Price list 2026 · Europe

LED Strip Light Installation

LED strip light installation means fixing the strip, usually in an aluminium profile with a diffuser, and connecting it to a driver. The guide price is €12.00 per running metre, mainly depending on profile type, corners and controls.

Updated 09/2026·11 min read·24 price list items
Standard labour price
€12.00/ lm
Indicative range
€9.60 - €15.60
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: LED Strip Light Installation

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Electrical installation24 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Electrical works cost

Install LED strip with aluminium profilelm€12.00 / lmlmenter quantity-
Data cabling installation (FTP)pcspcs-
230V socket outlet point - first fixpcs€6.80 / pcspcsenter quantity-
Switch point - first fixpcs€8.50 / pcspcsenter quantity-
Lighting point - first fixpcs€8.40 / pcspcsenter quantity-
230V socket / switch - second fixpcs€11.00 / pcspcsenter quantity-
Pulling power cable (up to 3x2.5)lm€1.50 / lmlmenter quantity-
Pulling data/comms cable (FTP, coaxial)lm€1.20 / lmlmenter quantity-
Chasing for cable - brick / aerated concretelm€5.80 / lmlmenter quantity-
Chasing for cable - concrete / panellm€8.50 / lmlmenter quantity-
Making good walls after electrical installationlm€7.50 / lmlmenter quantity-
Install and connect consumer unitpcs€150.00 / pcspcsenter quantity-
Connect 1-phase circuit breakerpcs€12.00 / pcspcsenter quantity-
Connect RCD (Residual Current Device)pcs€30.00 / pcspcsenter quantity-
Install and connect doorbellpcs€55.00 / pcspcsenter quantity-
Connect and fit room thermostatpcs€35.00 / pcspcsenter quantity-
Installation of recessed spotlight in plasterboard ceilingpcs€50.00 / pcspcsenter quantity-
Install pendant light fittingpcspcs-
Install wall-mounted light fittingpcs€14.00 / pcspcsenter quantity-
Install and connect extractor fan (bathroom/WC)pcspcs-
TV / data socket point - first fixpcs€12.00 / pcspcsenter quantity-
TV / data socket - second fixpcs€50.00 / pcspcsenter quantity-
Professional connection of 400V hobpcspcs-
Install external LV connection to flatpcspcs-
Total labour
- enter quantity
Create quote from price list →

What LED strip installation involves and where it works well

An LED strip, often called LED tape, is a thin flexible strip of diodes with an adhesive backing. A low-output decorative strip can be stuck straight onto furniture. In most cases, though, it goes into an aluminium profile with a cover. The profile draws heat away from the diodes and protects the strip from damage. The cover, known as a diffuser, gives a continuous line of light with no visible dots.

The most common jobs are under-cabinet lighting in kitchens, strips in plasterboard ceilings, stair lighting, and backlighting for mirrors or TV walls. A strip can work as task lighting, for example above a worktop. It can also be mood or guide lighting, such as indirect light from a ceiling recess or lit stair treads. The strip, profile and controls are chosen to suit the purpose.

What to decide before installing an LED strip

The things most often forgotten with LED lighting are the cable, the driver and the controls. These are hard to change once the job is finished. Before booking the work, decide:

  • exactly where the line will run and how long it will be: length is measured in running metres, meaning metres of profile. Measure each section separately,
  • what the light is for: task lighting under kitchen units needs more brightness than indirect light in a ceiling,
  • the colour of the light: whether you want one fixed colour or the option to change it. Changing colour needs a different type of strip, as explained below under choosing the strip,
  • how the light will be controlled: by a wall switch, a sensor in the profile, a remote or an app. This decides how many cores are needed and where they must run,
  • where the driver will go: the position must allow later access and enough cooling,
  • where the 230 V supply will come from: whether there is already a lighting point, fused spur or socket, or a new one is needed.

In a new build or renovation, it is best to plan LED strips at first fix stage. The electrician can then run the cable exactly to the driver and switch positions. Nothing has to be chased out or run on the surface later. If chasing is unavoidable, allow for making good the walls after the electrical work. For the wider context, see the overview of electrical installation work.

