Building work price list: Angle Standing Seam Facade Cladding
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Roofs and coverings cost | ||||
| Cladding facade - standing seam | m² | €20.00 / m² | m² | enter quantity- |
| Timber roof truss installation (load-bearing structure) | m² | m² | - | |
| Install battening for tiled roof | m² | m² | - | |
| Install counter-battening | m² | €3.90 / m² | m² | enter quantity- |
| Install vapour barrier | m² | €2.90 / m² | m² | enter quantity- |
| Lock seam / standing seam metal roof covering | m² | €19.00 / m² | m² | enter quantity- |
| Install PVC waterproofing membrane (flat roof) | m² | m² | - | |
| Spark test PVC membrane (flat roof) | m² | m² | - | |
| Lay ceramic/concrete tile covering | m² | €30.00 / m² | m² | enter quantity- |
What standing seam facade cladding is and when it is used
A sheet metal installer covers the wall with metal strips, or trays, and folds their edges into each other without screws or sealant. Homeowners choose this cladding for new houses with contemporary architecture, for set-back top storeys on blocks of flats, or for refurbishments where an uneven old wall needs to be hidden. The main advantages are a long service life and little maintenance. It is often installed with a roof in the same metal, so the building looks consistent from eaves to plinth. For a wider view of related trades, see the overview of sheet metal works.
How an angle standing seam works
Each metal tray has upstands along both long edges. Neighbouring upstands are placed side by side and folded over together at an angle. This forms a vertical rib, which appears on the facade as a thin, distinctive line. The joint is called a seam. The tray is held to the substrate by hidden metal clips that sit inside the seam, so the face of the metal is never drilled. The only weak points are the details around windows, corners and penetrations, and the seams themselves if they are not properly closed.
Why an angle seam rather than a double lock seam? With a double lock standing seam the edges are folded twice. The joint is tighter and better suited to low-pitch roofs, where water sits for longer. On a vertical wall water runs off quickly, so an angle seam is sufficient. It is faster to form and gives a clean look.
There are also click-fit systems, where pre-formed panel edges simply snap together. Installation is quicker on large flat areas. On a complex facade with many windows and corners, however, a traditionally seamed system remains more precise.
The metal never sits directly on the masonry. This is a ventilated rainscreen facade, with an air gap between the insulation and the metal. Air rises through the gap like a chimney and carries moisture away. The wall stays dry and the risk of mould falls. Thin sheet metal also needs continuous boarding behind it. On battens alone it would dent and ripple. The metal therefore acts as a rain shield, not as insulation or a structural layer.
Decisions to make before the installer starts
Metal cladding is difficult to change once it is fitted. Most decisions should therefore be made at the design and ordering stage, not on the scaffold.
- Type of metal and colour: these affect appearance, service life and lead time. Titanium zinc and some colours of pre-coated steel take longer to arrive, so order early and allow for this in the programme.
- Tray width and direction: narrower trays look finer and fit better around windows. Wider trays look calmer but show unevenness more. Tray width and seam positions are set out in a setting-out drawing, which should be requested and approved.
- Windows and their position: if the facade is being insulated, decide whether the windows stay where they are or move outwards into the insulation zone. This determines reveal depth and sill shape.
- Build-up behind the metal: whether insulation is added and how thick, whether the subframe is timber or metal, what the boarding is made of, and who supplies the insulation and membrane. The quotation should state clearly what is included.
- Fixtures on the facade: lights, sockets, cameras, doorbell, air conditioning outdoor units, satellite dish, vents. Their positions are fixed in advance so the installer can prepare proprietary penetration details. Cables should be moved and connected only by a qualified electrician. A new circuit, for example for facade lights or outdoor sockets, is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts.
- Roof now or later: if a new roof is planned too, it pays to do both jobs together, in the same metal and from one scaffold. On a tiled roof the related work would include installing roof battens for tiled roofs.
- Permissions and consents: where the appearance of the house changes, in a conservation area, for a listed building or when insulation is added at the same time, check the requirements with the local planning authority and building control. Check the Planning Portal before you start: many alterations to houses are permitted development, but you may still need building regulations approval, and flats, listed buildings and conservation areas have stricter rules. In Scotland, changes to external walls need a building warrant from the council before work starts. In a block of flats the facade is usually a shared part of the building, and the decision rests with the freeholder, managing agent or management company.
Installation step by step
- Survey and setting-out drawing: the installer measures the walls and draws where each tray will go, so the seams run symmetrically to windows and corners.
