Installation of Timber Trussed Rafter Roofs

Installing a trussed rafter roof means setting factory-made timber trusses on the wall plate, fixing them down and bracing them. The guide price is around €4.70 per m², driven mainly by span, roof shape and crane access.

Updated 09/2026·12 min read·9 price list items
Standard labour price
€4.70/ m²
Indicative range
€3.76 - €6.10
60 m² flat
€705.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Installation of Timber Trussed Rafter Roofs

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Roof carpentry9 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Roof structure cost

Install trussed rafters (timber connector plates)m²€4.70 / m²m²enter quantity-
Install timber floor joistslmlm-
Install traditional pitched roof structureslmlm-
Install wall platelm€10.00 / lmlmenter quantity-
Install rafterslm€7.50 / lmlmenter quantity-
Install collar tieslm€5.50 / lmlmenter quantity-
Install purlins / postslm€7.90 / lmlmenter quantity-
Pitched roof truss installationm²m²-
Roof truss installation (hipped / pyramid roof)m²m²-
Total labour
- enter quantity
Create quote from price list →

What a trussed rafter roof is and when you will come across one

A trussed rafter roof is a load-bearing roof structure that arrives on site ready-made from the factory. The individual timber members are joined with metal nail plates, and each truss is made to a structural design for the specific house, prepared by an engineer to Eurocode 5 (BS EN 1995-1-1) with the UK National Annex. On site, the erection crew sets the trusses on the wall plate, lines them up, fixes them down and braces them. This work is most common on bungalows, single-storey houses, garages and extensions, once the shell is complete and the roof needs closing in as quickly as possible.

The difference from a traditional cut roof lies in where the work happens. With a traditional cut timber roof, carpenters measure, cut and join the rafters, purlins and struts on site. Trussed rafters are made in a factory from drawings and only assembled on site. Erection is fast, but every decision has to be made before manufacture. For a broader view of the trade, see the overview of carpentry construction.

Trusses are usually made from kiln-dried softwood of a specified strength class, for example C24. They are typically treated with a preservative against insects and fungal decay. Nail plates are galvanised steel plates with teeth that are pressed into the timber with a hydraulic press. A plate nailed on by hand does not have the same load capacity as one fitted in the factory. On houses, trusses commonly span roughly 8 to 12 m, and longer spans can be made.

When a trussed rafter roof suits and when it does not

Trusses can span the full width of the house and carry the load to the external walls. Fewer internal load-bearing walls are needed, so the layout can be more open. On a simple gable or hipped roof over a regular footprint, the precision of factory manufacture and fast erection pay off well.

Why are they not suitable for every house? A standard fink or W truss has a web of diagonal members between the bottom and top chords. These take up space in the loft, so this type of roof is not suitable for a habitable loft room. Attic trusses designed for a room in the roof do exist, but the design has to allow for them from the start. On very complex roofs, with dormers and unusual details, manufacture and erection become more demanding, and a traditional cut roof may be the more sensible choice. It is worth comparing the options at design stage, not after the walls are built.

The roof forms part of the approved building work. If you want to change the roof shape, pitch or height compared with the approved drawings, check in advance with your local planning authority and building control what approval is needed. In Scotland, changing roofs or other structural elements needs a building warrant from the council before work starts. Do not assume that simply informing someone will be enough.

What to decide before ordering the trusses

A truss is designed for a specific load and exact dimensions. Anything not included in the design calculation will either not be carried by the structure or will not fit. Before ordering, be clear about the following:

  • roof covering: lightweight metal sheeting and heavy concrete or clay tiles mean very different loads and different member sizes,
  • what will hang from the bottom chord: on bungalows, a plasterboard ceiling is often fixed to the bottom chord, with insulation laid above it. Both layers must be in the calculation,
  • use of the loft space: whether it stays inaccessible or will be used for access, storage or equipment such as an MVHR unit. In that case a walkway and a higher bottom chord load are needed,
  • solar PV or solar thermal panels: panels and their mounting frames add load, and the panel fixings must land on truss members,
  • penetrations: the positions of the chimney, soil vent pipe, ventilation ducts and roof windows, so that the trusses can be arranged around them,
  • roof overhangs at the gables and eaves, which affect chord lengths and the look of the house,
  • scope of supply: whether the company also provides the structural design, delivery, crane and fixings, or only erection.

