Building work price list: Waterproofing Coating (Around Bathtub, Around Washbasin, Under Shower Tray)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Preparation | ||||
| Waterproofing (bathroom) | m² | €7.00 / m² | m² | enter quantity- |
| Primer application before tiling | m² | €1.90 / m² | m² | enter quantity- |
| Installation of waterproofing sealing tape in corners | lm | €8.70 / lm | lm | enter quantity- |
What a waterproofing coating does and when it is needed
Tanking is applied to the plaster, plasterboard or screed before any wall or floor tiles go on. Tiles and grout are not waterproof. Over time, water passes through them into the masonry or the screed. Waterproofing is needed in every new bathroom and in every refurbishment where the old tiles are stripped off.
It cannot be seen once the tiles are on, but it decides whether the bathroom lasts for years without mould, loose tiles or a stained ceiling in the room or flat below. A fault in the waterproofing also cannot be repaired locally. Once water is getting through, the tiles in the whole affected area usually have to come off and the area has to be tanked again.
Waterproofing a shower area
The shower gets the most water, especially a level-access shower or wet room with a linear drain or a point drain. Here the whole shower floor is waterproofed, and the walls at least up to the height the water reaches. In practice this is around 2 m, above the level of the shower head.
In a shower without a screen or with an open side, the waterproofing on both the floor and the walls is extended with a margin, because water splashes further than most people expect. With a shower tray, the walls around the tray are waterproofed to the same height, together with the joint between the tray and the wall.
Waterproofing around the bath and basin
Why waterproof under a bath when the bath holds the water? Water runs down the tiles and through the joint between the bath and the wall into the space under the bath, where nobody sees it. That is why the floor under the bath, the wall behind it and a strip of wall above its rim, usually at least 20 to 30 cm, are waterproofed. If there is a shower over the bath, the wall behind it is treated in the same way as a shower enclosure, up to about 2 m.
Around the basin and the WC there is less water, but at least the strip of wall behind the basin is worth doing. The floor is usually waterproofed across the whole bathroom, with the coating turned up the walls around the perimeter, typically by 10 to 15 cm. Water from a flooded floor then cannot run into the walls or into the next room.
In a block of flats, the waterproofing also protects the flat below. If the refurbishment involves the soil stack or other shared pipework, agree this in advance with the managing agent or the building management.
What needs to be decided before work starts
Waterproofing follows the plumbing and comes before the tiling. Most decisions therefore have to be made before any coating is applied.
- Type of shower: a shower tray, or a level-access shower with a linear drain or a point drain. For a level-access shower it must be clear in advance where the drain will be and how the fall to it will be formed. The fall is formed in the screed or in a pre-formed shower former board, not in the waterproofing.
- Extent of the waterproofing: whether only the shower and the bath area will be done, the whole floor with upstands on the walls, or the walls to full height as well.
- Material: liquid membrane, two-part cementitious slurry or a sheet membrane system, depending on how much water the area will take.
- Position of sanitaryware and fixings: where the shower head, basin, shelves, grab rails and screen brackets will go. This determines how far the waterproofing goes up the walls and where holes will be drilled later.
- Who makes the connection to the drain: this is the most sensitive detail. It is best done by the same tradesperson who then tiles, so that one person is responsible for the whole job.
Which materials are used and when
- Liquid waterproofing membrane (dispersion-based): a ready-mixed product in a tub, applied with a roller or brush. It is easy to work with, so most DIYers and tilers choose it. Certified liquid membranes are also commonly used in level-access showers and wet rooms.
- Two-part cementitious slurry: mixed from a powder and a liquid component and applied in a thicker layer. It is more robust and suits areas with constant or very heavy moisture, such as spa areas, steam showers or places where water stands.
- Sheet membranes and tapes as a system: bonded to the substrate, they have a consistent thickness and need no waiting time between coats. They suit jobs where work has to continue quickly. Even so, they cannot be bonded to a damp substrate without checking. The permitted moisture content is set by the system manufacturer, and plasterboard and anhydrite screed must always be dry.
All of them are used with sealing tapes for corners and wall-to-floor joints, preformed corner pieces, and collars for pipe penetrations and the floor drain. The details of applying waterproofing tapes to corners are covered separately. All materials should come from one system by one manufacturer, including the primer and the tile adhesive. That way they are known to work together. The packaging normally states that the product is tested as a waterproofing layer for use under tiles to the relevant European standard.
How the work is done step by step
- Checking the substrate: the tradesperson checks that the plaster or screed is sound, flat and dry. On screed, the moisture content is measured. Anhydrite screed should generally have no more than 0.5 % moisture measured by the carbide (CM) method, or 0.3 % with underfloor heating, and cement screed around 2 %.