- Wall preparation: old flashings, brackets and fixtures that would be in the way are removed, and the masonry is checked for sufficient strength to take fixings. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Brackets: brackets are fixed into the masonry and will later carry the whole system.
- Thermal insulation: insulation, usually non-combustible mineral wool, is fitted between and around the brackets and fixed to the wall. In England it must currently meet Approved Document L (2021 edition); the new 2026 edition (Future Homes Standard) takes effect on 24 March 2027.
- Facade membrane: a vapour-permeable breather membrane is laid over the insulation to protect it from wind and moisture. It does a different job from a vapour barrier, which belongs on the warm, inner side of a construction.
- Subframe: a timber or metal subframe is fixed to the brackets to true up the wall and create the ventilated cavity, much like counter battens on a roof.
- Ventilated cavity: typically 20 to 40 mm, with open inlets at the plinth and outlets at the parapet. The openings are protected with mesh against insects and birds.
- Continuous boarding: boards or a suitable structural sheet, as specified by the metal manufacturer, are fixed to the subframe. They form a firm, flat base into which the clips are fixed.
- Separation mat: for titanium zinc, and for other metals where the manufacturer requires it, a structured underlay mat is laid over the boarding. It separates the metal from the timber and allows the underside of the metal to dry out.
- Trays and clips: each tray is engaged in clips that hold it without drilling. On long trays fixed and sliding clips are combined so the metal can expand.
- Closing the seam: with a seaming machine on long runs, and with hand tools at corners and details.
- Details: parapet cappings, window sills, reveals, plinth and penetrations are formed with proprietary components.
- Completion: the protective film is peeled off, offcuts and metal swarf are removed, and the facade is inspected together with the client.
Which metal and when
- Pre-coated galvanised steel: the common and affordable choice. For facades a higher-grade coating with better UV resistance is worthwhile, otherwise the colour may fade on the south elevation over time. Service life depends mainly on the quality of the coating and the environment.
- Aluminium: lightweight, so suitable for refurbishments where the wall cannot carry much load. It expands more than steel with temperature changes, so correct allowance for movement matters even more.
- Titanium zinc: develops a grey protective patina over time, minor scratches blend into it and it needs no painting. In a suitable environment and when installed correctly it typically lasts more than 50 years.
- Copper and stainless steel: very durable and striking, but used on houses only occasionally.
Facade sheet is usually 0.6 to 0.8 mm thick. Take care when combining metals: if water runs off copper onto galvanised steel, galvanic corrosion occurs and the steel deteriorates quickly, typically showing as rust streaks below the joint. Choose metals on one facade so that they are compatible. This also applies to sills, gutters and the roof above the facade.
What affects the price
The guide labour price is €20.00 per m². Two facades with the same area can, however, differ greatly in labour. A plain wall without openings is quick, as the seaming machine runs the full tray length in one pass. Every window, corner, recess or penetration for a vent or light means extra hand work.
- Complexity of the building: external corners, curves and set-back sections need precise forming. On a very complex house the labour per m² can be considerably higher than on a simple box.
- Number of windows: reveals and sills are among the most labour-intensive areas. Installers often price them separately per running metre, so when comparing quotations ask whether they are included in the rate per m².
- Building height: taller buildings need scaffolding, which is usually charged separately.
- Condition of the substrate: crooked old masonry needs more work to true up the subframe and longer brackets. Weak or crumbling masonry needs different anchors and more pull-out tests.
- Tray length: long trays, usually over 3 m depending on the manufacturer, also need sliding clips. Very long trays are harder to transport and need several people to handle.
- Type of metal: titanium zinc, copper and aluminium are more demanding and slower to work than standard pre-coated steel, which shows in the labour price as well as the material cost.
- Scope of supply: whether the rate per m² covers only the metal, or also the brackets, subframe, insulation, membrane, boarding and separation mat. Quotations can only be compared when they contain the same layers.
- Weather and season: metal is harder to form in frost and some details cannot be done, so winter installation takes longer or is postponed.
The area is measured in m² of wall. Ask how openings are measured and whether they are deducted, as the difference on a house with large windows is not negligible.
What makes the job easier and what slows it down
How well the site is prepared also matters. Installation runs smoothly when:
- windows and external doors are fitted and their position will not change,
- there is clear, firm ground around the house for scaffolding and for storing the trays, ideally dry and away from vehicle access,
- a power supply is available on site for the seaming machine and tools,
- the electrician has prepared the supplies for facade lights and sockets before installation,
- agreement with neighbours has been reached in advance if the scaffold needs access to their land.
