Building work price list: Installation of External Window Sills with Reinforcement Strips
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Window sills cost | ||||
| Window sill flashing | lm | €16.00 / lm | lm | enter quantity- |
What a sill flashing is and when you need one
An external sill, or sill flashing, covers the bottom of the window opening on the outside. It collects rainwater running down the window and sheds it away from the frame and the facade. You need one on a new build, when external wall insulation is fitted, when windows are replaced, or when an old sill sags, rusts or the render below the window turns damp.
The area under a window is sensitive because the window frame, the masonry and the insulation all meet here. If water gets in, you will not see it straight away. Damp patches on the reveal or flaking render below the window appear later, often only after the water in the wall has frozen several times.
A correctly fitted sill does several things at once:
- sheds water clear of the facade through the drip edge,
- protects the window installation joint from moisture and frost,
- stops water getting into the insulation,
- closes off the bottom of the opening and finishes the look of the window.
Waterproofing under the sill: why reinforcement strips are bonded in
Why is the metal not simply laid on the masonry or bedded in mortar? Water always finds a way under a sill, whether through the joint at the end cap, through a fixing, or driven under the frame by wind. That is why reinforcement strips are bonded in first. This sealing layer bridges the junction between frame, masonry and insulation and forms a continuous watertight surface before the sill goes on. The metal is then the visible top layer of protection. If water gets underneath it, the strips keep it out of the structure and lead it outside.
The usual options for waterproofing under the sill are:
- self-adhesive waterproofing tapes, often butyl, applied to a primed substrate and joined directly to the window frame,
- liquid waterproofing, a membrane applied by brush or roller, with reinforcing fabric or tape embedded at corners and junctions,
- system strips from the insulation system or window manufacturer, matched to the adhesive and sealants of the same system.
The weakest points are the bottom corners of the opening. Here the strips are not just cut straight - cut corner pieces or preformed corners are fitted and the pieces overlap. The rule is simple: the higher piece always laps over the lower one, so water runs over the joint and not into it. The strips are also turned up into the side reveals so water cannot run round the edge.
What to decide before you place an order
Most problems with sills do not come from the fitting itself but from a poor decision or a wrong measurement. It pays to be clear on these points:
- When the sills will go in: usually after the insulation, but before the final render. Fitted too early, the metal is easily damaged by work from the scaffold. Fitted too late, the finished facade has to be cut into.
- How thick the insulation will be: this sets the sill depth, meaning how far it projects in front of the window. Depth is measured from the frame to the face of the finished facade plus the overhang. Sill length is set by the width of the opening between the reveals.
- How the window is finished at the bottom: whether the frame has a sill adaptor profile or a groove into which the back edge of the sill slides and is fixed. This needs to be known when the windows are ordered.
- Who is responsible for the junction with the frame: the window fitter often seals the installation joint on the outside, while the strips and sill are done by the sheet metal installer or the rendering contractor. Agree in advance who does which detail and who answers for it, so responsibility is not passed around if water gets in.
- Guarantee: have the workmanship guarantee stated in writing in the contract or on the invoice, together with exactly what it covers.
- Material and colour: aluminium, coated steel, PVC or stone. Each has different demands on the substrate and fixing.
- What happens to the old sills: who removes and disposes of them and whether this is included in the quote.
Aluminium, steel, PVC or stone: which to choose
Extruded aluminium sills are now common on new builds and insulation projects. They hold their shape, have a ready-made drip edge and need no painting. They do expand more with heat, which must be allowed for on longer lengths, for example with expansion joints and end caps that let the metal move.
Galvanised and coated steel is folded to size in a sheet metal workshop. It suits non-standard windows, bays and arches. The coating resists sunlight and scratching better, but service life is usually shorter than with aluminium.
PVC sills are light and easy to work. Frost and sunlight gradually make them brittle and the colour fades. On longer windows they need closer support so they do not sag.
Stone and concrete sills are chosen for older buildings or where appearance and long life matter. They are heavy, need a solid base and are harder to set.
If you live in a block of flats, check the colour and profile of the sills with the managing agent, freeholder or residents' management company first, so the facade stays uniform. The facade is usually part of the common parts of the building, so any work on it needs prior approval. Residential permitted development rights only apply to houses, so for larger changes to the look of the facade of a flat, also ask the local council whether planning permission is needed. Listed buildings and conservation areas have stricter rules.
How the installer works step by step
The sequence is fixed and each step depends on the quality of the one before. There is no UK national workmanship standard for external wall insulation, so the work follows the installation instructions of the insulation system manufacturer. If your external wall insulation is grant-funded, the installer must be certified to PAS 2030:2023 and registered with TrustMark, and the system should hold a third-party certificate (e.g. BBA). Sills are part of wider sheet metal works on a building.
