Building work price list: Installation of Bespoke Window Finishes for Curtains or LED Strips
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Plasterboard finishing cost | ||||
| Bespoke termination for LED strip / curtain track | lm | €24.00 / lm | lm | enter quantity- |
| Plasterboard corner beads | lm | €2.50 / lm | lm | enter quantity- |
| Applying acrylic sealant to plasterboard joints and corners | lm | €1.10 / lm | lm | enter quantity- |
| Access hatches | pcs | €45.00 / pcs | pcs | enter quantity- |
| Cut-outs for light fittings in plasterboard | pcs | €11.50 / pcs | pcs | enter quantity- |
| Door frame reinforcement in plasterboard partition with UA profiles | pcs | pcs | - | |
| Plasterboard niches and shelving | pcs | pcs | - | |
Concealed curtain track and a line of light in the ceiling: when it makes sense
This is a detail in a plasterboard ceiling or suspended ceiling that later hides a ceiling-fixed curtain track, an aluminium LED profile, or both. Homeowners usually ask for it when they do not want a visible pole and brackets above the window. They want the curtain to drop straight from the ceiling, or a soft line of light along the ceiling. It is easiest to build with a new ceiling, but it can also be added to a finished room.
This article covers the plasterboard part of the job: forming the shape that the hardware fits into. It is one of the more detailed tasks within plasterboard work. The dryliner builds a drop or recess from metal sections and boards, reinforces the area for the track, finishes the edges, sets an aluminium LED profile flush with the board face if required, and fills everything to a smooth finish.
The LED strips, driver, cabling and the track with its curtains are usually separate items. Before placing an order, check exactly what the quote includes. This avoids later disputes about who supplies the profile or who runs the cable.
The electrical work, meaning the supply, switch, dimmer and driver connection, should be carried out by a qualified electrician. The dryliner only prepares the cable route and openings.
Curtain recess in plasterboard, concealed LED strip or a combination
Curtain recess
This is a recessed strip in the ceiling running along the window, with a ceiling-fixed track inside it. The curtain then hangs directly from the ceiling and the track is out of sight. The width of the recess depends on the number of tracks. A single curtain needs a narrower recess. A combination of a sheer and a blackout curtain needs a wider one, so the fabrics do not rub against each other, the wall or the window handle. Allow roughly 10 to 20 cm, but the exact dimension depends on the track type.
Slot or step for an LED strip
In this option, an aluminium profile with a diffuser is either set into the ceiling flush with the surface, or a step is formed so that indirect light washes onto the ceiling or wall from behind it. A flush profile reads as a thin line of light. A step gives softer light with no visible source.
Curtain and light combined
A popular choice is a recess with the track at the back and an LED strip at the front edge lighting the curtain. The light shows off the fabric well, but this is the most demanding detail. Dimensions, the distance between light and fabric, and access to the driver all have to be coordinated.
Adding it to a finished room
The method depends on the existing ceiling. With a concrete or plastered ceiling, a local plasterboard drop is built above the window and the recess is formed within it. If the room already has a plasterboard suspended ceiling with enough void above, the recess or slot can be cut straight into it. The ceiling level then stays the same, but extra framing and reinforcement must be added around the cut-out, because the cut sections lose their strength. This is similar in principle to forming shelves, niches or other recesses in plasterboard. The repaired area is then filled, and the whole ceiling is usually repainted so no colour difference shows.
What to decide before work starts
Most problems with this detail come from decisions made too late. Plasterboard can be built to the millimetre, but only when it is clear what will go into it. Before the dryliner arrives, the following should be settled:
- Track type and number of runs: a single curtain track, a double track for sheer and blackout, or a motorised track. This sets the width of the recess and how strong the reinforcement needs to be.
- Curtain weight: a light sheer and a heavy blackout or acoustic curtain place very different demands on the fixings.
- Clearance from the window: the curtain must not stop the sash opening or tilting. At the survey, open and tilt the window and check where the frame, handle and top of the tilted sash reach.
- The specific LED profile: its width and depth determine the slot. A flush profile must be chosen before boarding, not at the decorating stage.
- The lighting effect wanted: a direct line of light, indirect light onto the ceiling, or light onto the curtain. Each one needs a different shape.
- Driver location: LED strips normally run at low voltage, 12 or 24 V, and the driver converts this from mains voltage. The driver gets warm in use, so it must not be shut inside insulation with no airflow. It must stay accessible, so agree in advance on an access hatch, a ventilated cover or a position outside the ceiling.
- Controls: a simple switch, a dimmer or control for a motorised track. The electrician plans the supply accordingly.
