Building work price list: Suspended Light Fitting Installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Electrical works cost | ||||
| Install pendant light fitting | pcs | €55.00 / pcs | pcs | enter quantity- |
| Data cabling installation (FTP) | pcs | pcs | - | |
| 230V socket outlet point - first fix | pcs | €6.80 / pcs | pcs | enter quantity- |
| Switch point - first fix | pcs | €8.50 / pcs | pcs | enter quantity- |
| Lighting point - first fix | pcs | €8.40 / pcs | pcs | enter quantity- |
| 230V socket / switch - second fix | pcs | €11.00 / pcs | pcs | enter quantity- |
| Pulling power cable (up to 3x2.5) | lm | €1.50 / lm | lm | enter quantity- |
| Pulling data/comms cable (FTP, coaxial) | lm | €1.20 / lm | lm | enter quantity- |
| Chasing for cable - brick / aerated concrete | lm | €5.80 / lm | lm | enter quantity- |
| Chasing for cable - concrete / panel | lm | €8.50 / lm | lm | enter quantity- |
| Making good walls after electrical installation | lm | €7.50 / lm | lm | enter quantity- |
| Install and connect consumer unit | pcs | €150.00 / pcs | pcs | enter quantity- |
| Connect 1-phase circuit breaker | pcs | €12.00 / pcs | pcs | enter quantity- |
| Connect RCD (Residual Current Device) | pcs | €30.00 / pcs | pcs | enter quantity- |
| Install and connect doorbell | pcs | €55.00 / pcs | pcs | enter quantity- |
| Connect and fit room thermostat | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install LED strip with aluminium profile | lm | €12.00 / lm | lm | enter quantity- |
| Installation of recessed spotlight in plasterboard ceiling | pcs | €50.00 / pcs | pcs | enter quantity- |
| Install wall-mounted light fitting | pcs | €14.00 / pcs | pcs | enter quantity- |
| Install and connect extractor fan (bathroom/WC) | pcs | pcs | - | |
| TV / data socket point - first fix | pcs | €12.00 / pcs | pcs | enter quantity- |
| TV / data socket - second fix | pcs | €50.00 / pcs | pcs | enter quantity- |
| Professional connection of 400V hob | pcs | pcs | - | |
| Install external LV connection to flat | pcs | pcs | - | |
When you need a pendant or chandelier installed and why it is a job for an electrician
A suspended light fitting hangs on a cable, chain or rod and connects to an existing lighting point and switch. You need this work when replacing an old fitting, during a refurbishment, or when you have bought a new pendant for over the dining table or in the living room.
The job combines electrical work with the load-bearing capacity of the ceiling, so it should be carried out by a qualified electrician. Poor connections can cause electric shock or fire. A poor fixing can let the fitting fall, and fittings often weigh several kilograms and hang over a table or a walkway. More on the trade in general is in the overview of electrical installation work.
What to clarify before buying and installing
Most complications during installation can be foreseen. It helps to clarify the following before booking an electrician:
- Weight of the fitting: this is on the box or in the instructions. It decides whether the existing hook is adequate, which fixing is used and whether a plasterboard ceiling can carry it. Tell the electrician in advance so the right fixing is brought along.
- Ceiling type: solid concrete, precast concrete slab, plasterboard or a timber joisted ceiling. Each needs a different fixing.
- Position: whether the fitting goes on the existing lighting point or somewhere else. A new point means extra work and sometimes chasing a wall or ceiling.
- Drop height: over a table it is set from the tabletop, in a walkway from people's height. Know the length of the cable or chain before installation.
- Control: a standard switch, two circuits, a dimmer, a remote control or an app. For dimming, check that both the fitting and the lamps are dimmable and that the existing dimmer is compatible with them.
- Lamps: which cap type and maximum wattage the fitting allows. Buy bulbs or LED lamps beforehand if they are not included.
- Earth: Class I fittings, which include most fittings with a metal body, always need an earth connection. The class is shown in the instructions or on the label. If there is no earth at the lighting point, this must be sorted out before installation, not bypassed.
How high and where to hang the fitting
Nobody walks over a dining table, so a pendant can hang lower there than in a living room. It lights where it is needed and, if not too high, does not dazzle people sitting at the table. As a guide, the bottom edge of the fitting over a table hangs roughly 60 to 80 cm above the tabletop. In areas where people walk, it should be around 210 cm above the floor or higher so nobody hits their head.
Over a long table, two or three smaller pendants in a row often look better and give more even light than one large fitting. Before installation, measure the room height, the table height and the position of the table relative to the lighting point. If the point is not directly above the centre of the table, the fitting can be moved over with a decorative swag hook on the ceiling or with a new lighting point.
If you are unsure about the height, agree with the electrician to try it out temporarily before the cable or chain is shortened. A shortened cable cannot be lengthened again.
