Price list 2026 · Europe

Fitting internal blinds

These days, internal venetian blinds, pleated blinds and fabric roller blinds are most often fitted directly to the sash of a uPVC window. They can also be fitted inside the reveal, on the wall above the window or on the ceiling. The fitting itself takes only a short time per window.

Updated 11/2026·11 min read·3 price list items
Standard labour price
€45.00/ pcs
Indicative range
€36.00 - €58.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Fitting internal blinds

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Carpentry and joinery3 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Window coverings cost

Install internal blindspcs€45.00 / pcspcsenter quantity-
Install curtain poles & railspcs€25.00 / pcspcsenter quantity-
Install external roller shutters / blindspcspcs-
Total labour
- enter quantity
Create quote from price list →

When internal shading makes sense

An internal blind is mainly about privacy, cutting glare while you work and darkening a bedroom. It is fitted without touching the facade and without any building work, which is why it is a common choice in rented flats, in concrete blocks of flats and with new windows where no external shading was planned. It is also easy to swap when you change the furnishings of a room.

Bear in mind, however, that internal shading only stops the light once it has passed through the glass. It does less to stop a room overheating in summer than external shading, which catches the sun before it reaches the window. If your main aim is a cooler room in the loft or on the south side, it is worth comparing both options.

What to decide before fitting

Type of shading

  • venetian blinds: aluminium slats, on uPVC windows most often as a system fitted directly to the sash between the glazing beads. The slats can be tilted, so you can control the light without closing the blind fully,
  • pleated blinds: folded fabric that can be moved from the top as well as from the bottom. They are made in a tensioned version with side guides on the sash and in a freely hanging version. Pleated blinds are also made for non-standard shapes such as sloping, triangular or roof windows,
  • fabric roller blinds: standard ones as well as day and night blinds with alternating stripes. Small roller blinds are fitted to the sash, larger ones to the wall, inside the reveal or to the ceiling.

On the window frame or above the window

Fitting to the sash means the shading moves together with the sash. The window can be tilted or opened and the shading stays in place. The windowsill stays clear, plant pots do not get in the way and there is no gap behind the shading for light to come through.

Fitting to the wall above the window or to the ceiling is chosen for large windows, French windows and balcony doors, when one roller blind is to cover several windows at once, or when the owner does not want any holes in the window frames. With this method the blind must overlap the window at the sides and at the top, otherwise light shows around it, and the shading may get in the way when opening the window.

With screws or without drilling

Most sash-mounted systems are screwed into the glazing bead. Manufacturers also offer no-drill solutions: hooks or brackets that slide onto the top edge of the sash, clamp brackets for pleated blinds and, for some pleated blinds, an adhesive rail stuck directly to the glass. With sash brackets you need to check that the sash is not thicker than the system allows and that the brackets do not foul the window hardware.

On forums, people write that their no-drill roller blinds have held for several years. The most common complaint is a different one: when the window is opened fully, the roller tube hits the wall of the reveal, so the window only opens halfway and the blind sometimes slips out of its brackets. From people's experience this is a problem with balcony doors, so it is worth checking before you order.

Operation and child safety

Blinds are operated by cord, chain, wand, handle or motor. Because of the risk of children being strangled, the EN 13120 standard sets rules for the length and fixing of cords. Manufacturers state in their fitting instructions that if the fitting height is not known, the operating cord or chain may be no longer than two thirds of the blind's height. The safety connector on a loop must separate under a load of 6 kg within 5 seconds. With a continuous chain, the bottom of the loop must be more than 1.5 metres above the floor and the loop is held taut with a tensioner. In a child's room, operation by handle or wand is therefore the best choice.

How internal blinds are measured

With made-to-measure shading, measuring matters more than the fitting itself. A wrong measurement cannot be fixed with a screwdriver.

  • on the sash: the width is measured close to the glass, from the inner edge of the left glazing bead to the inner edge of the right one, including the seal. Measure at the top, middle and bottom and order using the smallest figure. The height is measured at the same depth from the top to the bottom glazing bead,
  • glazing bead depth: for sash-mounted blinds this decides whether packers are needed under the top rail. For pleated blinds with side guides, the manufacturer gives a minimum rebate depth of 23 mm,
  • inside the reveal: the roller blind is ordered a few millimetres narrower than the reveal so that it can be fitted,
  • on the wall above the window: an overlap is added to the width of the opening on both sides, 5 to 15 cm on each side depending on the manufacturer. The blind is hung 5 to 15 cm above the window, and the bottom overlap is also added to the height.

A steel tape measure and measuring in several places are worth it. Look out for handles, radiators and windowsills that could get in the way of the shading.

How fitting works step by step

  1. Checking the delivery: the fitter checks the dimensions, colour and control side. One blind manufacturer warns that the blind must not be extended before fitting and should be handled in a horizontal position.
  2. Offering up and marking: the blind is held against the open sash or the wall and the screw positions are marked. For pleated blinds a fitting template is used to hold the brackets in the correct position.
  3. Pre-drilling: on uPVC windows the screws go into the glazing bead, on timber and aluminium windows you pre-drill first. Drilling into the wall depends on the material; into plasterboard without hammer action and at lower speed.
  4. Fixing the top rail or brackets: a smaller sash-mounted blind is fixed with two screws, a larger one with four, and on wide windows a screw is added in the middle. For wall-mounted roller blinds the number of brackets depends on the width; with one manufacturer it is two up to 90 cm, three up to 160 cm and four up to 220 cm.
  5. Side guides: on sash-mounted venetian and pleated blinds the nylon guide lines are tensioned and anchored in the bottom glazing bead. The blind then stays against the glass when the window is tilted.
  6. Controls and safety devices: the operating cord or chain is fitted at the correct length, along with the safety connector and, for a continuous chain, a tensioner on the wall or frame.
  7. Cover caps and operation check: the caps are fitted, the shading is raised and lowered several times, the slats are tilted and opening and tilting the window is tested.

