Building work price list: Recessed Lighting Installation with Hole Cutting
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Electrical works cost | ||||
| Installation of recessed spotlight in plasterboard ceiling | pcs | €50.00 / pcs | pcs | enter quantity- |
| Data cabling installation (FTP) | pcs | pcs | - | |
| 230V socket outlet point - first fix | pcs | €6.80 / pcs | pcs | enter quantity- |
| Switch point - first fix | pcs | €8.50 / pcs | pcs | enter quantity- |
| Lighting point - first fix | pcs | €8.40 / pcs | pcs | enter quantity- |
| 230V socket / switch - second fix | pcs | €11.00 / pcs | pcs | enter quantity- |
| Pulling power cable (up to 3x2.5) | lm | €1.50 / lm | lm | enter quantity- |
| Pulling data/comms cable (FTP, coaxial) | lm | €1.20 / lm | lm | enter quantity- |
| Chasing for cable - brick / aerated concrete | lm | €5.80 / lm | lm | enter quantity- |
| Chasing for cable - concrete / panel | lm | €8.50 / lm | lm | enter quantity- |
| Making good walls after electrical installation | lm | €7.50 / lm | lm | enter quantity- |
| Install and connect consumer unit | pcs | €150.00 / pcs | pcs | enter quantity- |
| Connect 1-phase circuit breaker | pcs | €12.00 / pcs | pcs | enter quantity- |
| Connect RCD (Residual Current Device) | pcs | €30.00 / pcs | pcs | enter quantity- |
| Install and connect doorbell | pcs | €55.00 / pcs | pcs | enter quantity- |
| Connect and fit room thermostat | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install LED strip with aluminium profile | lm | €12.00 / lm | lm | enter quantity- |
| Install pendant light fitting | pcs | pcs | - | |
| Install wall-mounted light fitting | pcs | €14.00 / pcs | pcs | enter quantity- |
| Install and connect extractor fan (bathroom/WC) | pcs | pcs | - | |
| TV / data socket point - first fix | pcs | €12.00 / pcs | pcs | enter quantity- |
| TV / data socket - second fix | pcs | €50.00 / pcs | pcs | enter quantity- |
| Professional connection of 400V hob | pcs | pcs | - | |
| Install external LV connection to flat | pcs | pcs | - | |
What a recessed downlight is and when it is fitted
A recessed light, usually called a downlight or spotlight, sits in a plasterboard ceiling so that it does not stick out below it. Only its thin bezel is visible. Well spaced, several downlights give even light and the room does not need a central pendant. Homeowners most often ask for downlights when refurbishing a kitchen, bathroom or hallway. Replacing old halogen downlights with LED is also common.
Hole cutting means drilling a round opening with a plasterboard hole saw. It is done in both new and finished ceilings. A new ceiling is easier, because the cables are run before the boards go up. In a finished ceiling the holes are cut afterwards and the cable is fed through the void above the ceiling. In homes built before 2000, have suspect ceiling materials tested before you drill; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
Layout and choice of fitting: what to decide in advance
Most decisions need to be made before any drilling. A hole in plasterboard cannot be moved without repairing the ceiling. A wrongly chosen fitting often cannot simply be swapped for a different one.
Spacing and number of downlights
The spacing depends on the beam angle and the ceiling height. With a normal room height and a wider beam, the spacing is usually around 80 to 120 cm. A narrow beam needs the lights closer together, otherwise bright circles and dark bands appear on the floor. The manufacturer's data or a lighting calculation gives a more precise figure.
It is worth drawing a plan. It should show the position of each light, the distance from the walls and which lights switch together. Think about future furniture as well. Light over kitchen units should fall on the worktop, not behind the person standing at it.
Switches and circuits
Decide in advance whether all lights should come on at once or in groups. For example, separate switching for the lights over the worktop and over the dining table. Each group needs its own switch cable. Adding this later is more difficult.
Which fitting to choose
LED downlights have practically replaced halogen ones. LEDs use much less energy, run cooler and last far longer. When choosing, it is worth looking at the following:
- fixed or tilting: fixed lights point straight down, tilting ones can be aimed at a picture or a worktop,
- integrated LED or replaceable lamp: integrated fittings tend to be slimmer, with a replaceable lamp (for example GU10) only the lamp is changed,
- installation depth: there must be enough space between the plasterboard and the structure above for the fitting and its driver,
- IP rating: in a bathroom this depends on the zone, that is the distance from the bath or shower, details below,
- colour temperature: warmer white (up to about 3000 K) suits bedrooms and living rooms, neutral white suits work areas,
- colour rendering (CRI): at least 80, ideally around 90 in kitchens and bathrooms so that food and skin do not look grey,
- dimming: the fitting, the driver or lamp and the dimmer switch must all be compatible.
For several rooms it is worth buying all fittings from one manufacturer and one range. The same colour temperature on the box does not guarantee the same shade from two different brands.