How to fix a light fitting to concrete, plasterboard and timber
Concrete and precast slab ceilings
Concrete can carry even a heavy fitting. Metal expansion anchors or plugs designed for concrete are used, not the thin plastic plugs supplied in the box. In blocks of flats with precast slab ceilings, note one thing: the slabs often contain cables and hollow cores. The electrician therefore checks for cables with a detector before drilling and drills so the anchor does not end up in a void. In homes built before 2000, have suspect materials tested before you drill; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. If you want to run new cabling outside your flat, for example through communal areas, agree it first with the managing agent or freeholder.
Plasterboard ceilings
Plasterboard causes the most problems. The board alone will not carry a heavy fitting, especially when it swings during cleaning. Light fittings can be fixed with spring toggles or cavity fixings rated for the load stated by the manufacturer. A heavier fitting belongs on a ceiling support channel, on a noggin or timber pattress fitted above the board, or directly into the structural ceiling above using threaded rod. If the ceiling is still being built, it is worth fitting the support for the light in advance.
Timber ceilings and joists
If the fitting sits directly under a joist, a proper screw into solid timber is enough. Where there is no joist at that point, a noggin between two joists helps. In timber ceilings the electrician also makes sure the cable and the box are not left loose against combustible material.
How the installation works step by step
When replacing a fitting in the same position, the job usually follows a clear sequence. The electrician works in this order:
- Switches off the relevant circuit breaker at the consumer unit and confirms with a voltage tester that the lighting point is dead.
- Removes the old fitting: shades, bulbs, canopy, connectors and the original bracket.
- Checks the conductors at the lighting point, looking at the condition of the insulation, the type of cable and whether an earth is present.
- Assesses the original hook or bracket. It stays only if it is secure and can carry the weight of the new fitting. Otherwise a new fixing suitable for the ceiling is installed.
- Adjusts the length of the cable, chain or rod to the agreed drop height.
- Connects the line, neutral and earth conductors into the terminals and checks that the connections are tight. For a remote-controlled fitting, the receiver is also placed, either in the ceiling box or in the body of the fitting.
- Fits the ceiling canopy, levels the fitting and fits the lamps and shades.
- Switches the breaker back on and tests all functions: the switch, individual circuits where present, dimming and the remote.
If the fitting is to hang somewhere other than the original light, a new lighting point is added. In England and Wales, a new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. That means running cable in a chase, in the ceiling void or in trunking, and sometimes altering the switch. Chased walls then need making good after the electrical work.
How much installing a suspended light fitting costs and what affects the price
The guide labour price is €55.00 per fitting. It applies to a typical situation: replacing a fitting on an existing lighting point in a concrete ceiling at normal room height, with the existing wiring in good order. The labour, time and therefore the price go up in these situations:
- High ceiling: for example over a stairwell or in a house with a galleried landing, where a scaffold tower or tall ladder is needed. The work is slower and often needs two people, so the price can be considerably higher.
- Heavy or large fitting: for example a crystal chandelier assembled from many parts on site. Assembling it and hanging the drops can take longer than the wiring, so such jobs are priced higher or charged by the hour.
- Plasterboard ceiling: if a support or threaded rod into the ceiling above has to be added, there is extra material and labour. Opening up and repairing a finished ceiling adds the most cost.
- Missing or relocated lighting point: a new cable in a chase, trunking or ceiling void is separate work. It is usually the largest extra and often costs more than fitting the light itself.
- Old wiring: very old cabling, brittle insulation or no earth on the lighting circuit. Repairing the lighting point is charged as extra work, and more serious defects may call for inspection and testing of the circuit. Electrical Safety First recommends an Electrical Installation Condition Report (EICR) at least every 10 years for an owner-occupied home; landlords must have one done at least every 5 years.
- Smart and dimmable fittings: remote control, dimming or app control has to be set up and paired. Replacing an incompatible dimmer is added on top.
- Removing the old fitting: with a heavy old fitting or a rusted hook, removal takes more effort and some electricians charge for it separately.
A common worry is that a new fitting will overload old wiring. Modern LED fittings usually draw less power than old fittings with incandescent bulbs. In older properties the problem is more often the condition of the cables and connections than the load itself.
When comparing quotes, ask whether the price includes removal of the old fitting, a new fixing or anchor, assembly of the fitting and taking away the packaging.
How to prepare so the installation goes quickly
An electrician works faster when everything is ready and there is nothing to wait for or search for. It helps if:
- the fitting is already at home, unpacked and checked for all parts, screws and instructions,
- suitable lamps are bought in the right quantity,
- the area under the lighting point is clear, the table and chairs moved, and the floor covered if needed,
- the agreed height and position are clear, ideally with the table measured,
- the consumer unit is accessible and you know which breaker feeds the light in that room,
- for a smart fitting, you know the home Wi-Fi password and have the manufacturer's app installed on your phone,
- someone is at home during the work to help hold a heavy fitting or decide on the height.
