Building work price list: Installation of Guttering and Gutter Brackets
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Gutters and downpipes cost | ||||
| Install guttering (eaves) | lm | €9.50 / lm | lm | enter quantity- |
| Install gutter bracket | pcs | pcs | - | |
| Install downpipe | lm | €9.00 / lm | lm | enter quantity- |
| Install downpipe clip | pcs | €3.50 / pcs | pcs | enter quantity- |
| Install gutter outlet | pcs | €12.00 / pcs | pcs | enter quantity- |
What eaves guttering is and when to deal with it
Eaves guttering is a horizontal channel hung just below the edge of the roof. It collects the water running off the roof covering and carries it to a downpipe. Without it, water would fall at the foot of the wall, soak the foundations and allow damp to rise into the walls. Splashing water and mud would also stain the plinth and the walls.
In the UK, eaves guttering on brackets is the standard arrangement on houses. It is visible, easy to clean, and if it blocks or gets damaged, water spills over the outer edge. With concealed or box gutters built into the roof, a fault can let water into the roof structure.
Guttering is usually installed in these situations:
- on a new roof, when the brackets are fixed before the roof covering goes on,
- during a roof replacement, when the roof is open anyway and the strongest type of bracket can be used,
- when the old gutter is rusting, leaking at the joints or sagging,
- when water overflows the gutter in heavy rain, stands in it or runs down the walls,
- when a garage, carport or porch is added that has no guttering yet.
What the guttering system consists of and what the price includes
Guttering is not just a length of channel. It works as a system, and each component has to fit the next one:
- gutter brackets, which carry the gutter and set its fall,
- the gutter itself with union joints,
- stop ends, which close the ends of the gutter,
- the outlet, through which water passes into the downpipe,
- internal and external angles, if the roof is not a simple pitched roof.
The price quoted is for labour, i.e. fitting one running metre of gutter including brackets. Materials are a separate part of the budget. When ordering, check exactly what the quote covers: whether materials are included, whether brackets, stop ends, outlets and angles are in the price per metre or listed separately, and whether downpipes, removal of the old gutter and waste disposal are included.
What to decide before installation
Most decisions are best made before the roofer or sheet metal worker orders the materials. Changing the size, colour or downpipe position later often means new materials and another visit.
Which gutter size to choose
The size is chosen not by appearance but by the roof area the gutter drains. What counts is the plan area, i.e. the roof seen from above, not the sloping area. Every manufacturer publishes a sizing table for this. On larger houses a 150 mm gutter is often used. On steep roofs water runs off faster, so it is worth going up one size.
How many downpipes and where
The number of downpipes is determined by the roof area and the manufacturer's table. A common rule of thumb is that the furthest point of the gutter should be no more than about 10 to 12 metres from a downpipe. On a long elevation the downpipe is therefore placed in the middle so water flows to it from both sides, or two downpipes are fitted at the ends. Fitting them is covered in more detail under installing rainwater downpipes.
The downpipe position also decides where the water goes next: to a drain, a soakaway, a water butt or tank, or onto the ground. A downpipe should not discharge in front of the entrance door, onto a path or onto a patio.
Galvanised steel, aluminium, copper or plastic
- Galvanised and coated steel is strong and copes well with snow.
- Aluminium is light and does not rust. It is softer, however, dents or bends easily if handled carelessly, and expands more with heat than steel. Joints and fixings must therefore follow the manufacturer's method exactly.
- Copper and zinc are chosen mostly for more demanding architecture or historic and listed buildings.
- Plastic (uPVC) is quiet and light and is widely used on houses, garages and outbuildings. It expands and contracts considerably with temperature. On shaded north-facing elevations in colder upland areas it is more vulnerable, because snow and ice load the gutter for long periods and plastic becomes more brittle in frost, so falling ice or heavy snow can damage it more easily.
Half-round or square profile
Half-round guttering is better at self-cleaning, as debris does not collect in corners. A square profile of the same width carries more water and suits modern houses, but needs more thorough cleaning. Choose the shape to suit the house, and the size to suit the roof area.
Types of brackets
Long rafter brackets are fixed to the rafters or battens before the roof covering is laid and are the strongest. Short fascia brackets are screwed to the fascia board, so they can also be fitted to a finished roof. Their load capacity depends on the condition of the fascia, which must be sound and straight. Rafter brackets cannot be fitted to a finished roof without partly stripping the covering. Always buy brackets from the same manufacturer as the gutter. A difference of a few millimetres in profile is enough for the gutter not to seat properly in the bracket.