- Length and route: whether the recess runs wall to wall, only above the window, around a corner or across several windows.
- How far the ceiling can drop: with a local drop, the strip above the window will be lower than the rest of the ceiling.
The price is quoted per running metre, based on the length of the finish. When comparing quotes, ask how the length is measured, whether corners and end returns are charged separately, and whether reinforcement and setting in the LED profile are included.
In a block of flats, normal fixings into the ceiling above your flat do not usually need to be discussed with the managing agent. However, if the work would affect the structure, for example chasing into a concrete floor slab, speak to the freeholder or managing agent beforehand and check the terms of your lease. Only a competent professional should work on structural elements, and only with consent.
How the recess or slot is installed step by step
- Survey the window, ceiling and walls, check levels and the position of existing services.
- Agree the exact dimensions of the recess or slot with the client, based on the chosen track and LED profile.
- Mark the line with a laser along the full length of the window, ideally wall to wall.
- Build the framing from metal track and channel sections (UD and CD profiles) and fit reinforcement at the track position, fixed back to the structural ceiling.
- Prepare the cable route, the driver position and an access hatch so the electrician can run cables before boarding. Any openings for downlights or speakers nearby are best planned at this point too, see cutting holes for luminaires and speakers up to 15 cm.
- Fix the boards, cut strips for the faces and soffits of the recess, and fit corner beads to the edges.
- Set in and level the aluminium LED profile if it forms part of the design.
- Fill the joints, tape the corners, sand and prepare the surface for painting.
- After decorating, fit the track and LED strip, then test the curtain movement and lighting.
Why is the LED strip fitted last? Sanding dust and paint would damage it or dirty the diffuser. The profile and cables must be in place earlier, otherwise the finished ceiling would have to be opened up.
The filler must dry between filling and sanding. If the edges need several coats to get them true, the work can stretch over several days, even though building the framing itself takes less time.
What affects the price
The guide labour price is €24.00 per running metre. The actual cost will vary depending on how complex the detail is and the condition of the ceiling.
- New ceiling or existing ceiling: it is cheapest to form the finish at the same time as a new ceiling. The framing is simply adapted, reinforcement goes in straight away and nothing has to be removed. Adding it to an existing ceiling that must be partly stripped, cut or locally dropped takes much more work, and the surrounding area needs making good.
- Ceiling flatness: a flat ceiling speeds up the work. An uneven ceiling means the line has to be trued up, otherwise the light will show every fault. This adds time and materials.
- Shape and route of the line: one window across a whole wall in a straight run with no corners is simplest. A recess around a corner, a bay or across several windows with piers between them means many cuts, corners and beads, so the price per metre rises.
- Type of detail: a simple curtain recess takes the least work. A flush LED profile needs precise levelling with the ceiling. A combination of curtain and light, possibly with a motorised track and its own supply, is the most demanding.
- Obstructions in the ceiling: in blocks of flats with precast concrete floors, fixing above the window can be limited by hollow cores in the slabs, their reinforcement and services running through the ceiling. Finding safe fixing points and adapting the reinforcement adds work.
- Room height and access: a typical room can be done from steps or a small platform. High spaces, galleries or windows above a staircase need a scaffold tower.
- Length: a short run above a single window costs more per metre, because setting out, surveying and filling the ends take about as long as on a longer run.
- What is included: the LED strip, profile, driver, track and electrician's work are usually separate. If a quote includes them, compare total prices, not just the rate per metre.
What makes the job easier and what slows it down
- Products chosen in advance: choose the track and LED profile before work starts and give the data sheets to both the dryliner and the electrician. If dimensions are only fixed during installation, work stops.
- Coordinated timing with the electrician: the electrician needs to come after the framing is up and before boarding. If no date is booked, the dryliner has to wait or return, which drags out the whole job.
- Clear space at the window: old curtain poles and brackets removed, furniture moved and room for steps or a scaffold tower.
- Protection of the window and sill: sanding produces fine dust. If the windows and sills are new, agree in advance how they will be covered.
- Temperature and ventilation: filler dries more slowly in cold, damp conditions. In an unheated property in winter, drying time between coats increases.
- Decorating schedule: the track and LED strip are fitted only after painting. If the decorator is late, final fitting is delayed.
Typical mistakes with curtain recesses and LED strips and how they show up later
- The track is screwed only into plasterboard. The board alone cannot carry a heavier curtain long term. The load must be taken by reinforcement fixed to the structural ceiling, as with reinforcing a door opening in a stud partition. The fault appears gradually: screws loosen, the track sags, the filler cracks around it and in the worst case it pulls out with a piece of board.