Downlights in a bathroom
A bathroom is divided into zones according to the distance from the bath or shower. Zone 0 is inside the bath or shower tray. Only a fitting rated for immersion (IPX7) and supplied at safety extra-low voltage may be used there. Zones 1 and 2 are above the bath and shower and the area close to them. These require at least IPX4, so IP44 or higher is the usual choice near a shower. Outside the zones a lower rating is generally enough.
Bathroom circuits should be protected by a 30 mA RCD. If the property does not have one, the electrician will propose adding it. If an extractor fan is being installed and connected in the bathroom at the same time, it makes sense to plan both jobs together.
Insulation above the ceiling
If there is thermal or acoustic insulation above the ceiling, for example in a loft, mention it in advance. The fitting and its driver need clear space to cool. The alternative is a fitting designed to be covered by insulation, often sold as IC-rated. Where the ceiling has a fire-separating role, ask the electrician whether fire-rated downlights are needed.
How fitting a downlight in plasterboard is done step by step
For a single light point, an electrician usually works in this order:
- Switch off the circuit breaker for the relevant circuit at the consumer unit and confirm with a voltage tester that the conductors are dead.
- Mark the centre of the hole according to the layout plan, using a tape measure or cross-line laser for several lights so that the rows are straight.
- Check that there is no metal ceiling track or joist, other cable, pipe or ductwork at the hole position.
- Cut the hole with a plasterboard hole saw at the diameter stated by the manufacturer.
- Pull the supply cable down from the ceiling void and check its condition.
- Connect the conductors to a connector or to the driver according to the manufacturer's diagram.
- Place the driver and connections in the void so that they do not rest directly on the fitting.
- Push the fitting into the hole and let the spring clips seat.
- Switch the breaker back on and test operation, including the full dimming range.
Standard colour coding applies to the conductors. Blue is neutral (N), brown is line (L) and green-and-yellow is the protective earth (PE). Older installations may still use red for line and black for neutral. Many LED downlights with a separate driver are double insulated and the earth is not connected to them. In that case the electrician terminates the earth safely in a connector and does not leave it loose.
A big advantage of a suspended or plasterboard ceiling is that cables can run through the void, often in flexible conduit. There is no need to chase walls and later arrange making good the walls after electrical work. The cables must still be secured, not left lying loose on the plasterboard.
Installation time depends mainly on preparation. When cables are ready at every point and the fittings are on site, downlights in a typical room are usually done within one working day, often sooner. Feeding new cables or adding a new circuit takes considerably longer.
Price of fitting downlights in plasterboard per fitting
The work is usually priced per fitting. The guide labour price is €50.00 per fitting. The difference between a simple and a difficult point can be large, however. It is therefore worth checking in the quote what the price includes.
- Cable ready: the easiest case is a new ceiling where the electrician left a cable with spare length at each point before boarding. Fitting is then quick and clean and the price per point is lowest.
- Additional wiring: feeding cable above a finished ceiling or adding a new lighting circuit takes much longer. This is often a separate item from fitting the light itself.
- Ceiling type: a double-boarded ceiling or closely spaced tracks or joists make cutting and cable feeding harder. The risk of a hole hitting a joist or track also increases.
- Insulation above the ceiling: when clear space has to be made around the fitting or insulation moved aside, this adds time at every point.
- Ceiling height: a high ceiling or a stairwell needs a tower scaffold or tall ladder. This raises the cost.
- Condition of old wiring: older properties may have wiring in poor condition. Repairing or replacing it is separate work. Electrical Safety First recommends an EICR at least every 10 years for an owner-occupied home; landlords must have one done at least every 5 years.
- Replacing old downlights: if the new fitting does not suit the existing hole, enlarging the hole or repairing an oversized one is added.
- Type of fitting: tilting fittings, fittings with a separate driver and dimmable sets need more wiring and setting up than a simple fixed downlight.
- Testing and certification: new work should be designed, installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations, and a certificate issued. Depending on the extent of the work this may be charged separately.
With more lights in one room, the time per fitting usually falls. The electrician marks all points at once, cuts one diameter and connects identical fittings.
What makes the work easier and what slows it down
The job goes faster when the site is prepared:
- fittings, drivers and dimmers are bought and on site before the electrician arrives, with instructions showing the cut-out diameter,
- a layout plan with dimensions is ready, or the points are marked directly on the ceiling in pencil,
- the consumer unit is labelled so it is clear which breaker serves which circuit,
- there is clear space for a ladder below the work area and furniture is moved or covered against plasterboard dust,
- the ceiling is taped, filled and sanded but not yet painted, so small repairs around the holes can be finished during decorating.
If the ceiling is still open, it is a good moment to run other cables through the void as well, for example for data network cabling with FTP cables.