The work takes longer if it turns out on site that parts are missing, the fitting differs from what was agreed, or the height and position are decided during installation. In a new build it helps if the ceiling and decoration are finished, otherwise the fitting gets dirty or has to be taken down again. If other electrical jobs are planned, such as installing and connecting a bathroom or WC extractor fan or data network cabling for smart devices, it is often efficient to book them for the same visit.
Typical mistakes and how they show up later
Unsuitable wall plug
A fitting held on a weak plastic plug holds well at first but pulls out over time, especially from plasterboard. This shows up as a loose canopy, a tilting fitting or a fall, typically during cleaning or changing a bulb.
Original hook not checked
The hook was left in place without checking whether it could carry a heavier fitting. An old hook may be corroded or set only in plaster and give way under a larger load.
Earth not connected or conductors swapped
The earth is left unconnected on a fitting that needs it, or the conductors are swapped. The light works normally, and the problem only appears during a fault, when metal parts can become live.
Loose connections
Connections are loose, not tightened or not enclosed, and simply pushed into the ceiling canopy. Later this shows as flickering, intermittent failure, a smell of overheating or browned insulation.
Incompatible dimmer
The old dimmer is not compatible with LED lamps. The light then flickers or buzzes and may switch off at low dimming levels.
Wrong height or position
The fitting hangs too low or too high, or is not centred over the table. A low fitting in a walkway becomes an obstacle, and a high one over a table dazzles people sitting there and lights the wrong area.
Drilled cable in a slab ceiling
When drilling into a concrete slab, a cable that was not traced beforehand is hit. The result can be a tripped breaker, a dead circuit and a repair that means cutting into the ceiling.
The first four mistakes are not just cosmetic. They can lead to the fitting falling, electric shock or fire. The simple rule for any work on an electrical installation is that the connection should be made by a competent, qualified electrician working to BS 7671:2018+A4:2026, the current IET Wiring Regulations, and the manufacturer's instructions. In the event of an insurance claim, the insurer may ask who carried out the installation.
How to check the finished work
Once the electrician has left, go through a few things calmly:
- the fitting holds firmly when pulled gently and the ceiling canopy sits without gaps,
- the fitting hangs straight and at the agreed height,
- no conductors or insulation stick out of the canopy,
- the switch turns the light on and off properly, and with several circuits each works separately,
- dimming and the remote work smoothly, with no flickering or buzzing,
- the ceiling around the fixing is not cracked and plasterboard is not sagging,
- after a few minutes of use there is no smell from the canopy or the fitting,
- the area around the lighting point, the floor and furniture are undamaged and drilling dust has been cleaned up,
- the electrician has handed over the instructions and warranty terms for the fitting and told you which lamps it takes.
Frequently asked questions
The guide price is €55.00 per fitting. It applies to a replacement on an existing lighting point. Expect to pay more for a high ceiling, a heavy or self-assembly fitting, a plasterboard ceiling needing support, a new lighting point or repairs to old wiring.
A replacement on the original lighting point usually takes under an hour. For plasterboard needing a support, a fitting assembled from many parts or a smart fitting that needs setting up, allow several hours.
Yes, if the conductors are in good condition and the hook can carry the new fitting. With older installations that have very old cabling or damaged insulation, the electrician will often suggest repairing the lighting point or testing the circuit.
For a standard fitting, usually not. A new or altered switch is often needed for two separately switched circuits, for dimming an LED fitting or for smart control.
The board alone cannot. A heavier fitting must be fixed to a support channel, a noggin or through the plasterboard into the ceiling above. The load ratings of fixings and the ceiling are always set by the system manufacturer.
As a guide, the bottom edge of the fitting should be roughly 60 to 80 cm above the tabletop. In areas where people walk, the bottom edge should be around 210 cm above the floor or higher.
Connecting a light fitting is work on the electrical installation and should be done by a qualified electrician. You can prepare the area, measure the heights, choose the fitting and fit the shades after installation.
Related work
How shielded FTP data cabling is installed in a flat, house or office, which cable category to choose and how to check the finished network.
How to fill cable chases and back box openings after rewiring, which filler to choose, common mistakes and how to check the wall before painting.
How a bathroom or WC extractor fan is installed and wired, which type to choose, what to watch out for and how to check the finished job.
How downlights are fitted into plasterboard ceilings: cutting the hole, wiring, choosing the fitting, typical mistakes and how to check the work.
How an electrician fits a wall light, what makes the job harder, what to watch for in bathrooms and outdoors, and how to check the finished work.
How an external low voltage connection to the electricity meter is installed, what the network operator approves, common mistakes and how to check the work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.