- Preparation: remnants of old adhesive and loose plaster are removed, larger irregularities are levelled and repairs are left to dry. The surface is vacuumed and cleaned of dust and grease.
- Priming: a primer suited to the substrate is applied, one type for plasterboard or aerated concrete blocks and another for concrete or existing tiles. It is left to dry.
- Details: sealing tapes are bedded into the first coat in the corners and along the wall-to-floor joint, with preformed pieces on internal and external corners. Collars are fitted over pipe penetrations and a sealing collar on the drain.
- First coat: the whole area to be waterproofed is coated so that the tapes and collars are fully embedded with no air bubbles left underneath.
- Drying: with liquid membranes there is usually a wait of 2 to 4 hours between coats, longer in cold and damp conditions.
- Second coat: ideally applied at right angles to the first. Together the two coats must reach the thickness specified by the manufacturer, generally at least 0.5 mm dry for liquid membranes and around 2 mm for cementitious slurries. Some products have coats in different colours so it is clear where the second coat has been applied.
- Inspection and testing: the whole area is checked, especially the corners and the areas around the drain and pipes, and thin spots are touched up. For a level-access shower, a flood test after curing is advisable: plug the drain, fill the shower area with a few centimetres of water and leave it for about 24 hours.
- Tiling: once cured, usually after 12 to 24 hours for liquid membranes, the wall and floor tiles are fixed with a flexible adhesive, whether for standard tiling with tiles up to 60 cm or large-format tiles of 60×120 cm. Finally, the joints between the bath, the shower tray and the wall and in the corners are filled with flexible sanitary silicone.
With sheet membrane systems, the sheets are bonded to the substrate with adhesive instead of being painted on, joints are overlapped or taped, and there is no waiting between coats.
What affects the price
The guide price for labour in the price list is €7.00 per m². It applies to a normal prepared substrate and a simple room. The final cost depends mainly on the following:
- Condition of the substrate: flat, sound and dry plaster or screed only needs priming. Uneven surfaces, remnants of old adhesive or crumbling plaster mean extra work. With a poor substrate, the preparation can take as long as the coating itself.
- Type of substrate: plasterboard, aerated concrete blocks or anhydrite screed need a suitable primer, and anhydrite also needs a moisture test. Coating over existing tiles requires a special primer and a check that the tiles are firmly bonded.
- Complexity of the room: every corner, recess, boxed-in pipework or stud partition and pipe penetration means another detail with a tape or collar. A small bathroom with many corners and pipes costs noticeably more per m² than a large flat area.
- Type of shower: a shower with a tray is simpler. A level-access shower with a linear drain needs an accurate connection to the drain, a carefully formed fall and ideally a flood test, which adds considerably to the cost.
- Area to be waterproofed: waterproofing only around the shower and bath is less work than the whole floor and walls to full height. For very small areas, tradespeople often charge a minimum call-out fee, so the price per m² goes up.
- Material: two-part slurries and sheet membrane systems are more expensive and more labour-intensive than a standard liquid membrane.
When comparing quotes, it is worth asking whether primer, tapes, collars and corner pieces are included or charged separately, and how the area of the upstands on the walls is measured.
What makes the work easier and what slows it down
- Finished and tested pipework: water supply and waste pipes in the bathroom should be complete and pressure-tested before waterproofing. Any later work on the pipes means breaking through the finished waterproofing.
- Drain fitted and fall formed: if the tradesperson arrives and the drain is not yet in place, only the walls can be done and a second visit is needed.
- Empty bathroom: the bath, basin, WC and old tiles should be removed and the waste cleared.
- Temperature and ventilation: the room should be warm, depending on the product generally at least around 5 °C, ideally normal room temperature, with the option of light ventilation. In a cold, unheated bathroom the coats can take twice as long to dry.
- Bathroom out of use: nobody should enter the room or lean anything against the waterproofing while it dries. If it is the only bathroom in the home, plan an alternative for a few days in advance.
- Materials on site: if the materials are bought by the client, there should be enough of them, including tapes and collars in the right sizes for the pipes and drain.
Typical mistakes and how they show up later
No tapes in the corners. A corner is where the substrate moves, and the coating alone cracks there. A crack under the tiles cannot be seen. Water gets through it into the wall-to-floor joint, and after a while a damp patch appears on the wall of the next room.
A single thin coat. Manufacturers generally specify two coats and a minimum thickness that one coat does not reach. The waterproofing then has pinholes and thin spots through which water slowly seeps.
Primer left out. The coating bonds poorly and can peel off together with the tiles. This shows up as hollow tiles that sound different from the surrounding ones when tapped.