The work takes longer when fittings are bought during installation or the layout changes on site. It is also delayed when a single circuit cannot be isolated and the whole property has to be switched off.
Typical mistakes and how they show later
These problems come up repeatedly in practice:
- The hole is off line. The row of downlights then looks crooked. It shows most when looking along the room and alongside furniture or tiling.
- The hole saw is the wrong diameter. A larger hole will not hold the fitting. The downlight loosens over time or falls out.
- The plasterboard breaks under heavy pressure on the drill. A broken edge remains around the hole that the bezel may not cover.
- The drill hits a cable. This happens when the circuit was not switched off. It is dangerous. The damaged cable must be repaired above the ceiling.
- The LED driver lies on insulation or directly on the fitting. It overheats and the light fails early, flickers or changes colour.
- Connections are only wrapped in tape instead of using a proper connector. Such a joint loosens and heats up over time. Above the ceiling it can cause a fire.
- The dimmer is not compatible. The light flickers or buzzes, often only at lower dimming levels.
An oversized hole can sometimes be covered by a decorative trim ring. If that is not enough, filler alone will not help, because the pressure of the spring clips would break the edge again. A plasterboard patch with a backing piece is therefore fixed into the hole, or the whole section of board between joists or tracks is replaced. Once filled and set, the hole is cut again.
Enlarging a small hole with a hole saw is not easy. The pilot drill has nothing to grip and the saw jumps and tears the edge. The electrician therefore uses a template, a piece of board with a hole at the required diameter, held or fixed to the ceiling. Another option is an adjustable circle cutter or carefully trimming the edge to a drawn circle.
Why this work belongs to an electrician
Although the job looks simple, it is work on the electrical installation, which is part of wider electrical installation work. It should be carried out by a qualified, competent electrician, ideally one registered with a recognised scheme who can certify the work. In England and Wales, a new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) who can self-certify the work, or notify building control before you start. Faulty connections can cause a short circuit, electric shock or fire. In the enclosed space above a ceiling it may not be noticed straight away. The procedure above describes how an electrician works so that you know what to expect. It is not a guide to doing it yourself.
The electrician will also assess whether the circuit can take additional lights and whether the bathroom has the correct IP ratings and RCD protection. He or she will also confirm what testing and certification the work requires. If you live in a block of flats and the work would affect communal wiring, check first with the managing agent or freeholder.
How to check the finished work
At handover it is worth going through these points:
- all lights work and each switch controls the correct lights,
- when dimmed, the light does not flicker and the fittings do not buzz across the whole range from lowest to highest,
- the lights are in a straight line and at the same distance from the walls,
- the bezels sit flat against the ceiling and there is no visible broken plasterboard around them,
- a fitting does not move or drop out when gently pressed,
- the colour of light is the same at every point,
- tilting fittings can be adjusted and stay in position,
- in the bathroom the fittings have a rating suitable for the zone and the circuit is RCD protected,
- no plasterboard dust or debris has been left on furniture or the floor,
- you have the instructions, fitting details and, for new work, the electrical certificate.
Frequently asked questions
Roughly €50.00 per fitting. The price is lowest with a new ceiling and a cable ready at each point. Expect to pay more for a double-boarded ceiling, insulation above it, a high ceiling or dimmable sets. Feeding cables, a new circuit and certification are usually priced separately.
With cables ready and fittings bought, one room is usually done within one working day, often sooner. If cables have to be fed above a finished ceiling or a circuit added, the work takes longer.
Yes. The hole is cut afterwards and the cable is fed through the void. It is more work than with a new ceiling, but the ceiling usually does not need to be taken down.
Yes, if its rating suits the zone, at least IPX4 above a shower, and the circuit is protected by an RCD. Details of the zones are in the section on bathroom downlights. Leave the specific choice to the electrician.
Often, but not always. Before buying, measure the hole diameter and look for an LED fitting with the same or a slightly larger cut-out. Check the depth as well, because some LED fittings need space for a separate driver.
Most often because the dimmer, driver and fitting are not compatible. The solution is usually a suitable dimmer or a fitting clearly marked as dimmable.
It depends on the fitting, and the manufacturer states the required installation depth. Slim LED downlights fit into a small void. Tilting fittings and those with replaceable lamps need more space.
Related work
How shielded FTP data cabling is installed in a flat, house or office, which cable category to choose and how to check the finished network.
How to fill cable chases and back box openings after rewiring, which filler to choose, common mistakes and how to check the wall before painting.
How a bathroom or WC extractor fan is installed and wired, which type to choose, what to watch out for and how to check the finished job.
How a pendant light or chandelier is installed, how to fix it safely to different ceilings, how high to hang it and how to check the finished job.
How an electrician fits a wall light, what makes the job harder, what to watch for in bathrooms and outdoors, and how to check the finished work.
How an external low voltage connection to the electricity meter is installed, what the network operator approves, common mistakes and how to check the work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.