. Flue gases can then be pulled back into the home instead of going up the flue. Such an arrangement must be assessed before installation by a Gas Safe registered engineer. Never work on gas appliances yourself. If you smell gas, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland).
Flats and external walls
If you live in a flat and want to make a new opening in the external wall or alter a shared shaft, contact the freeholder, managing agent or management company first. Some older shafts are designed only for natural ventilation. For changes to the external wall, check with the local authority what local building regulations require.
How the fan is installed and wired
- Survey: the electrician assesses where the fan should go and where the air will be discharged, checks the shaft or duct route and finds where power can be taken from.
- Circuit check: they check that the bathroom circuit is protected by an RCD and what size the conductors are.
- Isolation and marking out: they switch off the relevant circuit breaker at the consumer unit and mark the position of the fan, back box and cable route.
- Opening: they prepare the opening, usually 100 or 125 mm in diameter depending on the fan and ducting. In an external wall they use a core drill; at a shaft they use the existing opening or adapt it.
- Cable run: in a new build a cable is usually already in place. In a refurbishment it is often necessary to chase a channel and fit a back box. Chases run vertically or horizontally, never diagonally.
- Ducting: if the air does not go straight into a shaft, ducting is added with as few bends as possible. When venting outside, the duct falls slightly towards the outside so that condensation does not run back into the fan.
- Fitting the fan: the fan is fixed in place, ideally with an anti-vibration gasket. The joint with the duct or shaft is sealed, and a backdraught shutter is fitted if the fan does not have one built in.
- Wiring: the conductors are connected according to the fan type and the manufacturer's instructions, either to a switch, to the lighting circuit or to a permanent supply for the sensor.
- Setting up and testing: the run-on time or sensor sensitivity is set and the fan is tested in all modes.
- Making good: the cable chases are filled so the wall can be painted or tiled. For more detail, see making good walls after electrical installation.
If a new light is also being fitted, it makes sense to do both jobs at once, as the light and fan often share the same cable route. This applies for example to recessed lighting installation with hole cutting in a bathroom ceiling.
What affects the price
The guide price for the labour is €55.00 per piece. The price covers installing one fan. The final amount varies mainly with how much work is needed around it.
- Replacement or new installation: the quickest job is swapping an old fan for a new one of the same type where a working supply and opening are already in place. Installing a completely new fan in a finished bathroom takes considerably more work. Cable has to be run, chases cut into tiles or plaster, and sometimes a new opening drilled.
- Fan type: a timer or humidistat fan needs more conductors and setting up. If the existing cable with fewer cores has to be replaced, the price rises more than for the wiring alone.
- Cable supply: a missing supply or a badly placed back box means chasing, a new box and making good. Chasing into tiles is slower and riskier than into plaster.
- Opening and wall: drilling through a thick or insulated external wall takes longer and requires core drilling, a longer piece of duct and an outside grille.
- Height and suspended ceiling: fitting to a high ceiling or into a plasterboard ceiling takes more effort. With a suspended ceiling, an opening has to be cut and the duct run above it.
- 12 V supply: a SELV fan also needs a transformer and a place for it outside the zones, which adds extra wiring.
- Ducting: a longer duct run with bends adds both materials and time.
- Materials: the labour price normally does not include the fan itself, ducting, shutter or new cable. When comparing quotes, it is worth asking exactly what is included.
How to prepare for the installation
- Fan bought in advance and checked with the electrician. If the model does not match the opening diameter or the wiring method, it has to be exchanged and the job is delayed.
- Agreed switching method. Knowing in advance whether the fan should run from a switch, with the light or from a sensor saves later rework.
- Correct sequence in a refurbishment. Cable and back box go into the wall before tiling and the ceiling. If the electrician comes after the tiler, they have to cut into finished tiles. If you are also planning data network cabling with FTP cables, it is practical to run all cables at the same stage.
- Spare tiles. If cutting into tiles cannot be avoided, a few tiles from the same batch allow the damaged area to be repaired without obvious differences.
- Access to the consumer unit and shaft. The electrician needs to switch off the breaker and look into the shaft or access panel. A blocked consumer unit or closed-off shaft will slow the work down.
- Cleared space. Emptied shelves, a washing machine pulled away from the wall and a covered bath speed up the work and keep dust off your belongings.
- Consent from the freeholder or managing agent in good time. For work on the external wall or a shared shaft, consent should be arranged before the installation date, otherwise the work will have to stop.
Why the wiring is a job for an electrician
In electrical terms, the bathroom is one of the highest-risk rooms in the home. Water, steam and metal taps combined with an incorrectly wired appliance can cause injury. Work on the electrical installation therefore belongs to a qualified electrician, even for what looks like a simple fan replacement. In England and Wales, a new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. For an overview of related jobs, see electrical installation work.
The electrician checks that the bathroom circuit is protected by an RCD, usually rated at 30 mA, and that the fan has a suitable IP rating for its position. All new electrical work should be designed, installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations. They also check the conductor size. For standard fans, 1.5 mm² cable is typically used.
