Building work price list: Oven and Extractor Hood Installation and Connection
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Kitchens cost | ||||
| Install and connect extractor hood ducting | pcs | €55.00 / pcs | pcs | enter quantity- |
| Install kitchen units | lm | lm | - | |
| Invisible routed worktop joint | pcs | pcs | - | |
| Fit kitchen appliances into units | pcs | €55.00 / pcs | pcs | enter quantity- |
| Adjust and cut worktop | lm | €19.00 / lm | lm | enter quantity- |
What connecting an extractor hood duct involves and when it is needed
An extractor hood removes steam, grease and cooking smells only if the air has somewhere to go. The duct should draw well, run quietly and sit hidden within the kitchen units. This work is needed for a new kitchen, when replacing a cooker hood, or when converting an old recirculating hood to an extracting (ducted) one.
Attaching the duct to the hood takes only a few minutes. Most of the work is planning the route and making the ducting fit the units properly. The job usually includes:
- measuring the route from the hood spigot to the outlet,
- cutting holes in the base, shelf or top of the wall cabinet,
- fitting the non-return valve and connecting the duct to the hood,
- running the ducting through or above the cabinets and fixing it in place,
- connecting to the wall outlet and sealing every joint,
- boxing in the ducting with a cover strip or panel if it runs on show,
- testing airflow and noise at every speed setting.
Core drilling through the external wall and the electrical connection of the hood are separate jobs. If there is no socket above the units and a new supply is needed, a new circuit is notifiable under Part P in England and Wales, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts.
What to decide before the fitter arrives
Most problems with extractor hoods come from decisions made before installation. Once the wall cabinets are hung and the wall outlet is in the wrong place, putting it right is a lot of work. Settle these questions in advance.
- Extraction or recirculation: a ducted hood takes steam and moisture outside and extracts more effectively. A recirculating hood only filters the air and returns it to the kitchen.
- Where the air will go: to an outlet in the external wall, through the roof or into a ventilation shaft. Each option has its own rules, covered in the next section.
- The route of the ducting: the shorter and straighter, the better. The hood is best placed as close as possible to an external wall or an approved vent.
- Whether the ducting will be visible: whether it runs through the cabinets, above them, in a suspended ceiling, or behind a panel. This decides whether round or flat ducting is used.
- Hood spigot diameter: the ducting and the outlet should match the spigot. The size and recommendations are in the hood's instructions.
- Gas appliances in the home: if there is a boiler or water heater with an open flue, the air supply must be sorted out before installation. HSE strongly advises a safety check and service by a Gas Safe engineer every 12 months, and for landlords the annual check is a legal requirement.
Where the air may go: flats, houses and gas appliances
In a block of flats, the hood outlet is not purely the occupant's decision. Shared ventilation shafts are usually designed for slow natural ventilation. A powerful hood connected to such a shaft can push cooking smells into neighbouring flats. Before installation, ask the managing agent, freeholder or residents' management company whether a connection to the shaft is allowed. Cutting through the outside wall affects the common parts of the building and is not done without their consent.
In both houses and flats, it is sensible to check the Planning Portal or ask the local authority in advance whether a new opening through the external wall or a change to the elevation needs approval. Permitted development rights only apply to houses, so in a flat or maisonette an external alteration is likely to need planning permission, and listed buildings and conservation areas have stricter rules. The local authority will advise on what is required in the specific case.
Take particular care with gas appliances that have an open flue, such as an older gas boiler or water heater. A ducted hood creates negative pressure in the room and can pull flue gases back into the home. The hood duct must never be connected to a chimney or flue serving a boiler or stove. The usual solution is an air supply, such as a wall vent or a window contact switch that allows the hood to run only when a window is open. This should be assessed by a Gas Safe registered engineer. If gas is ever smelt, turn off the supply at the meter, open windows, do not operate electrical switches and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.
Negative pressure is also a risk in modern, airtight homes with new windows. If the hood has nowhere to draw air from, it extracts less and is noisier. Even without a gas appliance, it pays to open a window slightly while cooking or to have an air supply in the kitchen.
Which diameter and type of ducting to choose
Diameter and route length
Standard hoods have a 150 mm spigot, smaller models 125 mm or 120 mm. The ducting should have the same diameter as the spigot, never smaller. Reducing from 150 to 125 mm, for example, noticeably cuts airflow and increases noise.
Route length and the number of bends matter because every bend and every metre of ducting resists the airflow. The hood then runs flat out and noisily but extracts poorly. Manufacturers usually recommend a route of roughly 4 to 5 metres at most and no more than two or three bends. The exact figures for each model are given in the instructions.
