Building work price list: Fitting Timber Door Frames & Hanging Doors
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Doors and frames cost | ||||
| Install door lining & hang door | pcs | €75.00 / pcs | pcs | enter quantity- |
| Install interior doors | pcs | €65.00 / pcs | pcs | enter quantity- |
| Install sliding door pocket frame (Eclisse) | pcs | pcs | - | |
| Install sliding door into pocket frame | pcs | pcs | - | |
What a timber door lining is and when it is needed
A timber door lining, often sold as a door frame set, is a frame made of solid timber or engineered board. It wraps the full thickness of the wall, and its architraves cover the edge of the opening on both sides. It is fitted into a finished structural opening. The door is then hung on its hinges and adjusted so that it closes easily and quietly. It is one of the standard tasks in carpentry work, usually done as second fix.
In a new build, this work comes after plastering and flooring. It is also common in refurbishments, where an old steel frame is replaced with a new timber lining. A steel frame is built into the wall during the structural stage. A timber lining, by contrast, goes in at the very end, once walls and floors are finished, so it is less likely to be damaged by other trades.
The architraves hide the edge of the opening on both sides, so uneven plaster edges or the foam-filled gap are not visible. Most lining sets of this type have architraves that adjust to a certain range of wall thicknesses. The manufacturer states the exact range for each model.
What to decide before ordering
The lining and the door are ordered to suit a specific opening. Most decisions need to be made before the fitter arrives, because they cannot be changed later without a new order.
- Door width: internal doors come in standard widths. In the UK the common imperial sizes are 610, 686, 762 and 838 mm, and metric sizes are also available. Bathrooms and WCs often get narrower doors, living rooms and hallways wider ones. If someone in the household uses a wheelchair or a walking frame, wider doors are worth considering.
- Opening direction (handing): doors are left-handed or right-handed according to the hinge side. Think about where the door will swing, whether it will hit a light switch, radiator, wardrobe or another door, and whether the handle will strike the wall.
- Wall thickness: measure it on the finished wall including plaster or tiles, not from the drawings. The architrave range is chosen to match.
- Finished floor level: the lining stands on the finished floor, not on the screed. The floor height therefore sets the height of the lining and the gap under the door. If the floor is not laid yet, its exact thickness including underlay or adhesive must be known.
- Door type: solid, glazed, with a ventilation grille or undercut for airflow. Bathrooms and WCs often need an air path under the door or through a grille.
- Hinge type: cheaper pre-hung sets often have simple screw-in pin hinges with limited adjustment. Concealed hinges look cleaner and can be fine-tuned better, but fitting is more demanding.
- Lock and ironmongery: a simple latch, a bathroom lock with a thumbturn and engaged indicator, or a euro cylinder lock. Lever handles are sometimes bought separately, so agree who will supply them.
- Threshold: without a threshold the transition is flush. A threshold strip can seal the bottom of the door better or cover the joint between two different floor finishes.
- Who supplies the materials: whether the client buys the linings and doors or the fitter sources them. This also decides who is responsible for ordering the correct size.
If an opening needs to be widened or newly formed in a load-bearing wall, this is no longer carpentry but a structural alteration. It requires an assessment by a structural engineer, and building control should be consulted in advance about what approval the work needs. In Scotland, structural alterations such as building or removing load-bearing walls need a building warrant from the council before work starts. In a block of flats, such work must also be discussed beforehand with the freeholder or managing agent.
How the installation works step by step
A good result is decided at the measuring stage. The width and height of the opening are measured in at least three places, and the wall thickness at the top and the bottom.
- Checking the opening: the opening is cleaned of dust, and the edges are checked for soundness, the walls for plumb and the floor for level.
- Checking the delivery: the fitter unpacks the lining and door and checks that the size and handing are correct and that no parts are damaged. The lining should be left to acclimatise in the room for a few days before fitting.
- Assembling the frame: the lining is assembled on a soft surface, such as a dust sheet or cardboard, following the manufacturer's instructions. The joints must be square and tight.
- Setting and levelling: the frame is placed in the opening and secured with wedges or packers at the hinges, at the lock and in the corners, because the hinges and lock carry the most load. Both jambs are set plumb and the head level with a spirit level, and the diagonals are checked as well.
- Fixing: with a heavier door or a weaker wall, the frame is fixed with screws or frame fixings into the wall in addition to foam, where the lining manufacturer allows it.
- Spreaders: spreaders are placed inside the frame, usually three along the height and one under the head, so the frame does not close in during foaming.