For pleated blinds the manufacturer warns against driving the screws fully home with a cordless screwdriver. The screw strips easily and then no longer holds in the plastic bead. It should be tightened by hand.

Where you may screw into a uPVC window

When fitting to a uPVC window, the manufacturer's fitting instructions say to screw only into the glazing bead, not into the sash frame, so as not to damage the sash. Short screws are used, in the instructions for example 3.5 × 12 mm or 3.9 × 16 mm. If the shape of the bead does not allow drilling from above and the hole for anchoring the guide line has to be made from the face of the bead, the fitter must take care of the glass and should agree this in advance with the customer.

When fitting to the wall above the window, you need to know what you are drilling into. Above the window there is usually a lintel in masonry, concrete in prefabricated blocks of flats, and often plasterboard in lofts and under suspended ceilings. Plasterboard needs fixings designed for plasterboard, and the weight of the shading should be compared with their load capacity. If there is a plasterboard recess for a curtain or LED strip above the window, the roller blind can be hidden inside it.

What affects the price

The guide price for labour is €45.00 per piece, excluding the blind itself. The final amount is mainly affected by the following:

  • number of pieces: each blind is priced separately. With several windows in one flat, the time for travel and preparation is spread over more pieces,
  • type of shading: a venetian blind with side guides or a tensioned pleated blind takes more work than a small no-drill roller blind on hooks,
  • fitting method: sash, reveal, wall or ceiling. Drilling into a concrete lintel is slower than screwing into a glazing bead,
  • size and weight: a large roller blind across a whole window or balcony door needs more brackets and often two people,
  • non-standard windows: sloping, triangular and roof windows are more demanding to measure and fit,
  • measuring: some fitters charge for measuring separately, others include it if the blinds are ordered through them,
  • removing old shading: taking down old blinds and covering old holes is extra work,
  • motorised operation: motorised roller blinds need a power supply. That is electrical work which, under national rules, only a qualified, licensed electrician may carry out.

Fitting is often ordered together with window replacement or windowsills. Related work is covered in the articles on fitting a uPVC or timber window and on fitting an internal windowsill.

What should be ready

  • the shading is ordered to exact measurements and it is clear who is buying it,
  • it is agreed whether it goes on the sash, inside the reveal, on the wall or on the ceiling,
  • the control side and the length of the cord or chain are known,
  • windowsills are clear, plant pots and net curtains are out of the way and the windows can be reached with a ladder,
  • for wall fitting, it is clear where cables run in the wall so that nobody drills into them,
  • with new windows, the windows are installed and the reveals plastered and painted.

Typical mistakes and how they show up later

Wrong measurements

A sash-mounted blind that is wider than the space between the glazing beads cannot be fitted. A narrower one leaves gaps at the sides where light gets through. If you measure in only one place, it is easy to miss that the window is not the same width at the top and bottom.

Screws in the sash frame

A screw outside the glazing bead damages the window sash. The holes in the frame remain visible even after the blind is removed.

Stripped screws

A screw driven fully home with a cordless screwdriver loses its thread in the plastic bead. Over time the blind works loose and the top rail sags.

The window will not open fully

A roller blind cassette is deeper than the top rail of a venetian blind. If the sash is close to the reveal, it hits the wall. One manufacturer of sash-mounted roller blinds states that opening the window to 90 degrees needs at least 40 mm between the sash and the reveal, and 65 to 70 mm for some no-drill roller blinds.

No side guides

A venetian or pleated blind without tensioned guide lines comes away from the glass when the window is tilted and swings when you air the room.

Long cord or loose loop

A cord hanging down to the floor and a loop without a tensioner are dangerous around children. Manufacturers state that loose cords should end at least 150 cm above the floor.

Roller blind above the window without overlap

A roller blind exactly the width of the opening will not black out the room. Light gets through at the sides and above the blind, and in a bedroom you will notice it on the very first evening.

How to check the finished job

  • the shading moves up and down smoothly, does not jam and stays in any position,
  • the top rail is level and does not sag, and the blind sits against the glass,
  • the slats tilt evenly and, when closed, no more light shows between them on one side,
  • the window can be opened and tilted and the handle turns without catching,
  • a wall-mounted roller blind overlaps at the sides and the top and does not get in the way when the window is opened,
  • the controls are the right length, on the agreed side and have a safety connector or tensioner,
  • there are no unnecessary holes around the window and the trimmed ends of the guide lines are tucked into the bead.

DIY guide: what to watch out for

A handy amateur can fit a single blind to a window sash, and manufacturers supply fitting instructions. The key points are:

  1. Measure the window following the specific manufacturer's instructions, in three places, and order using the smallest figure.
  2. On a uPVC window, screw only into the glazing bead and use the screws supplied.
  3. Tighten screws by hand or with a low torque setting on the screwdriver.
  4. With a no-drill roller blind, check before ordering that the window opens fully with the brackets in place.
  5. With adhesive brackets, clean and degrease the window first.
  6. Shorten the operating cord to a safe length and fit the tensioner or safety device if supplied.

For large wall-mounted roller blinds, drilling into concrete and motorised shading, it is better to call a fitter. Powering the motor is a job for a qualified, licensed electrician.

Frequently asked questions

The guide price for labour is €45.00 per piece, excluding the price of the venetian blind, pleated blind or roller blind itself. The price goes up for wall fitting into concrete, non-standard windows, removing old shading and motorised operation.

Related work

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.