Rigid round ducting
Smooth rigid plastic round ducting offers the least resistance and is the quietest. It suits any situation where there is enough space above or inside the cabinets.
Flat ducting
Flat rectangular ducting can be hidden tight above the wall cabinets or behind a cover panel. An adaptor is used to change from the round spigot to the flat channel. The cross-section of the flat ducting must not be smaller than that of the spigot. For a 150 mm diameter, ducting of about 220 × 90 mm is used. Any narrowing of the route shows up as weaker airflow and more noise.
Flexible aluminium hose
Ribbed aluminium flexible ducting is cheap and quick to fit, so it is common in practice. However, the internal ribs slow the air and create a rushing noise. It is best kept for short connections of a few tens of centimetres, not the whole route.
Recirculation without ducting
If an outlet cannot be made at all, the remaining option is recirculation with a carbon filter. No ducting is fitted and the hood returns filtered air to the kitchen. Steam and moisture are only partly removed, and the filters need regular replacement according to the manufacturer.
How the ducting is fitted, step by step
- Checking conditions: the fitter confirms that the hood is hung, the wall outlet is ready and the spigot and outlet diameters match the ducting. The hood is unplugged before work starts.
- Planning the route: the shortest and straightest path from the hood spigot to the outlet is found. The route through or above the cabinets is marked, with as few bends as possible.
- Non-return valve: a valve is fitted to the hood spigot. It opens when the hood runs and closes when it stops, so cold air and smells do not come in from outside.
- Holes in the cabinets: holes slightly larger than the duct are cut. The cut edges of the chipboard should be sealed or taped so they do not absorb moisture.
- Running the ducting: wide sweeping bends are preferred to tight elbows. With an external outlet, the ducting is laid with a slight fall towards the outside so any condensation drains outside rather than back into the hood.
- Joints: the sections are pushed together, secured and taped with aluminium tape so no air escapes.
- Fixing: the ducting is held with clips so it does not vibrate against the cabinets or touch the doors or shelves.
- Connecting to the outlet: the duct is pushed into the wall outlet and the joint is sealed. The external grille or louvre is checked.
- Boxing in: visible parts of the ducting are covered with a cover strip or panel as agreed.
- Testing: the hood is plugged in and tested at every speed. Airflow, noise and valve operation are checked.
What the price depends on
The guide price for the labour is €55.00 per piece. One piece means connecting one extractor hood. The actual price differs from the guide figure depending on how complex the route is and what the fitter does beyond the connection itself.
- Route length and shape: the cheapest case is an outlet directly behind the hood with one or two bends. A long route through several cabinets or under the ceiling adds considerably to the work.
- Holes in assembled units: cutting holes in cabinets that are already hung, without damaging doors and shelves, is slower and needs more care than cutting before installation.
- Limited space: if there is no room above the cabinets for round ducting, flat ducting and adaptors are needed. There are more parts and every joint must be sealed.
- Boxing in: a cover panel, strip or suspended ceiling is extra work, often comparable to the connection itself.
- Island hood: the ducting runs through the ceiling, often above a suspended ceiling, and the work is done at height. This is one of the most labour-intensive cases.
- Cold spaces: if the ducting passes through an unheated loft, it must be insulated against condensation.
- Materials: whether the fitter supplies the ducting, valve and adaptors or the customer provides them. Smooth rigid ducting usually costs more than flexible hose but performs better.
- Related work: core drilling through the wall, fitting the external grille and the electrical connection are charged separately. When comparing quotes, check exactly what the price includes.
What makes the job easier and what slows it down
With a new kitchen, it is best to plan the duct route before the wall cabinets go up. The fitter can then cut the holes precisely with no later adjustments. If the whole kitchen is being fitted at once, agree the sequence with the kitchen unit installation team so that the ducting goes in before the cover panels are fixed. This is part of the wider carpentry work on a kitchen, and the hood itself is often hung together with the integrated appliance installation.
The work goes faster when the following are ready:
- the hood hung and a working socket above the units,
- the wall outlet finished, ideally with the external grille fitted,
- consent from the managing agent or freeholder and, where needed, the local authority's view,
- the hood's instructions with the non-return valve and the spigot diameter,
- empty wall cabinets and a clear worktop under the hood, with any invisible mitred worktop joints already completed,
- a clear decision on whether the ducting is to be boxed in and with what.
The work is delayed when it turns out on site that the outlet has a different diameter from the spigot, the valve is missing, the cabinets are full of crockery or it is still unclear whether connecting to the shaft is allowed. The fitter then has to buy extra parts or come back another day.
Common mistakes and how they show up later
Ribbed hose along the whole route. The hood roars and hisses but extracts poorly. Steam stays in the kitchen and grease settles on the cabinets.