The truss manufacturer needs the floor plan, sections, roof pitch, covering type, overhangs, chimney and penetration positions, and details of the insulation. From these they prepare the structural calculations, manufacturing drawings and an erection plan. Go through the truss layout drawing with your designer before approving manufacture.

How truss erection works step by step

The most important part of the job happens before the crane arrives - the site survey and the drawings. On site there is usually a crew of three to five erectors plus a crane operator. Erection then runs as follows:

  1. Checking the wall head: the erectors check levels, flatness and dimensions of the wall head. If the design includes a wall plate, they bed it and fix it down.
  2. Unloading the trusses: they check that all components are complete, correctly marked and undamaged.
  3. First trusses: these are set according to the erection plan, usually the gable or end trusses, and carefully plumbed.
  4. Temporary bracing: battens and props stop the trusses leaning sideways or toppling over.
  5. Remaining trusses: these are placed one by one at the specified centres, typically around 0.6 to 1.2 m depending on the design, and tied to those already standing.
  6. Fixing down: each truss is fixed to the wall head with the specified truss clips, straps and fixings.
  7. Permanent bracing: longitudinal binders and diagonal bracing are added as designed. Only this turns individual trusses into a rigid whole.
  8. Overall check: plumb, flatness of the roof plane, straight ridge and eaves lines, and all fixings in place.

Each truss has a set position in the roof, and components must not be swapped by guesswork. A single standing truss is very unstable sideways. A rigid structure only exists once the bracing is complete, so this stage must not be rushed. The fixings must carry not only the weight of the roof and snow but also wind uplift, which on lightweight metal coverings can literally lift the roof.

On a simple house roof with a crane, setting the trusses often takes one to two days. Permanent bracing, trimming around openings and finishing the details can take several more days.

Erection is work at height under suspended loads. Erectors should be protected against falls, nobody steps on unbraced trusses, and nobody stands beneath a component hanging from the crane. As the client, keep out of the working area during lifting and keep children and neighbours away too.

Once the structure is complete, the breathable membrane, counter battens, battens and roof covering follow. The covering should follow BS 5534:2014+A2:2018, including mechanically fixed ridges and verges and an underlay suited to the wind zone. Fast erection only makes sense if the roofer follows on without a long gap and the building is not left open to the rain.

Price of trussed rafter roof installation per m²

The guide labour price is €4.70 per m². When comparing quotes, check whether the m² refers to the roof area or the floor area of the house. On a pitched roof with overhangs the difference is significant, and the quotes cannot otherwise be compared.

The cheapest case is a regular roof with a standard span, an accurate wall head, and lorry and crane access right up to the house. The price per m² goes up mainly because of these factors:

  • span and truss length: long trusses are harder to lift, need more people and a larger crane,
  • roof shape: a gable roof is the simplest. Hips, valleys, dormers and irregular footprints mean many different truss types and slower erection, and the price can be noticeably higher,
  • heavy covering: concrete or clay tiles require heavier members and more fixings,
  • snow and wind exposure: at higher altitude and on exposed sites, members are larger and bracing and fixing more extensive,
  • number of penetrations: chimneys, roof windows and pipes require trimmers and extra members,
  • site access: a narrow road, a slope or obstacles around the house extend crane time, which is charged by the hour,
  • small area: on a garage or extension, delivery and crane costs are spread over few m², so the price per m² tends to be higher,
  • inaccurate wall head: levelling and packing take extra time.

When comparing quotes, look at exactly what they include: structural design, manufacturing drawings, timber grade, delivery, unloading, crane, fixings, connectors and bracing. A quote that leaves something out can end up more expensive. If one company makes the trusses and another erects them, agree who deals with inaccuracies and missing components.

What must be ready on site before the trusses arrive

Precisely made trusses need an equally precisely prepared building. In practice, erection is rarely held up by the trusses themselves, but often by an uneven wall head or poor site access.