- Foaming: the face of the lining is masked with tape and the gap between lining and wall is filled with foam in sections, sparingly, to only about a third of its depth. The foam is there to hold and seal the frame, not to align it. The position is therefore set mechanically before foaming.
- Curing: the frame is left undisturbed until the foam has set according to the manufacturer's data.
- Finishing the frame: wedges and spreaders are removed, excess foam is trimmed and the second architrave or cover strips are fitted.
- Hanging the door: the door is hung on its hinges and the gap around it is adjusted.
- Ironmongery and testing: the handle and lock are fitted, the door is tested and the hinges are fine-tuned.
Hanging the door and adjusting the hinges
Once the frame is secure, the door is hung. The adjustment options depend on the hinge type. With the simple screw-in hinges of cheaper sets, the door can only be adjusted to a limited extent, mostly a little in height and sideways. Concealed hinges offer more, often in all three directions including depth. The door is adjusted gradually, in small steps, and the gap around it is checked after each change. According to manufacturers this gap is usually around 2 to 4 mm and should be even all the way round.
Then the following is checked:
- the door opens and closes smoothly, without rubbing,
- the latch engages precisely in the strike plate,
- the handle and ironmongery are firmly fixed,
- the door does not catch on the floor or the frame anywhere,
- the seal makes contact all the way round.
Why does a door sometimes swing open or closed by itself? It is almost always a sign that the frame is not plumb. The hinges can correct this slightly, but only a properly aligned lining removes the real fault.
What affects the price
The guide price for labour is €75.00 per piece. It assumes a standard prepared opening, a standard door and a finished floor. The final amount depends mainly on the following:
- Removing an old steel frame: breaking it out of the masonry, repairing damaged edges of the opening and taking the waste away are additional work. Before the rubble is handed over, check that the carrier is registered with the Environment Agency and ask for a waste transfer note. In refurbishments this is one of the items that raises the price most.
- Condition of the masonry: uneven or crumbling masonry in older houses needs repairing before fitting. The more making good, the longer the job takes.
- Wall thickness outside the architrave range: if the wall is thicker or thinner than the lining allows, extra lining or adjustments are needed. This lengthens the job and sometimes requires a different type of lining.
- Floor: an uneven floor, or one that will only be replaced later, means more precise measuring, packing and sometimes trimming the door.
- Stud partition: an opening in a plasterboard wall without metal or timber reinforcement is not rigid enough. Adding reinforcement is a separate job.
- Door type: a heavy door, concealed hinges, glazing, sliding systems or non-standard sizes need more time and experience. A pocket door installation is priced as a separate job. With concealed hinges and flush doors without rebates, fitting is considerably more demanding than with standard doors.
- Number of doors: with several doors in one property the work flows better, because the fitter sets several frames at once and works on others while the foam cures. The same applies when one carpenter also handles other joinery on site, such as kitchen unit installation or invisible mitred joints on worktops.
- Additional work: fitting a threshold, fitting handles supplied separately, trimming the door or making good the plaster around the opening are usually separate items on the price list.
What makes the job easier and what slows it down
The simplest situation is a new build with straight walls, a finished floor and an opening that matches the lining exactly. The installation is then quick and needs no adjustments. Much can be prepared in advance:
- decorating is finished, or only the final coat remains, so the new lining does not get paint on it,
- floors are laid and the skirting boards near the doors are not yet fixed, or it is clear how they will meet the architrave,
- linings and doors are on site in good time, unpacked for checking and stored flat in a dry room,
- for each opening it is clear which door goes where and which way it opens,
- handles, locks and any thresholds are bought and ready,
- the area around the openings is clear, furniture is moved and the fitter has a socket for power tools,
- the property is at a stable room temperature and no other dusty or wet work is going on.
The job is slowed down when a wrong size or handing only becomes apparent on site. The replacement then has to be awaited and the fitter has to come back.
Typical mistakes and how they show up later
Most problems with internal doors are not caused by faulty products but arise during installation. Typical ones are:
Inaccurate measuring. The opening is too wide or too narrow. The gap is then filled with too much foam and the frame twists.
Setting the lining on the screed. After tiles or floating floor are laid, the door drags on the floor and has to be trimmed.
Too much foam. As it expands, the foam presses on the frame and bows it into the opening. The door then sticks halfway up. That is why low-expansion foam and spreaders are used.
Loading too early. The door is hung and used before the foam has cured. The frame shifts and the door drops over time.
Fitting in a damp building. Timber and board absorb moisture from fresh plaster and screed and later distort. Architraves can come away from the wall and the surface foil can lift. Linings should only be fitted once wet trades are finished, the indoor temperature is stable and relative humidity is roughly between 40 and 60 percent.
