Price list 2026 · Europe

Integrated Appliance Installation in Kitchen Units

Integrated appliance installation means fitting the oven, hob, dishwasher or fridge into the kitchen units, fixing, connecting and testing it. A guide price is €55.00 per piece, depending mainly on the appliance type and how ready the units are.

Updated 09/2026·13 min read·5 price list items
Standard labour price
€55.00/ pcs
Indicative range
€44.00 - €71.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Integrated Appliance Installation in Kitchen Units

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Carpentry and joinery5 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Kitchens cost

Fit kitchen appliances into unitspcs€55.00 / pcspcsenter quantity-
Install kitchen unitslmlm-
Invisible routed worktop jointpcspcs-
Install and connect extractor hood ductingpcs€55.00 / pcspcsenter quantity-
Adjust and cut worktoplm€19.00 / lmlmenter quantity-
Total labour
- enter quantity
Create quote from price list →

What integrated appliance installation includes

The work covers built-in ovens, hobs, dishwashers, fridges, extractor hoods and microwaves. It is needed when a new kitchen is fitted, and also when a worn-out appliance in an older kitchen is replaced with a new built-in model. In the wider carpentry and joinery trades, it is usually the kitchen fitter who does it.

Sliding the appliance into the housing is not enough. The fitter checks the opening against the manufacturer's installation instructions, levels the appliance, fixes it to the cabinet sides and, on integrated models, hangs and adjusts the furniture door. The appliance is then connected to the electrics and, where needed, to water, waste or ducting, and tested.

Protecting the units is an important part of the job. Kitchen carcasses and worktops are usually chipboard, and its unsealed edges cope badly with moisture and heat. Cut-outs in the worktop are therefore sealed, and a steam protection strip is fitted above the dishwasher.

The price is per piece, meaning per appliance installed. When budgeting, count how many appliances need fitting. An oven, hob, dishwasher, fridge and extractor hood count as five pieces, even if they are all done on the same day.

New kitchen or existing kitchen: what to decide in advance

The simplest approach is to fit the appliances during kitchen unit installation. The fitter adapts the units to the specific models and the work follows on smoothly. If the kitchen is fitted without appliances and they arrive later, the exact models, or at least their installation dimensions, must be known when the units go in. The openings, sockets, water supply, waste and ducting are prepared according to them.

In an existing kitchen the job tends to be more complicated. A new appliance may have different dimensions from the old one, a different ventilation layout or a higher power rating. In practice it is common to have to alter a cabinet, enlarge the worktop cut-out or move a socket. With older units, the fitter also checks whether the housing can carry a heavier oven.

Before booking the installation, it pays to be clear on these points:

  • Built-in or fully integrated appliance: on an integrated dishwasher or fridge, a kitchen door is fixed to the appliance. Check that the kitchen includes door fronts of the correct size for this.
  • Type of hob: an induction hob needs a different supply from a gas hob. Agree in advance whether an electrician or a Gas Safe registered engineer will attend.
  • Ducted or recirculating extractor hood: this decides whether a hole through the wall and a duct run are needed.
  • Fridge door fixing method: a sliding door system or fixed door hinges. The fridge manufacturer specifies it and the kitchen must suit it.
  • Who supplies the small items: isolating valve, sink trap with a dishwasher spigot, sealing tape, ventilation grilles. Agree this beforehand so the job does not stall over a minor part.

How the installation proceeds step by step

  1. Checking appliances and instructions: the fitter compares the installation dimensions in the instructions with the openings in the units and checks the appliances for damage.
  2. Checking connections: the positions of sockets or switched spurs, the hob supply, the isolating valve, the trap and the opening for the hood ducting are checked.
  3. Adjusting units and making cut-outs: the hob opening, and where relevant the sink opening, is cut in the worktop using the template. The cut edges are sealed. A steam protection strip is fixed above the dishwasher.
  4. Fitting and levelling: the appliance is slid into the opening, levelled with a spirit level using the adjustable feet or packers, and screwed to the cabinet sides.
  5. Connecting: the dishwasher is connected to water and waste, the oven and microwave to the prepared supply. Hard-wiring the hob and connecting gas appliances follow the rules in the safety section below.
  6. Doors and fronts: on integrated appliances, the furniture doors are fitted, aligned with the neighbouring doors and adjusted, including the spring tension on the dishwasher.
  7. Ventilation: plinth grilles are fitted and the ventilation gaps required by the manufacturer are checked to be clear.
  8. Testing: each appliance is switched on, the dishwasher runs at least a short programme and the connections under the sink are checked.
  9. Handover: the fitter clears away the packaging and hands over the installation instructions and any connection paperwork.

How individual appliances are fitted

Oven and microwave

The oven slides into a base unit or tall housing, is levelled and screwed through the holes in its frame. The supply should be accessible without pulling the oven out, typically via a switch or socket in an adjacent position rather than directly behind the appliance. The manufacturer specifies ventilation gaps, usually behind or below the oven, and these must stay clear. With a microwave, the fitter also checks that its door does not catch on the neighbouring doors when opened. For the full connection of these appliances, see oven and extractor hood installation and connection.

An oven is a high-power appliance. Before connecting, compare the rating on the data plate and in the instructions with the circuit it will run on and how that circuit is protected at the consumer unit. Powerful appliances are normally put on their own dedicated circuit. If the supply is shared with other large appliances, or there is any doubt, have an electrician assess it.

Hob

The opening is cut in the worktop to the manufacturer's template. The cut edges are sealed so water cannot get in. The hob sits on its sealing tape and is secured with clips. Induction and higher-power electric hobs are hard-wired through a terminal block, usually on a dedicated cooker circuit. This is work for a qualified electrician.

If an oven is built in under the hob, both must be approved for that combination in the manufacturers' instructions. Some induction hobs need free space or an air gap underneath, otherwise they overheat and cut out.

Dishwasher

The dishwasher connects to a cold water isolating valve, and the waste goes to the spigot on the sink trap. Hoses must not be kinked, and the waste hose should rise first and only then drop to the trap, so that water from the sink cannot flow back. On a fully integrated dishwasher, the kitchen door front is fixed to the appliance door and the spring tension is set so the door neither drops open by itself nor is too stiff.

Fridge

A built-in fridge needs ventilation, usually through a plinth grille and a clear gap behind the back or above the housing. The kitchen door is joined to the fridge door either with a sliding door system or with fixed hinges. The manufacturer specifies which system is correct for a particular fridge.

After transport, a fridge should generally not be switched on straight away. The instructions state how long it should stand before connection, and this is usually longer if it was transported lying down.

Extractor hood

A hood either extracts to the outside or recirculates through a carbon filter. The manufacturer sets the minimum height above the hob, and it is usually greater over a gas hob than over an electric one. In a block of flats, do not connect the hood to a shared ventilation duct without permission from the managing agent, freeholder or management company. In many blocks this is not allowed, which is why recirculation is the usual choice there.

What affects the price of appliance installation

The guide labour price is €55.00 per piece. It applies to standard installation of one appliance into a prepared opening with the connections already in place. Whether a cut-out in a laminate worktop is included varies between fitters, so check the quote. The final figure depends on these factors:

  • Type of appliance: an oven onto a ready supply is among the simplest. A fully integrated dishwasher or fridge with door fitting and adjustment takes more work and usually costs noticeably more.
  • Worktop cut-outs: cutting a laminate worktop during a new kitchen fit is routine work. A later cut-out or enlarging an opening in a finished worktop, especially stone, quartz or compact laminate, costs considerably more and is often done by the worktop maker with specialist tools, in the same way as invisible mitred joints in worktops.
  • State of the connections: a missing or badly placed socket or hob supply, a missing isolating valve or a trap without a dishwasher spigot means extra work, charged separately.
  • Hard-wired electrics and gas: the electrician's or gas engineer's work is usually a separate item, for gas including the relevant paperwork.
  • Hood ducting: recirculation is simpler. Ducting through a wall or ceiling, with core drilling and a duct run, adds significantly to the cost.
  • Older kitchen: altering a cabinet, reworking an opening or strengthening a base for a heavier oven is added according to the extent.
  • Number of appliances: because the price is per piece, a whole kitchen adds up. Some fitters charge less when doing several appliances in one visit, since repeat call-outs are avoided.

When comparing quotes, ask exactly what the per-piece price includes: cut-out, edge sealing, steam protection strip, door fitting and removal of packaging, or whether these are separate items.

What makes the job easier and what slows it down

The work goes quickly when the services are in the right places, the openings match the instructions and the appliances are unpacked and ready near the kitchen. It helps when:

  • the appliances are delivered before the fitting day and have been checked to be undamaged and the models ordered,
  • the installation instructions and cut-out templates from the packaging are to hand,
  • the units are assembled and levelled and the worktop is fitted,
  • the kitchen has working power and the water can be turned off,
  • there is clear space around the kitchen for handling and unpacking,
  • the electrician or gas engineer is booked for the same day or straight after.

The job takes longer when a different model arrives than planned, a template is missing, a damaged item has to be replaced or other trades are still working in the kitchen, for example a tiler doing the splashback.

Safety: when the work belongs to a professional

Hard-wiring a hob, altering the electrical installation and adding new circuits at the consumer unit should only be done by a qualified electrician. Incorrect wiring can cause an overheated cable, a short circuit or electric shock. After a hard-wired connection, ask the electrician for written certification of the work. Where the installation was altered or a circuit added, this should include the appropriate electrical installation certificate with test results, with the work done to BS 7671:2018+A4:2026, the current IET Wiring Regulations. In England and Wales a new circuit or a consumer unit replacement is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts.

A gas hob or gas oven may only be connected and tested by a Gas Safe registered engineer, who will also provide the paperwork for the work. Check the back of the engineer's ID card to see which work they are qualified for. If you smell gas in the kitchen, turn off the gas at the meter, do not operate any electrical switches, open the windows, leave the property and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). Call this network number, not your energy supplier, and for LPG use the number shown on the tank or meter.

Warranty is another reason for professional installation. Manufacturers often state in their terms that a claim may be refused if the appliance was installed contrary to the instructions. Keep the installation instructions and connection paperwork.

Work affecting the common parts of a block of flats, such as a ventilation shaft or an external wall, requires permission from the managing agent, freeholder or management company.

Typical mistakes and how they show up later

Blocked ventilation gaps around the oven or fridge. The appliance overheats and runs noisily. The fridge uses more energy and the compressor wears out sooner.

Unsealed edges of the worktop cut-out. The chipboard around the hob or sink gradually soaks up water and swells. The worktop lifts around the opening, and the repair often means replacing the whole worktop.

No steam protection above the dishwasher. When the dishwasher is opened, steam hits the underside of the worktop, which delaminates and swells from below.

Kinked supply or waste hose and a leaking joint at the trap. The dishwasher shows an error, fills or drains poorly. A leaking joint drips unnoticed into the sink unit and only shows as a swollen cabinet base or a stain on the floor.

Waste hose without an upward loop. Dirty water from the sink can run back into the dishwasher, where it then smells.

Appliance not level. Doors rub or do not close properly, the fridge seal does not sit tight and water remains in the bottom of the dishwasher.

Socket directly behind the appliance. When the appliance needs disconnecting for a fault or cleaning, it has to be pulled out of the kitchen.

Hood connected to a shared shaft without permission. Cooking smells can reach the neighbours and the managing agent may demand disconnection.

How to check the finished work

At handover, go through these points:

  • appliances are level and firmly fixed and do not move when pushed,
  • kitchen and appliance doors are aligned, open smoothly and do not rub,
  • the hob sits flat and the sealing tape does not stick out anywhere,
  • cut-out edges are sealed and there is a steam protection strip above the dishwasher,
  • the dishwasher has run at least a short programme and there is no water under it or at the trap,
  • the fridge is cooling and the ventilation grilles are not covered,
  • the hood runs on all speeds and the light works,
  • sockets and switches are accessible without pulling out an appliance,
  • for a hard-wired hob there is written certification from the electrician, and for gas the paperwork from the Gas Safe engineer,
  • installation instructions and warranty documents have been kept.

DIY guide: fitting a built-in dishwasher to existing connections

If there is an isolating valve and a trap with a dishwasher spigot under the sink and a supply ready next to it, a competent DIYer can fit a built-in dishwasher. Hard-wired appliances, changes to the electrical installation and gas are outside the scope of this guide.

  1. Read the installation instructions and compare the opening dimensions with the dishwasher.
  2. Fix the steam protection strip to the underside of the worktop above the opening.
  3. Turn off the isolating valve and put a cloth under the trap.
  4. Connect the supply hose to the valve and the waste hose to the trap spigot, running the waste hose upwards first.
  5. Slide the dishwasher into the opening without kinking the hoses.
  6. Level the dishwasher with a spirit level using the adjustable feet.
  7. Screw the dishwasher to the cabinet sides or the worktop as the instructions specify.
  8. On an integrated model, fit the kitchen door front using the template and adjust the door springs.
  9. Open the valve, connect the power and run a short programme.
  10. Check the joints at the valve and trap and look for any water under the dishwasher.

Frequently asked questions

A guide price is €55.00 per piece for standard installation into a prepared opening with connections in place. A fully integrated appliance with door fitting, a later cut-out in a stone worktop, ducting a hood through a wall or alterations to an older kitchen cost more. The electrician's and gas engineer's work is usually charged separately.

Related work

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.