- Removing the old sill: any existing sill is taken off carefully so the window frame and surrounding insulation are not damaged.
- Cleaning the substrate: dust, mortar and old adhesive are removed and the surface is left to dry.
- Fall: the surface is checked for level and a fall is formed away from the window, at least 5°. This is done with adhesive, mortar or an insulation wedge, depending on the system.
- Measuring: the width of the opening between reveals and the depth from the frame to the face of the finished insulation, including the overhang, are measured. Measuring from the bare masonry is a mistake.
- Primer and reinforcement strips: the substrate is primed and the strips are bonded over the full area, with no bubbles or creases. Corner pieces go in, the strips are turned up into the side reveals and joined to the window frame.
- Supports for deep sills: on larger projections, fixing clips or brackets are fitted to support the metal from below so it does not sag.
- Sound-deadening layer: anti-drumming tape is applied under the metal, or the sill is bedded in adhesive so it sits fully on the base and does not drum in the rain.
- Setting and fixing the sill: the upturned back edge slides under the window frame or into the sill adaptor profile and is screwed to it. Never fix through the surface water runs over.
- Expansion and end caps: on longer lengths, room is left for movement or expansion joints are used. End caps are set in sealant or adhesive and the junction with the reveal is checked.
- Water test: water is poured onto the sill to check that it runs to the drip edge and does not pond anywhere.
The fall is critical. Without it, water sits on the sill and is pushed under the frame, and no later step can fix that. The overhang beyond the face of the facade is usually at least 30 mm, and on exposed elevations a little more works better in practice.
The protective film shields the metal during facade work, but in the sun it bonds over time and becomes hard to remove. Manufacturers typically say it should be peeled off within a few weeks of fitting. If the facade work runs longer, remove the film as the manufacturer instructs and protect the metal another way during rendering, for example by covering it.
Price per running metre and what affects it
The guide labour price is €16.00 per running metre. Check in the price list item and the installer's quote whether the sill itself and the strips are included. Work is charged by sill length in running metres, so the number and width of windows matter. The final figure then moves with these factors:
- Sill depth: deeper sills on thick insulation need supports, more strip and a more precise fall. The rate per running metre is noticeably higher than for shallow sills.
- Condition of the substrate: an uneven, crumbling or damp base has to be repaired and dried first. If there is no fall at all and it must be formed from scratch, there is more work and drying time.
- Removing the old sills: stripping out old metal, stone or concrete and taking away the waste is often charged separately. A stone or built-in sill is much more work.
- Height and access: work from scaffolding or a mobile platform is slower. If no scaffold is up for the facade, hiring one or a platform can cost more than the materials. Where scaffolding is already planned, for example for a roof replacement, sharing it saves money.
- Window shape: bays, arches, raked and non-standard openings take longer to make and fit. The metal is folded to size and built up from several pieces.
- Material: PVC and galvanised steel are among the cheaper options, aluminium is usually dearer, and stone is the most expensive and, because of its weight, the hardest to set.
- Number of identical windows: many windows of the same size make the work more efficient and the rate per running metre can drop.
When comparing quotes, check whether the sills are priced as a separate item and whether they include reinforcement strips, forming the fall, anti-drumming tape and end caps. Removal of the old sills, XPS reveal boards around the window and scaffolding are also often forgotten. If a quote leaves out the strips, it is not the same job and the prices cannot be compared directly.
What makes the work easier and what slows it down
The installer works quickly and cleanly when the site is ready. The customer can help mainly through organisation:
- Windows fitted and the installation joint finished: the sill joins the frame, so the window must be fully fixed and foamed in.
- Insulation finished, at least around the windows: otherwise the depth cannot be measured accurately and the sill may end up too short.
- Scaffolding still up: if the sills are planned with the facade, coordinate dates with the rendering contractor so the scaffold is not put up twice. The same applies to facades with angle standing seam facade cladding, where the sill detail has to suit the cladding.
- Material and colour chosen in advance: aluminium and folded steel are made to order, so do not leave the order to the last minute.
- Weather: adhesives, strips and sealants need a dry substrate and at least +5 °C unless the manufacturer states otherwise. Rain or frost will delay the work.
- Access to the windows from inside: it helps to keep the area by the windows clear so the fit under the frame and the fixing to the profile can be checked.
- Agreed waste removal: someone has to take away the old metal and stone, and it is best to know who in advance. Before you hand over the waste, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
Mistakes that show up after the winter
Little or no fall. Water ponds, wicks under the frame and the reveal gets damp. Dirt collects on the surface and leaves stains.