The wiring depends on the fan type:
- A basic fan can simply be supplied through a switch, just like a light.
- A timer fan needs a permanent live, a neutral and also a switched live from the light switch. The switched live tells it when the light has come on and when to start the run-on.
- A humidistat fan mainly needs a permanent live and a neutral so the sensor can measure continuously. A switched live is optional, if you also want to start the fan manually or with the light.
The earth conductor must not be missing from the box, even if the fan itself is double insulated and has no earth terminal. In that case, the electrician does not cut the earth off but sleeves and terminates it, for example in a separate connector. It then remains available if the fan is later replaced with a different appliance.
Professional installation also matters for the manufacturer's warranty and in the event of an insurance claim.
Common mistakes and how they show up later
- Fan far from the shower, for example above the door. The steam condenses on the walls first, and mould appears in the corner by the shower even though the fan is running.
- No backdraught shutter on a shared shaft. Smells from neighbours then come into the flat, especially when the fan is off.
- Run-on wired incorrectly. The fan does not switch off after the light goes out, or it does not run on at all and the room stays damp.
- Humidistat fan fed only through the switch. The sensor works only while the light is on and does not finish drying the room afterwards.
- Conductors mixed up or earth missing. The fan does not respond properly and there is a safety risk.
- Inadequate IP rating near water. Water gets into the fan, the RCD trips or the motor fails.
- Underpowered model for a long duct run. The fan runs, but the moisture remains. The mirror steams up just as before.
- No air supply. With a tight-fitting door, the fan runs noisily but extracts very little air.
- Duct falling back towards the room. Condensation runs back into the fan and onto the ceiling. This shows as dripping, stains around the grille and early motor failure.
- Fan without an anti-vibration gasket or pressed hard against the duct. Vibration is transmitted into the wall and the fan can be heard in the next room.
- Badly routed chases, for example diagonally across the wall. Later drilling may hit the cable.
- Fan boxed in so that it cannot be reached for cleaning after tiling or ceiling work. A clogged fan extracts less over time and gets noisy.
How to check the finished work
At handover, ask for the fan to be demonstrated in all modes. Check that:
- the fan is firmly fixed and does not rattle or vibrate,
- the joint with the duct or shaft is sealed,
- a sheet of paper held to the grille is visibly drawn in, even with the door closed,
- it switches on as agreed, by a switch, with the light or by the sensor,
- the run-on time is set and the fan switches itself off afterwards,
- with a humidistat, the sensitivity is set and you know how to adjust it,
- the backdraught shutter moves freely and closes when the fan stops,
- where the fan vents through an external wall, a grille is fitted outside,
- with a 12 V fan, you know where the transformer is and it can be accessed,
- the chases are made good and the area is clean,
- the fan grille can be reached for cleaning,
- you have received the instructions and know which breaker in the consumer unit serves this circuit.
Frequently asked questions
The guide price is €55.00 per piece. The biggest factor is whether it is a replacement on an existing supply or a new installation with cable and an opening. The other factors are described in the price section above. The fan itself and materials are usually charged separately.
Replacing an old fan with a similar model on a working supply usually takes one to two hours. A new installation with chasing, a new back box and core drilling through an external wall can take half a day to a full day. Add time for the filled chases to dry before painting or tiling.
A timer fan comes on with the light and runs on for a while after it is switched off to dry the room. Besides a permanent live and a neutral, it also needs a switched live from the light switch, so a cable with more cores is usually required. The wiring should be done by an electrician.
Not always, but in winter the window is rarely opened and moisture lingers after a shower. If the mirror stays steamed up and mould appears in the corners, a fan will help even in a bathroom with a window.
In a WC, where the main issue is odours, a timer is usually enough. In a bathroom with a shower and no window, a humidity sensor is more practical, because it responds to actual steam and you do not have to remember anything.
Clean dust from the grille and blades from time to time according to the manufacturer's instructions, always with the circuit switched off at the consumer unit. A clogged fan extracts less and is noisier.
Fitting a fan into an existing shaft does not usually need planning permission. In England and Wales, however, electrical work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme or notify building control before you start. For work on the external wall or shared parts of a block of flats, speak to the freeholder or managing agent and check the requirements with the local authority.
Related work
How shielded FTP data cabling is installed in a flat, house or office, which cable category to choose and how to check the finished network.
How to fill cable chases and back box openings after rewiring, which filler to choose, common mistakes and how to check the wall before painting.
How downlights are fitted into plasterboard ceilings: cutting the hole, wiring, choosing the fitting, typical mistakes and how to check the work.
How a pendant light or chandelier is installed, how to fix it safely to different ceilings, how high to hang it and how to check the finished job.
How an electrician fits a wall light, what makes the job harder, what to watch for in bathrooms and outdoors, and how to check the finished work.
How an external low voltage connection to the electricity meter is installed, what the network operator approves, common mistakes and how to check the work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.