Frame aligned with foam instead of wedges. While the foam is soft everything looks fine. Once it cures, the frame moves and the door swings closed or open by itself.
No mechanical fixing for a heavy door. If only foam holds the frame, a heavier door will gradually pull it out at the hinges. The door drops and the latch stops meeting the strike plate.
Wrong handing. The door covers a light switch, hits another frame or the handle bangs into the wall. The fix means a new lining and door.
Foam on the face of the lining. Dried foam is hard to remove from foil or lacquer, and scraping damages the surface. Masking with tape before foaming prevents this.
DIY guide: fitting a timber door lining
A capable DIYer can fit a timber door lining with an accurate spirit level, a foam gun and patience. A helper to hold the frame makes the job much easier. Removing old steel frames or any alteration to a load-bearing wall is better left to a professional. The procedure is the same as the professional installation described above. In addition, the following points need attention:
- Prepare the tools in advance: an accurate spirit level, tape measure, wedges, spreaders, low-expansion gun foam, masking tape, a foam knife and a drill.
- When working with polyurethane foam, wear gloves and safety glasses and ventilate the room. Fresh foam is hard to wash off hands and clothing.
- Before foaming, test on a piece of cardboard how much the particular foam expands.
- Allow for the foam continuing to expand for several minutes after application. Apply less than seems necessary and do not top it up until it has expanded.
- With a heavier door or a weaker wall, such as aerated concrete blocks or plasterboard, fix the frame with screws or frame fixings in addition to foam, following the lining manufacturer's instructions.
- After each step, check again with the spirit level that the jambs are plumb and the head is level, especially after inserting the spreaders and after foaming.
- Hang the door only once the foam has fully cured, and adjust the hinges in small steps.
How to check the finished work
At handover it is worth spending a few minutes checking while the tradesperson is still on site:
- the jambs are plumb and the head is level, checked with a spirit level,
- the gap between door and lining is even all the way round,
- the door stays in any position and does not move by itself,
- the door does not rub on the floor or the frame anywhere,
- the gap under the door matches what was agreed, for example for bathroom ventilation,
- the latch engages in the strike plate without pushing,
- the lock can be locked and unlocked without lifting the door,
- the seal makes contact all the way round,
- architraves and cover strips sit tight to the wall with no visible foam,
- the handing and lock type match the order,
- the surface of the lining, the plaster and the floor are undamaged.
Frequently asked questions
The guide price is €75.00 per piece. The price rises mainly with removal of an old steel frame, repairs to the opening, an unsuitable wall thickness, an unreinforced plasterboard partition or heavy and non-standard doors.
With a prepared opening, usually a few hours per door. Most of the time goes on alignment and waiting for the foam to cure. With several doors in one property the work flows better, but the curing times remain.
Yes, this is common. First check that the plaster is sound, the edges of the opening are firm and there are no voids or cracks in the wall. In homes built before 2000, have suspect materials tested before drilling or breaking out. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. After an old steel frame is removed, the opening often needs repairing before the new lining goes in.
It can, but only if the thickness of the future floor is known exactly. It is safer to wait for the finished floor, otherwise the door may drag or be left with too large a gap underneath.
Yes. A filled gap around the frame and a door that meets the seal all the way round let less sound through. The result also depends heavily on the door itself, as a lightweight hollow-core door will not block sound as well as a solid one.
Usually yes, but only within the range the hinges allow. Simple screw-in hinges permit a small correction in height and sideways position, concealed hinges more. If the cause is a frame set out of plumb, the hinges alone will not solve it and the lining needs correcting.
Stand on the side towards which the door opens. If the hinges are on the left, it is a left-hand door, if on the right, a right-hand door. Before ordering, check how the particular manufacturer labels handing, and agree the direction in writing for each opening.
Related work
How a pocket door frame is set into a masonry or plasterboard wall, how the leaf is hung, which mistakes to avoid and what to check.
Price list for carpentry and joinery in 2026: fitting doors, windows, built-in wardrobes and boarding. What affects the price and a quick estimate in NUMIQ.
How kitchen units are installed without appliances, how to prepare the room, which mistakes to avoid and how to check the finished kitchen.
How an invisible routed worktop joint is made, which worktops suit it, what makes the job harder and how to check the finished joint.
How ovens, hobs, dishwashers, fridges and cooker hoods are fitted into kitchen units, what to watch out for and how to check the finished work.
How an extractor hood duct is routed and connected, which ducting to choose, what to check in a flat and how to inspect the finished work.