How the installation is done step by step

With LED strips, the order of the steps and accuracy matter more than special tools. An electrician usually works like this:

  1. agrees the position of the line, its length, the light colour and the control method with you,
  2. measures the section and cuts the aluminium profile to length, mitring the corners,
  3. fixes the profile with screws, clips or adhesive. For a recessed profile, a groove is routed first,
  4. degreases the inside of the profile and sticks the strip in. The strip is cut only at the marked cut points,
  5. connects the supply lead by soldering or with a connector and insulates the joint,
  6. fits the driver and controller in the agreed position,
  7. connects the driver to the 230 V mains,
  8. clips in the diffuser, fits the end caps and checks the light along the full length.

Why is the strip stuck into a profile rather than straight onto the cabinet? The aluminium acts as a heat sink. A strip that does not overheat keeps its brightness and colour for longer.

Profile, diffuser and strip: which options to choose

Type of profile

  • surface profile is screwed or bonded onto the surface. Suits the underside of kitchen units and shelves,
  • corner profile shines at roughly 45 degrees. Works well in the corner of a cabinet or beside a mirror,
  • recessed profile sits in a groove in furniture or plasterboard. Once fitted it is flush with the surface,
  • ceiling and stair profiles have special shapes for indirect light or for stair treads.

With plasterboard profiles, timing matters. Some are fitted into the ceiling before jointing, and their edge is filled flush with the board. This must be coordinated with the dry liner or plasterer.

Diffuser

A clear cover lets more light through, but the diodes show as dots. An opal diffuser softens the light and gives a continuous line. Over a glossy kitchen worktop, an opal cover is almost always worth it. Otherwise the dots reflect in the worktop and the light looks restless.

LED strip

  • 12 V or 24 V: 24 V is better for longer runs because it loses less brightness towards the end,
  • colour temperature: living rooms and bedrooms usually get warm white at around 2,700 to 3,000 K. Kitchens and bathrooms get neutral white at around 4,000 K,
  • diode density: more diodes per metre give more even light. So-called COB strips give a continuous line even without a thick diffuser,
  • single colour, CCT or RGB strip: CCT changes the shade of white, RGB changes colour. Both need a controller and more cores,
  • IP rating: bathrooms and outdoor areas need a strip with a higher IP rating. The exact rating depends on the location, see the FAQ for bathrooms.

If a line is made of several lengths of strip, buy them together from one manufacturer. Strips with the same stated colour temperature can differ slightly in shade between manufacturers and batches. Side by side the difference shows, especially on a white wall or ceiling.

Driver and controls

An LED strip does not run directly from the mains. It needs a driver that steps the voltage down to 12 or 24 V. The driver must match the strip voltage and have spare capacity. In practice, allow about one fifth more power than the strip draws. A driver chosen right at its limit overheats, and the strip then flickers or fails early.

Working out the load is simple. Multiply the watts per metre given by the manufacturer by the length of the strip. A strip rated at 10 W per metre and 3 m long draws 30 W. The driver should therefore be at least around 36 W, and in practice the next standard size up is used.

The driver position is also important. It should not be plastered in or sealed into a ceiling with no access. Drivers often wear out after some years and need replacing. In a cabinet, above an access hatch or in a box, replacement takes minutes. If it is permanently covered, furniture or the ceiling has to be taken apart.

A driver normally gets warm in use, so it needs air around it. It should not be buried in ceiling insulation, shut in a tight sealed box or packed against other items in a cupboard. In a cupboard, free space around it or ventilation holes help.

The strip can be controlled by an ordinary switch, a touch or motion sensor in the profile, a remote or a phone app. A sensor must be placed where nothing covers it, so it reliably reacts to a hand or movement. For app control, the controller position needs a good home network signal. If coverage is weak, it may be worth combining the job with data network cabling.

Connecting the driver to the fixed 230 V wiring, or adding a new box, lighting point or switch, is work for a qualified electrician. After any work on the fixed wiring, ask for the appropriate electrical certificate. All new electrical work should be designed, installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations. A new circuit or altered part of the installation should be inspected and tested by the electrician before it is put into use, with the results recorded on the certificate. If you live in a block of flats and the work would affect communal wiring, check with the managing agent or freeholder first.