Colour and accessories
Match the gutter colour to the downpipes, roof covering or windows before ordering, as some colours may not be in stock. If leaf guards, snow guards or a heating cable against freezing are planned, say so in advance. It affects the choice of components and the bracket spacing. A heating cable must be connected by a qualified electrician.
How installation works step by step
The order of the steps matters. If the outlet position or gutter length is sorted out only after the sections have been joined, several metres of the system often have to be taken apart.
- Measuring up: the installer measures the length of the eaves, checks the fascia board and marks the downpipe positions according to the agreed number.
- Removing the old system: any old gutter is removed together with its brackets, and the timber behind is checked for rot. In homes built before 2000, have suspect materials tested before you drill or demolish.
- First bracket: fixed at the highest point, usually at the end furthest from the downpipe.
- Calculating the drop: the gutter length in metres is multiplied by the chosen fall, usually 2 to 5 mm per metre. For 8 metres at 3 mm per metre this gives 24 mm.
- Last bracket and string line: the last bracket by the outlet is fixed lower by this amount, and a string line is pulled tight between the end brackets.
- Intermediate brackets: fitted exactly to the line. Rafter brackets are bent with a bracket bender, not a hammer, so the coating is not damaged. Brackets are fixed with at least two screws, long brackets usually with three. Screws should be stainless steel or galvanised, as ordinary black wood screws corrode quickly outdoors.
- Outlet opening: cut at the lowest point, set back from the end of the gutter as the manufacturer specifies. The edges are cleaned up and turned slightly downwards.
- Fitting the gutter: the gutter is clipped into the brackets from the highest point towards the outlet and secured with the bracket clip as the manufacturer's system requires.
- Joints and stop ends: sections are joined with the system's union joints with rubber seals, and the stop ends are fitted and sealed. With plastic, the gap in the union is set to the marked line and according to the temperature at the time of fitting, so the gutter has room to expand.
- Downpipe and test: the downpipe is connected and water is run into the furthest end of the gutter.
What the price depends on
The indicative labour price is €9.50 per running metre. This is the base for a simple straight run of eaves with good access, excluding materials. The actual labour cost is affected by these factors:
- Height and access: a bungalow or garage can be done from a ladder or a small tower. A two-storey house needs scaffolding or an access platform, which raises the price noticeably. Restricted access, for example next to a neighbour's property or over a pavement, adds further work on safety measures.
- Roof complexity: every corner, hip, dormer and extra roof level means cutting, joints and sealing. On short runs with many angles the price per running metre is considerably higher than on a long straight elevation.
- Bracket type and roof condition: rafter brackets on a new roof are quick to fit. If the covering has to be partly stripped and relaid to fit them, the work becomes more expensive.
- Fascia condition: a rotten or warped fascia board must be repaired or replaced first, otherwise the brackets will not hold and the gutter cannot be set to a true fall. This is a separate additional job.
- Removing the old gutter: taking down the old system and brackets and disposing of the waste is charged separately or increases the price per metre. Before the waste is taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Material from a labour point of view: plastic and standard steel are the quickest to fit. Aluminium needs more careful handling. Copper and zinc are the most demanding to work with, joints are often soldered, so labour tends to be considerably more expensive. The material price itself also differs, and larger sizes mean more expensive components.
- Accessories: fitting leaf guards, snow guards or heating is additional work.
- Small jobs: on a garage or carport with only a few metres of gutter, travel and preparation make up a large part of the cost, so the price per metre tends to be higher.
What makes the job easier and what slows it down
The simplest situation is a new roof: the brackets go on before the covering, the walls are not yet finished, and the installer works from scaffolding that is on site anyway. On flat-roofed garages and extensions, edge upstands finished with torch-on bitumen membrane on vertical surfaces are best completed before the guttering goes up. If the guttering is fitted to a finished house, good preparation helps:
- the area below the eaves is clear, cars are moved and garden furniture, pots and toys are put away,
- access to the neighbour's property has been agreed if work must be done from there or scaffolding stands on it,
- it is clear where the downpipe goes and where the water discharges, so this is not decided up a ladder,
- the full set of materials is ordered, including angles, stop ends and outlets, so there is no waiting for a missing part,
- the work is planned for dry weather without strong wind,
- where an overhead power line runs near the roof, the situation has been discussed with the network operator beforehand, as work near power lines is no place for improvisation,
- satellite dishes, aerials and cables on the fascia are marked in advance so they are not damaged.
Installing guttering is work at height, so leave it to an installer with suitable access equipment and fall protection. For an overview of related trades, see sheet metal works.
Typical mistakes and how they show up later
Most gutter problems have nothing to do with the material and everything to do with installation details.
