Building work price list: Installing Rainwater Downpipes
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Gutters and downpipes cost | ||||
| Install downpipe | lm | €9.00 / lm | lm | enter quantity- |
| Install guttering (eaves) | lm | €9.50 / lm | lm | enter quantity- |
| Install gutter bracket | pcs | pcs | - | |
| Install downpipe clip | pcs | €3.50 / pcs | pcs | enter quantity- |
| Install gutter outlet | pcs | €12.00 / pcs | pcs | enter quantity- |
What a downpipe is and when one needs fitting
The downpipe is the last part of the roof drainage system. The gutter collects water from the roof, the outlet gathers it at one point, and the downpipe carries it down to ground level, into a drain or into a tank. A downpipe is needed on a new build and when an old, rusted system is replaced. It also comes up after external wall insulation is applied, when the original pipe clips have nothing to fix into, or when the existing downpipe cannot cope in heavy rain and water runs down the wall. Downpipes are part of the wider group of sheet metal and rainwater works on a house.
At first sight it is just a pipe on a wall. In practice, several details decide whether the house stays dry: the gutter fall, the clip fixings, the direction of the joints and where the water finally goes. A badly fitted downpipe does not show its faults straight away. The problem appears years later as a damp plinth, blown render or a damp cellar.
What to decide before installation
The installer needs a few answers before starting. Without them, decisions are made in a hurry on the scaffold, and the result may not be the best.
- Where the downpipe will run: clear of windows, lights, service entries and doors, ideally at a corner or on a plain section of wall.
- What diameter and how many downpipes: this depends on the roof area each downpipe drains.
- What material and profile: round or square, steel, PVC, aluminium or copper.
- Where the water will go: onto the ground, into a drain, into a soakaway or into a tank.
- Whether the existing gutter stays: gutter and downpipe sizes must match each other.
Downpipe diameter
The diameter is not chosen by copying the neighbours, but by the plan area of roof the downpipe drains. Manufacturers supply gutters and downpipes in fixed size pairings, and these combinations are worth keeping to. A narrow pipe under a wide gutter becomes a bottleneck in a downpour, and water overflows the gutter edge. Where the roof area is large, a second downpipe in another position is usually a better answer than an ever larger pipe. On flat and complex roofs, sizing should be left to a designer working to the applicable standards and the manufacturer's data.
Material
On typical houses, these materials are the most common:
- galvanised steel, a simple metal option, but the zinc coating must be protected from scratches,
- coated steel, a common compromise between durability and appearance, available in many colours,
- PVC, light and corrosion-free, but it expands more with heat and is more brittle in frost,
- aluminium and copper, very long-lasting materials that need an experienced installer.
The downpipe material should match the gutter material. Different metals in direct contact, for example copper and galvanised steel, can cause corrosion.
Pipe profile
Round pipe is the standard. Water flows through it with the least resistance, and it has the widest range of fittings. Square pipe is chosen mainly for appearance on modern houses. Manufacturers give it its own sizes and gutter pairings, so its capacity should be checked in the manufacturer's literature rather than estimated from a round pipe. The choice of bends, rainwater diverters and other fittings is usually narrower for square profiles.
Where to discharge the water
The downpipe has to end somewhere, and this is where most problems start. Water discharging right at the foot of the wall soaks the ground around the foundations for years and damages the plinth and the damp-proofing below ground.
Discharge onto the ground works if the ground falls away from the house, there is a paved area or gravel strip under the outlet, and the water runs off at least roughly a metre from the foundations. Do not direct water onto a neighbour's land or a public footpath, where it forms ice in winter.
Connection to a drain is reliable, but a silt trap belongs between the downpipe and the underground pipework to catch leaves and moss before they block the drain. