Price the work from the price list
Enter quantities and the price recalculates instantly. You can adjust these rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
| Electrical works | ||||
| Install external LV connection to flat | pcs | - | ||
| Data cabling installation (FTP) | pcs | - | ||
| 230V socket outlet point - first fix | pcs | 6,80 € | - | |
| Switch point - first fix | pcs | 8,50 € | - | |
| Lighting point - first fix | pcs | 8,40 € | - | |
| 230V socket / switch - second fix | pcs | 11,00 € | - | |
| Pulling power cable (up to 3x2.5) | lm | 1,50 € | - | |
| Pulling data/comms cable (FTP, coaxial) | lm | 1,20 € | - | |
| Chasing for cable - brick / aerated concrete | lm | 5,80 € | - | |
| Chasing for cable - concrete / panel | lm | 8,50 € | - | |
| Making good walls after electrical installation | lm | 7,50 € | - | |
| Install and connect consumer unit | pcs | 150,00 € | - | |
| Connect 1-phase circuit breaker | pcs | 35,00 € | - | |
| Connect RCD (Residual Current Device) | pcs | 12,00 € | - | |
| Install and connect doorbell | pcs | 55,00 € | - | |
| Connect and fit room thermostat | pcs | 35,00 € | - | |
| Install LED strip with aluminium profile | lm | 12,00 € | - | |
| Installation of recessed spotlight in plasterboard ceiling | pcs | 50,00 € | - | |
| Install pendant light fitting | pcs | - | ||
| Install wall-mounted light fitting | pcs | 14,00 € | - | |
| Install and connect extractor fan (bathroom/WC) | pcs | - | ||
| TV / data socket point - first fix | pcs | 12,00 € | - | |
| TV / data socket - second fix | pcs | 50,00 € | - | |
| Professional connection of 400V hob | pcs | - | ||
What this job covers
The LV connection ends at the meter. Everything after the meter, such as the consumer unit, sockets and lights, belongs to the internal wiring. These are two separate parts, and each has its own documents and its own inspection.
The job is sometimes listed as a connection to the property and sometimes as a connection to the meter. The second name says more precisely where the work ends: at the meter cabinet, where the network operator fits the meter and seals it. When you compare quotes, check whether the contractor has included the whole route up to the cabinet or only part of it.
In practice, the main difference is where the cable runs:
- House or holiday home: the cable runs from a pole or from the network operator's distribution pillar to the meter cabinet, which usually stands on the property boundary
- Flat in a block: meters are usually in a shared cabinet in the corridor or basement, and the connection passes through common areas, so the building management or owners' association must be involved
- Commercial unit or shop: the process is similar, but the required capacity is usually higher
How the installation works, step by step
Digging the trench and laying the cable is only the middle of the process. Most of the time goes on paperwork and waiting for the network operator.
- Connection application to your local distribution network operator. You usually attach proof of ownership or the owner's consent, a site plan and the capacity you need.
- Connection offer or conditions: the network operator sets the connection point, the size of the main breaker or fuse and the technical requirements.
- Connection design by a qualified designer, in line with the relevant EN standards, national wiring rules and the operator's technical conditions.
- Trench along the route, typically about 70 cm deep, deeper under driveways and roads as the design specifies. The bottom is levelled and bedded with sand.
- Cable laying in a protective duct or a sand bed, then backfilling, compacting and a warning tape above the cable.
- Meter cabinet installation: level, firmly fixed and placed so the operator's staff can reach it.
- Inspection and testing by a qualified electrician, with a written test certificate.
- Connection by the network operator: they check the work, connect the cable to the network, fit the meter and seal the cabinet.
Why can't the digging start straight away? Because only the connection conditions tell you where the route must begin and what breaker size the operator will approve. A contractor who digs without them risks doing the work twice.
Cable, main breaker and cabinet: the options
The cable type and cross-section are set by the design, based on the required capacity and the length of the route. Short runs to houses commonly use copper cable of around 10 or 16 mm². Longer runs or higher loads need a larger cross-section, sometimes in aluminium. A long, thin cable causes voltage drop, so the size is calculated, not guessed.
The main breaker or fuse before the meter decides how much current you can draw at once:
- Single-phase supply suits a smaller flat without electric cooking or heating, typically around 1x25 A
- Three-phase supply, for example 3x20 A or 3x25 A, is common for houses and for homes with an electric hob, electric water heater, heat pump or car charger
- Higher ratings only make sense if you will really use them, because in many countries the network charge depends on the size of the main breaker
The meter cabinet must be a type your network operator accepts. Their requirements are usually published on their website. The cabinet should be weatherproof, lockable and have a place for the seal.
What makes the job easier or harder
The scope of the work, and therefore the final cost, depends mainly on:
- Route length from the connection point to the cabinet
- Ground conditions: stony or clay soil, tree roots and tight spaces slow the digging, while soft ground and room for a mini digger speed it up
- Obstacles along the route: a pavement, driveway, fence or crossings with water, gas or drainage pipes
- Hand digging or machine digging
- Cable size and number of phases
- In a block of flats: routing through common areas, passing through floors and coordinating with the building management
Before any digging, have existing services located and marked. A damaged gas or water pipe causes more trouble than the whole connection. If a gas pipe is hit during digging or you smell gas, leave the area at once and call the gas emergency line or 112. Repairs to gas pipes are a job for a qualified, registered gas engineer only.
Permits and what the network operator checks
Whether you need a building permit or only a simpler notification depends on local building regulations and on the situation, for example whether the cable crosses a neighbour's or public land. Do not plan based on what applied to a neighbour, and check the procedure with your local building authority in advance.
The network operator approves the technical solution, the main breaker size, the type and position of the cabinet and the way the cable is laid. If the finished work differs from the approved design, they may refuse to connect it. For a flat, you also need consent from the building management or owners' association, because the work affects common parts of the building.
Work on the electrical connection may only be done by a qualified, authorised electrician. At most, you can dig the trench yourself following the contractor's instructions. Laying the cable, making the connections and testing belong to a professional.
Common mistakes
- Digging before the design is approved. The operator then sets a different connection point and part of the work is repeated.
- An unapproved cabinet type, or a cabinet the operator cannot access.
- A trench that is too shallow or has no sand bedding, and no warning tape.
- The wrong breaker size: too small and it trips in normal use, too large and the network charges are higher than necessary.
- No spare capacity even though a heat pump or car charger is planned in a few years. Replacing a buried cable later is avoidable extra work.
- A missing test certificate, without which the operator will not connect and the building authority may not sign off the project.
How to check the finished work
Before you sign the handover form, go through these points:
- The route and depth match the design
- The cable lies in sand or in a duct, with warning tape above it
- The trench is backfilled, compacted and the surface reinstated
- The meter cabinet is an approved type, level, firmly fixed and accessible
- The main breaker or fuse matches the connection conditions
- You have the design, the test certificate and the documents for the materials used
- In a block of flats, the building management or owners' association has approved the finished work
Frequently asked questions
No. The connections and testing must be done by a qualified, authorised electrician. A homeowner can at most help with the digging, if the contractor agrees and the route has been marked out.
The installation itself usually takes days. The whole process, including the connection conditions, the design and the operator's appointment, often takes weeks or even months, so it pays to apply as early as possible.
For a house, or a flat with electric cooking, electric water heating or a planned heat pump, a three-phase supply is usually the choice. A designer can help you set the right breaker size based on your appliances.
The meter is always fitted and sealed by the network operator's staff, once the connection is finished and you have the test certificate.