- The recess is too narrow or too close to the window. The curtain then rubs against the wall, handle or sill, and two layers snag on each other. If the track is too close to the frame, the curtain gets in the way when the sash opens or catches when it tilts. Fixing this means rebuilding the whole detail.
- The LED strip is stuck straight onto the plasterboard without a profile. It overheats, loses brightness faster and individual LEDs are visible. The adhesive gradually fails and the strip hangs out of the slot.
- The driver is boarded over with no access. If it fails, the ceiling has to be opened, repaired and repainted. If the driver is sealed in with no airflow, it overheats and fails sooner.
- The line follows an uneven ceiling instead of a laser. A line of light exaggerates every wave. It may not show in daylight, but once the LED strip is on, the fault is obvious.
- Dimensions are fixed only after completion. It often happens that the track or profile is bought later and does not fit the prepared recess. The only options are to find a different product or alter the recess.
- A cut-out in an existing ceiling with no added framing. The cut sections do not support the edges of the opening, the board sags around the recess and the joints crack.
- Edges without corner beads. The sharp edges of the recess are easily knocked when hanging curtains or cleaning, and cracks appear over time.
How to check the finished recess or slot at handover
Some things can only be checked before boarding, so inspection starts during the work. At final handover, look at the ceiling from the side, ideally with a light on or a torch held close to the surface. This shows up unevenness best.
- before boarding, you saw the track reinforcement fixed to the structural ceiling and photographed it along with the cable route, so you know where they are when drilling later,
- the line of the recess or slot is straight along its full length and does not follow waves in the ceiling,
- edges are sharp and clean, with no dented corners or visible beads,
- joints are filled with no cracks, bubbles or sanding marks,
- the width and depth of the recess match the agreed track and profile dimensions,
- the window opens and tilts without the sash touching the curtain,
- the LED profile is flush with the ceiling and the diffuser can be removed,
- the driver is accessible through an access hatch or cover and is not sealed in insulation,
- the curtain runs smoothly and does not rub anywhere,
- the light is even, with no dark patches or visible dots,
- the window, sill and surrounding walls are free of filler and dust.
Frequently asked questions
The guide labour price is €24.00 per running metre. Expect to pay more when adding it to an existing ceiling, with an uneven ceiling, with corners and several windows, and when combining a curtain with lighting. The LED strip, driver, track and electrician's work are usually separate items.
Yes. With a concrete or plastered ceiling, a local plasterboard drop is usually built above the window, so the ceiling is slightly lower in that area, which is not a problem in most rooms. If there is already a plasterboard ceiling with a void above it, the recess or slot can be cut directly into it and the ceiling level stays the same. If neither dropping nor cutting is acceptable, a compromise is a surface-mounted profile on the ceiling.
Not the board on its own. Heavy curtains and a motorised track can only be supported when there is reinforcement behind the board fixed to the structural ceiling. Tell the installer in advance what curtain is planned so the reinforcement can be sized accordingly.
Before boarding, to run the supply and decide the driver position. At the end, the electrician connects the strip, switch or dimmer. Any work on mains voltage should be done by a qualified electrician.
If the light is to fall on fabric, a strip with good colour rendering is worthwhile, usually with a CRI of around 90 or higher, and with dimming. Warm white is the most common choice for living spaces. Always fit it in an aluminium profile with a diffuser.
Not if the survey checks how far the open and tilted sash and the handle reach. The distance between the track and the frame is set accordingly. With a double track, also check that the inner layer of fabric does not catch on the tilted sash.
In most cases, yes. A wall-to-wall line looks clean and the curtain can be drawn fully clear of the window. A recess only above the window is shorter, but its ends are visible on the ceiling and the curtain stacks into a narrower space.
Related work
How a door opening in a plasterboard partition is reinforced with UA profiles, what to watch out for and how to check the finished work.
How a niche or built-in shelf is made in a plasterboard wall, what decides how much it can hold, and what to watch for in bathrooms and with lighting.
How holes for downlights, speakers and boxes are marked out and cut in plasterboard, what to watch out for and how to check the finished work.
What do stud walls, wall linings and suspended ceilings cost per m² in 2026? Labour price list for plasterboard work and a quick estimate in NUMIQ.
How a single layer plasterboard partition is built, when it is enough, what makes the job harder and how to check the finished wall.
How a flat gypsum board ceiling or suspended ceiling is installed, which boards to choose, what makes the job harder and how to check the result.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.