Gutter with no fall or a reverse fall. Water stands in it, debris settles and it freezes in winter. The ice then pushes the gutter apart and pulls it down.
Brackets too far apart. Under wet snow the gutter sags and water collects in the dip. Brackets are commonly spaced about every 50 to 80 cm, plastic and snowy areas need closer spacing, and the exact figure is set by the manufacturer.
Gutter set too high. In a downpour water shoots over the front edge and runs down the wall. The top edge should be slightly below the extended line of the roof covering. If the gutter is too low or too far from the roof edge, water overshoots it in heavy rain and in light rain runs behind it down the fascia.
Joints sealed only with silicone. Sealant is only a supplement to the system's rubber seals. On its own it stops sealing after a few seasons and the joint starts to drip.
No expansion allowance on plastic. In summer the gutter bows, in winter it contracts, and the joints gradually open or pull out of their seals.
Fitting plastic and sealants in the cold. Plastic is more brittle at low temperatures and sealants bond less well. Manufacturers therefore state a minimum installation temperature, often around 5 °C, which must be respected. Otherwise hairline cracks and leaks appear in the first heavy rain or in spring.
Mixing components from different manufacturers. The gutter does not seat in the bracket, the union leaks and the stop end is held only by sealant. Leaks appear within the first few months.
Brackets fixed into a rotten fascia. Everything looks fine at first, but under snow the screws pull out and a whole section of gutter drops.
Outlet not at the lowest point. Some water stays in the gutter beyond the outlet, and over time rust or sediment forms there.
How to check the finished guttering
Before signing off the job, run water from a hose into the furthest end of the gutter for at least a few minutes and look at the gutter from a distance. Check that:
- water flows steadily to the outlet and no puddles remain in the gutter,
- nothing drips from the joints, stop ends or outlet,
- at full flow water does not spill over the front edge,
- water leaves the downpipe where agreed, not at the foot of the wall,
- the gutter looks straight from a distance, without sags or waves,
- brackets are evenly spaced, including near the ends and on both sides of the outlet, and are firmly fixed,
- brackets do not lift the roof covering or obstruct the roof ventilation gap,
- the coating on the gutter and brackets is not scratched or chipped,
- on plastic guttering, expansion gaps are left at the unions,
- the surroundings are tidy and neither the roof covering nor the walls are damaged.
If possible, photograph the brackets before the roof covering is laid over them. The photos are useful for any complaint or later roof work.
Frequently asked questions
The indicative labour price is €9.50 per running metre. Materials need to be added. Labour costs rise mainly with the need for scaffolding on a two-storey house, a complex roof with angles and hips, removal of the old gutter, fascia repairs and more demanding materials such as copper or zinc.
Too much fall is not an advantage. The outlet end ends up well below the line of the roof covering, and in a downpour water may overshoot the gutter at that point. On a long elevation the gutter also looks crooked. Over a ten-metre run, a normal fall means a height difference of roughly 2 to 5 cm.
Not always. If the downpipes are sound, not rusting and fit a new outlet of the same size and system, they can stay. If the manufacturer, size or colour changes, however, the downpipes are usually replaced with the gutter so the system seals properly and looks consistent.
Usually twice a year: in spring after any snow has gone and in autumn after the leaves have fallen. If there are trees near the house, leaf guards help by stopping leaves before they enter the gutter and downpipe.
Replacing guttering with something similar is usually straightforward. If the house is listed, lies in a conservation area or the appearance of the roof is changing, check the requirements with the local planning authority first. In a block of flats, gutter replacement is normally arranged by the managing agent, freeholder or management company, not by an individual flat owner.
A single leaking joint or loose bracket can be repaired. If the gutter is rusted through in several places, sags between brackets, the brackets are corroded or the fascia behind them is rotting, a repair will only last a short time and replacing the whole run is the more sensible option.
Related work
How a downpipe is fitted, which material and size to choose, where the rainwater should go and what to watch with brackets and pipe joints.
What a roof replacement costs: stripping, checking the roof structure, underlay, tiles or metal, flashings, asbestos cement and a 150 m² labour example.
Price list for sheet metal works in 2026: gutters and downpipes, chimney flashing, sills, cappings and metal roofs. What drives the cost and a NUMIQ estimate.
How torch-on bitumen membrane goes on basement walls and parapets: substrate prep, top termination, laps, corners, mistakes and checks before backfill.
How angle standing seam metal facade cladding is installed, which metals are used, what makes the job harder and how to check the finished work.
How a tinsmith fits an external window sill, why sealing strips go underneath, which material to choose and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.