Reinforcement strips left out. Water has a direct route into the joint and insulation. The insulation below the window soaks up water, freezes in winter and the render starts to flake.
Poorly formed corners and strips not turned up into the reveals. Water runs round the edge of the strip or into a badly lapped joint and leaks into the reveal, typically at the bottom corner of the window.
Short overhang. Water runs down the render, which stains and flakes below the window.
Rigid fixing with no allowance for expansion. The metal buckles, cracks and works loose with temperature changes, especially on long aluminium lengths.
Fixings through the sill surface. Every screw in a surface that water runs over is a future hole for leaks.
Deep sill without supports. Over time the metal sags, a dip forms in the middle and water sits in it.
End caps fitted dry. They work loose during the first winter and water runs into the reveal.
No anti-drumming tape under the metal. Raindrops drum loudly, which is especially annoying in a bedroom.
Sill ordered on an estimate before the insulation went on. After insulating it is too short and a new one has to be waited for.
Repairing a wet reveal means removing the sill, drying out the substrate and making good the facade. That costs far more than getting the detail right the first time.
How to check the finished sill
The most important part of the work, the reinforcement strips, cannot be seen once the metal is fitted. So they are checked during the work, and everything else at handover:
- you have photos of the bonded strips before the sill covers them, including corners and the turn-up into the reveals,
- water poured on the sill runs away from the window by itself and does not pond anywhere,
- the drip edge projects beyond the facade and water does not run down the render,
- the back edge is slid under the frame or into the profile, firmly fixed and the joint is tight,
- there are no screws or holes in the sill surface,
- the end caps are firmly bonded and sealed,
- the metal does not buckle, sag or move and does not rattle when tapped,
- the surface is not scratched or dented,
- the protective film has been removed,
- the workmanship guarantee is given in writing.
DIY guide: replacing a ground-floor sill
You can manage one or two ground-floor windows yourself, working from the ground or a low, stable platform. For upper floors and whole facades, call in an installer. In a block of flats, do not touch the facade without approval from the managing agent, freeholder or management company. The method is the same as the installer's above, but when doing it yourself pay particular attention to these points:
- Buy strips, primer, adhesive and sealant from one system or as the manufacturer recommends, rather than mixing random products. If the opening has a different waterproofing detail nearby, such as a single-layer torch-on bitumen membrane on vertical surfaces, check that the products are compatible.
- Protect the frame when removing the old sill, for example by putting a timber batten under the pry bar.
- Check the fall with a spirit level or angle finder before bonding the strips, as it cannot be corrected later.
- Dry-fit the strip corners first, cut the corner pieces and only then bond them, always higher piece over lower.
- Offer up the sill before fixing and check the depth and overhang, then bed it in adhesive.
- Fix the back edge to the window profile and do not drill into the sill surface.
- Photograph the strips before covering them and finish with a water test.
Frequently asked questions
The guide price is €16.00 per running metre. The final figure depends on sill depth, material, the condition of the substrate, removing the old sills, window shape and whether scaffolding or a platform is needed. Also check whether the quote includes materials.
For a professional installation, yes. The strips bridge the junction between frame, masonry and insulation and stop water that gets under the metal from leaking into the structure.
At least 5° away from the window. With a shallower slope, water and dirt sit on the surface and water can be pushed under the frame.
Usually there is no anti-drumming tape under the metal or the sill is not sitting on the base. Often it helps to foam or bond the underside afterwards without removing it. If large areas are not in contact or the sill is bent, it usually has to be lifted and refitted.
Usually after the insulation and before the final render. The sill depth is measured only once the finished insulation thickness is known.
They cannot be seen once the metal is on. Agree with the installer that they will show you or photograph the bonded strips, including corners and reveals, before the sill is fitted. Keep the photos with your building records, as they help with any complaint.
First consult the managing agent, freeholder or residents' management company, as the sills are part of the look of the facade. For larger changes, also check with the local council what applies.
Related work
What a roof replacement costs: stripping, checking the roof structure, underlay, tiles or metal, flashings, asbestos cement and a 150 m² labour example.
Price list for sheet metal works in 2026: gutters and downpipes, chimney flashing, sills, cappings and metal roofs. What drives the cost and a NUMIQ estimate.
How torch-on bitumen membrane goes on basement walls and parapets: substrate prep, top termination, laps, corners, mistakes and checks before backfill.
How angle standing seam metal facade cladding is installed, which metals are used, what makes the job harder and how to check the finished work.
How eaves guttering is fitted: brackets, fall, joints, outlet and water test. What to consider when choosing materials and checking the finished work.
How a downpipe is fitted, which material and size to choose, where the rainwater should go and what to watch with brackets and pipe joints.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.