The job is slowed down by late changes to the setting-out drawing, moving fixtures on the facade during installation, waiting for missing components, or other trades working from the same scaffold at the same time.
Typical mistakes and how they show later
The metal itself lasts a long time. Failures are almost always caused by installation that ignores how metal behaves.
No continuous boarding. If the tray rests only on subframe battens, the metal sags between them, dents easily and the surface looks wavy. The clips also have nothing firm to hold on to.
Only fixed clips on long trays. The metal expands in summer, has nowhere to go and the surface buckles, or the fixings pull out. The ripples show most in low-angle sunlight.
Too few clips. Their number should follow the wind exposure and building height, not the firm's habit. Otherwise there is a risk of damage in a storm, when the wind lifts and tears the metal off.
Blocked or missing ventilated cavity. Moisture stays in the construction and condenses on the insulation. It shows as damp masonry, mould or a musty smell indoors.
Titanium zinc without a separation mat. The underside of the metal cannot dry out and may corrode, which is not visible from outside for a long time.
Sealant instead of a proper detail. Sealant dries out and cracks. The joint should be solved by the shape of the metal, otherwise it will leak within a few years.
Seam not fully closed. A loose seam lets in wind-driven rain, and the metal may rattle in the wind.
Poor setting-out. A narrow tray at the corner of the facade cannot be corrected afterwards. Asymmetry around windows spoils the look of the whole house.
Sill without a drip. Water runs down the wall below the window and leaves streaks.
In practice it also happens that a firm has good references for roofs but is doing a facade for the first time. Ask about completed facades and go to see them in person.
How to check the finished facade
- seams are parallel, of equal height and closed along their full length, with no clips visible anywhere,
- viewed from the side, ideally in low-angle light, the surface is not wavy or dented,
- trays are positioned symmetrically to windows and corners according to the approved drawing,
- ventilation openings at the plinth and parapet are clear and protected with mesh,
- sills have a drip that throws water clear of the wall,
- corners and penetrations are formed with proprietary components, not sealant,
- there are no scratches, dents or remnants of protective film on the metal,
- no metal swarf or offcuts are left on the facade or around the house, as they could rust and stain the surface,
- during installation you were able to see the boarding and, for titanium zinc, the separation mat, or you have photos of each layer,
- you have received separate guarantees for the material and the workmanship, and documentation for the metal used.
This is work at height with professional tools, so it should be entrusted to an experienced sheet metal installer. No DIY instructions are given here.
Frequently asked questions
The guide price is €20.00 per m². The final price depends mainly on the complexity of the house, the number of windows, building height, condition of the masonry, the type of metal, and whether the subframe, boarding, insulation and window details are included.
Yes. On a vertical wall water runs off quickly and does not linger, so the angle seam is a common, proven solution here. A double lock seam makes more sense on low-pitch roofs.
Yes, this is common. The metal is not fixed into the insulation, however. It is carried by a subframe fixed through brackets into the masonry, with boarding on top. A ventilated cavity must remain between the insulation and the metal.
It depends on the area, complexity and weather. For a typical detached house without complications it is usually a few weeks of work. Add the lead time for the metal, which for titanium zinc and less common colours can be longer than the installation itself.
Usually not. Raindrops do not strike a vertical surface directly, and the insulation, subframe and boarding dampen the sound. It cannot be compared with a metal roof.
It depends on the scope of the work, whether the appearance of the house changes, whether the building is listed or in a conservation area, and whether insulation is being added at the same time. Check the requirements in advance on the Planning Portal and with the local planning authority and building control rather than assuming no consent is needed. Even where the work is permitted development, building regulations approval may still be required, and in Scotland changes to external walls need a building warrant before work starts.
Yes. The installer opens the seam, removes the tray and seams in a new one. The difficulty is usually the colour, as patinated or faded metal will not match a new tray exactly.
Related work
How roof battens for tiles are installed: setting out the gauge, batten size and treatment, fixing, typical mistakes and checks before tiling.
How a vapour barrier is fitted in a loft or plasterboard ceiling, which membrane to choose, how to seal joints and how to check the finished work.
How counter battens are fixed on a roof, what height to choose, what to prepare beforehand and what to check before the roofers move on.
How a sheet metal roofer lays a double standing seam roof, what roof build-up it needs, which metal to choose and how to check the finished work.
How a PVC membrane is fitted on a flat roof, when it can go over old felt, which mistakes cause leaks and how to check the finished work.
How a spark test finds leaks in a PVC flat roof membrane, when to book one, what the roof needs and how to check the test report.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.