What affects the price of LED strip installation

The guide labour price is €12.00 per running metre. It applies to a standard, simple section. The final price varies with how much work the particular job involves:

  • type of installation: surface mounting is quicker. A recessed profile needs a groove routed into furniture or plasterboard, so the labour per metre is noticeably higher,
  • straight runs or corners: a straight run is the simplest. Corners need accurate mitring and a link in the strip. Each corner adds extra work,
  • length and number of sections: every break means another joint and more cabling. Several short sections under individual units cost more per metre than one long straight run,
  • cable routes: if a supply is already waiting in the wall or furniture, it is simple. Concealing cable afterwards, drilling through cabinets or running it in trunking costs more,
  • controls: a plain switch is the least work. An RGB, CCT or smart controller needs setting up and pairing with an app,
  • environment: in bathrooms and outdoors every joint must be sealed and a higher IP rated strip used, which slows the work,
  • access and height: work on ceilings or over a tall stairwell needs steps, a ladder or scaffold tower,
  • materials: when comparing quotes, check what the price per running metre includes. The profile is usually included. The strip, driver, controller and sensors are often charged separately, and their prices vary widely with quality.

For small jobs, such as one short section under kitchen units, a tradesperson may charge a minimum call-out fee. It is worth combining several sections, or other small electrical jobs, into one visit.

How long installation takes and what slows it down

A single straight surface section under kitchen units with a supply ready usually takes an electrician a few hours. Several sections with corners, recessed profiles or setting up smart controls can stretch the job to a full day or more. A recessed ceiling profile is often done in two visits. The profile goes in before jointing, and the strip is fitted after decorating.

The job goes quickly when everything is ready and decided. Delays come mainly from waiting and last-minute changes:

  • furniture is finished: kitchen units, cabinets and mirrors should be fitted and level. A profile cannot be fitted accurately to unfinished furniture,
  • materials are on site: if you buy the strip, driver and profiles yourself, have them ready before the tradesperson arrives. Include the technical data, especially voltage and watts per metre,
  • the control choice is final: changing from a switch to a sensor or app after installation often means taking things apart and new cabling,
  • the ceiling programme is coordinated: if the plasterboard profile is not fitted at the right stage, you wait for the plasterer or the ceiling has to be repaired,
  • the work area is clear: worktops, shelves and the space under the ceiling are cleared so the work can be done safely,
  • the network password is to hand: with app control, the controller is paired on site.

Typical mistakes and how they show up later

  • strip stuck to a profile that was not degreased: it peels off over time, loses contact with the aluminium and overheats at that point,
  • strip cut away from the marked cut point: a dead segment is left at the end,
  • undersized driver with no headroom: the strip flickers and the whole set-up wears out sooner,
  • driver with no ventilation: it overheats and fails earlier than it should,
  • long run fed from one end only: voltage drops along the run, so the far end is visibly dimmer, sometimes with a shifted shade. Feeding from both ends, splitting into shorter sections or using a 24 V strip helps,
  • strip bent sharply at a corner: the conductive track breaks and the strip beyond the corner does not light, or fails later. Corners are done with a connector or a linking lead,
  • IP rating too low in a bathroom: poorly sealed joints corrode and there is a risk of a short circuit. Good ventilation also helps, so consider the installation of a bathroom extractor fan if there is none,
  • cable run over a sharp profile edge: the insulation wears through over time, leading to failures or a short circuit on the low voltage side.

How to check the finished work

Most faults can be found at handover. Leave the strip on for a while and go through these points:

  • the strip is evenly lit along its full length and the far end is no dimmer than the start,
  • individual diode dots do not show through the diffuser, if that was agreed,
  • the profile is firmly fixed and straight, and the corner joints are neat,
  • end caps are fitted and the cover does not lift anywhere,
  • the strip does not flicker, even when dimmed, if it is dimmable,
  • the switch, sensor or app works and you know how to use it,
  • the driver is in the agreed position with free space around it for cooling,
  • after a longer period on, the driver is warm, which is normal, but not so hot that you cannot keep your hand on it,
  • the light colour matches what was agreed and all sections look the same,
  • no cable is visible where concealed routing was agreed, and none is pinched or chafed,
  • the area is clean, with no swarf from cutting the profile and no adhesive marks on furniture,
  • you know which strip and driver were used, so they can be matched or replaced later,
  • if the 230 V wiring was altered, you have the electrical certificate for the work.

Frequently asked questions

The guide price is €12.00 per running metre. The final amount depends mainly on the profile type, the number of corners and sections, cable routes, controls and access. Check whether the price includes the strip, driver and controller.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.