  • the building surveyed before manufacture: wall lengths, diagonals, levels and flatness of the wall head,
  • the wall head complete, with a properly cured concrete ring beam where one is designed, and fixing points ready,
  • steel beams and lintels in place, and any intermediate structure such as a timber joist floor completed, if the design includes them,
  • on an existing building where the old roof is being replaced, the existing structure already stripped, including roof decking removal. In homes built before 2000, have suspect materials tested before demolition, as asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor,
  • access for a long delivery lorry and firm ground for storing the trusses,
  • a firm, level position for the crane, if one is used,
  • scaffolding or working platforms and obstacles cleared from around the house,
  • power available for tools and a marked area for waste,
  • permission from the local council if the crane or lorry will stand on the road and the council requires it.

Coordinate the following trades in advance as well. The chimney or flue installer, the MVHR supplier and the solar PV installer should know where penetrations will go and what load the roof will carry. If the overhang, covering or chimney position changes after manufacture, the trusses cannot simply be altered on site. Such a change usually means making new components.

What makes erection easier and what slows it down

With this work, a lot depends on organisation in the days around erection:

  • delivery timed with the crane and erectors: if trusses arrive too early, they lie on site and risk damage. If they arrive late, an expensive crane stands waiting,
  • weather: in strong wind, crane work with long components stops and erection is postponed. Rain need not stop the work, but timber should not stay wet and uncovered for long,
  • roofing work ready: membrane, battens and covering ordered, and a roofer booked straight after erection,
  • availability of the client or site manager: when a query at the chimney or a penetration needs a decision, nobody should have to wait all day,
  • clear space around the house: leftover materials, spoil heaps and scaffolding set up differently from what the erectors need all slow the work,
  • neighbours: if the crane will swing over the boundary or stand in a narrow road, it is sensible to tell the neighbours beforehand.

Work at height with heavy components under a crane is a job for professionals. A non-specialist should not attempt truss erection alone, not even on a small garage. The roof is a load-bearing structure, and a mistake in bracing or fixing can endanger people and the building.

Typical truss erection mistakes and how they show later

The greatest risk comes from later alterations to the trusses. A truss works as a designed whole, so a cut web member, a shortened chord or a hole drilled for a pipe can weaken the entire structure. Any such change must be assessed by a structural engineer or the truss manufacturer.

  • Weak or missing temporary and permanent bracing: trusses can lean sideways during erection, or later under snow or wind. This shows as a wavy roof plane and a crooked ridge.
  • Truss centres different from the erection plan: a wider gap overloads mainly the battens, counter battens and the ceiling on the bottom chord. The covering can sag and cracks appear in the ceiling.
  • Too few fixings or a different fixing type from the design: in a storm, wind uplift can lift or shift the roof.
  • Trusses swapped into the wrong positions: a truss designed for a different load or support carries load in the wrong way. This may not be visible for a long time.
  • Trusses stored directly on the ground without bearers or protection from moisture: the timber absorbs water, can twist, and after installation dries slowly in a closed loft.
  • No check of flatness before battening and covering: unevenness shows in the covering, especially clearly with metal sheeting.
  • Extra load without recalculation: a heavier ceiling, equipment or items stored in the loft that the design did not allow for can overload the trusses. This shows as deflection and cracking in the ceiling.

Factory-made trussed rafters with nail plates are covered by a European product standard that sets requirements for manufacture, materials and joints. You can therefore ask the supplier for the product documentation, such as a declaration of performance.

How to check the finished roof structure at handover

Before the roofers start, go through these points with the erectors. Once the membrane and covering are on, most of them can no longer be seen, so it is worth photographing the fixings and bracing too.

  • all trusses are in position according to the erection plan and at the correct centres,
  • the trusses are plumb and the roof plane is straight when viewed along the ridge and eaves,
  • every truss is fixed to the wall head with the specified clips, straps and fixings,
  • the permanent bracing is complete, not just the temporary battens,
  • nail plates are pressed in over their full area, not lifting or deformed,
  • no member has been cut or drilled afterwards without a structural engineer's approval,
  • the timber is not split or damaged from handling,
  • trimmers are fitted around the chimney and other penetrations as designed, and the timber keeps the clearance from the chimney set by the design and the chimney manufacturer,
  • documentation is handed over: structural calculations, erection plan and declaration of performance.

Frequently asked questions

The guide price is around €4.70 per m². The final figure depends mainly on span, roof shape, covering type, crane access and the scope of the quote, meaning whether it also includes structural design, delivery and fixings.