Waterproofing on the floor only. Shower water runs down the walls and, without upstands, gets into the masonry. A typical sign is mould in the grout that keeps coming back after cleaning.
Poor connection to the drain. In a level-access shower this is a common cause of leaks. Water runs under the collar into the screed and often first appears on the ceiling below. A flood test before tiling reveals such a fault while it is still easy to fix.
Tiling onto wet waterproofing. The coating has not had time to cure and the adhesive can damage it. The waterproofing loses its continuity and the tiles may come loose later.
Drilling through the waterproofing afterwards. A hole for a shower riser bracket, a shelf or a screen in the wet zone breaks the layer. It is best to plan fixing positions before waterproofing. If drilling into finished tiles is unavoidable, the hole should be sealed with a sealant or sealing component designed for this purpose from the same system, not with any silicone that happens to be to hand.
How to check finished waterproofing at handover
Inspect the finished waterproofing before the tiles cover it. Later, faults are hard to find. Go through this list:
- the layer is continuous and evenly coloured, with no see-through areas,
- sealing tapes are bedded in the corners and along the wall-to-floor joint,
- tapes and collars are fully embedded in the coating and their edges are not lifting,
- pipe penetrations have collars and the drain is connected with a sealing collar,
- in the shower, the waterproofing reaches about 2 m up the walls, above the shower head,
- the floor is also waterproofed under the bath and the coating is turned up the walls around the perimeter,
- the coating has no bubbles, cracks or peeling areas,
- for a level-access shower, a flood test has been carried out and neither the floor beneath nor the ceiling below has become damp,
- the tiler knows which system was used and fixes the tiles with the adhesive the manufacturer recommends for it.
It is worth photographing the finished waterproofing from all sides, especially around the drain and pipe penetrations. If problems arise later or the property is sold, this is the only record of what is under the tiles.
DIY guide: waterproofing with a liquid membrane
A competent DIYer can apply a liquid membrane. The method is the same as in the step-by-step list above; what matters is patience and keeping to the drying times. If in doubt about the connection to a linear drain, leave that detail to a tiler, and for the wider context see the overview of tiling services. Work on the soil stack or shared pipework in a block of flats is not a DIY job.
- Have a short-pile roller ready for the flat areas and a brush for corners and around pipes.
- Cut the tapes and collars to size and dry-fit them before coating, so they can be bedded into the wet coating without delay.
- Find the coverage in kg per m² for the specified thickness on the packaging and use it to work out how much material the area should take. If a lot is left over, the layer is probably too thin.
- Work from the corner furthest from the door towards the door, so there is no need to step into wet coating.
- Before tiling, inspect the whole area with a torch held at a low angle, which makes thin and see-through spots easier to see.
Frequently asked questions
The guide price for labour in the price list is €7.00 per m². Expect to pay more for a poor substrate, a complex bathroom with many pipes and corners, a level-access shower with a linear drain, and a small area where the work cannot be spread out.
For both liquid membranes and slurries, two coats are generally applied, the second at right angles to the first. A single coat does not reach the thickness specified by the manufacturer and easily leaves thin spots.
With liquid membranes there is usually a wait of 2 to 4 hours between coats, and tiling can normally begin 12 to 24 hours after the last coat. In cold and damp conditions it takes longer; the exact times are given in the product's technical data sheet.
Some systems allow this on sound, degreased tiles with a special primer. Always check that the tiles are firmly bonded, otherwise they may come away together with the new layer.
Yes, at least on the walls around the tray and at the joint between the tray and the wall. Water runs down the tiles, gets through the grout and, via the joint at the edge of the tray, into the wall and under the tray.
Warning signs are damp patches on the walls behind the bathroom, mould in the grout that keeps coming back, and hollow or loose tiles. Only removing the tiles during a refurbishment gives certainty.
No. Grout lets water through, and silicone loses its flexibility over time and comes unstuck. Both only protect the surface; watertightness under the tiles is provided only by a continuous waterproofing layer.
Related work
How to apply waterproofing tapes to bathroom and shower corners, which tapes and corner pieces to use, and what to check before tiling.
How much does tiling cost per m² in 2026? Find current labour prices for wall and floor tiling, tanking, grouting, mitred edges, and bathroom estimates.
How wall and floor tiles up to 60 cm are laid, what the substrate needs, which adhesive to choose, common mistakes and how to check the work.
How 60×120 wall and floor tiles are laid: preparing the substrate, adhesive, levelling clips, cutting, typical mistakes and checking the finished work.
How 120 x 260 cm tiles and slabs are laid, what the wall or floor underneath must be like, which tools are used and what to check at handover.
Mosaic tiling in bathrooms, showers and kitchens. How it is laid, which adhesive and grout to choose, what makes it harder and how to check the result.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.