Too many tight elbows. Every sharp bend slows the air. The result is the same as with hose: more noise, less extraction.
Reduced cross-section. Flat ducting or an adaptor smaller than the hood spigot. It whistles and airflow drops, even with a powerful hood.
Missing or badly fitted non-return valve. In winter cold air blows into the kitchen, and in windy weather outside smells too. A badly fitted valve rattles or does not open fully.
Fall towards the hood. Condensation runs back into the hood. It shows as dripping, stains on the cabinet or rust on the hood.
Untaped joints. Greasy air escapes into the cabinet. Over time a greasy film and smell build up inside.
Ducting without clips. The duct vibrates against the cabinet base and rattles, especially at higher speeds.
Unsealed hole edges. The chipboard around the cut absorbs moisture from steam, swells and crumbles.
Connecting to a chimney or shaft without consent. At worst the hood pulls flue gases into the home; at best smells reach the neighbours and the connection has to be redone.
DIY guide: connecting the ducting to an existing outlet
If there is already a finished, approved outlet in the wall and the hood is hung and plugged in, a short connection can be done as a DIY job. Do not core drill through the external wall and do not alter the electrical installation. If there is a gas appliance with an open flue in the home, have the air supply assessed first by a Gas Safe registered engineer. The procedure is the same as for the fitter above; for DIY the key points are:
- Unplug the hood from the socket.
- Measure the diameter of the hood spigot and the outlet, and buy the ducting, valve and tape together, with the same cross-section as the spigot.
- Before cutting, mark the hole in the cabinet and check the duct will pass through without a sharp bend.
- Cut the ducting to length so it is neither stretched nor unnecessarily sagging.
- Tape all joints with aluminium tape and fix the ducting with clips.
- Plug in the hood, test every speed and go through the checklist below.
How to check the finished work
Before closing the cabinets and putting crockery back, go through these points with the fitter:
- at the highest speed the hood draws clearly and a paper tissue held under it is pulled against it,
- the noise is even, with no whistling, rattling or valve banging,
- the non-return valve closes when switched off and there is no draught from outside,
- all joints are taped and no air escapes from the ducting,
- the ducting has the same cross-section as the hood spigot along its full length,
- the duct is fixed and does not touch the doors or shelves,
- with an external outlet, the ducting has a slight fall towards the outside,
- the holes in the cabinets have clean, sealed edges,
- the cover panel or strip, if agreed, fits well and can be removed if needed,
- the external grille is fitted and sealed and the louvres move freely,
- consent from the managing agent or the local authority's view is in place, if it was needed.
Frequently asked questions
Roughly €55.00 per piece. The price rises with a long route through several cabinets, cutting holes in assembled units, flat ducting with adaptors, boxing in and island hoods. Core drilling through the wall and the electrical connection are charged separately.
The same as the hood spigot. Most often this is 150 mm, and 125 mm or 120 mm for smaller models. Neither the ducting nor any adaptors should reduce the cross-section.
A short connection to a ready outlet with one or two bends usually takes about one to two hours. A long route through several cabinets, boxing in, or an island hood with ducting in a suspended ceiling can take half a day to a full day.
Only with the consent of the managing agent, freeholder or residents' management company. Shared shafts are often not built for powerful extraction and smells could spread to neighbouring flats.
The most common causes are a route that is too long, too many tight bends, a reduced cross-section or ribbed hose along the whole length. Shortening the route and using smooth ducting helps. A lack of air supply in an airtight home can also be the cause.
Most hoods come with one and it is worth fitting. Without it, cold air comes into the kitchen in winter and outside smells in windy weather.
Usually yes, if the model allows it and an outlet can be made and approved. The carbon filter is removed, a non-return valve is fitted to the spigot and the duct is connected to the outlet. If there is a gas boiler in the home, the air supply should first be assessed by a Gas Safe registered engineer.
Related work
How kitchen units are installed without appliances, how to prepare the room, which mistakes to avoid and how to check the finished kitchen.
How an invisible routed worktop joint is made, which worktops suit it, what makes the job harder and how to check the finished joint.
How ovens, hobs, dishwashers, fridges and cooker hoods are fitted into kitchen units, what to watch out for and how to check the finished work.
Price list for carpentry and joinery in 2026: fitting doors, windows, built-in wardrobes and boarding. What affects the price and a quick estimate in NUMIQ.
How a wraparound timber door frame is fitted and the door hung, what makes the job harder, and how to check that the door sits right and closes well.
How timber stair treads are fitted to concrete stairs, steel spine stringers or timber strings, what to prepare beforehand and how to check the result.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.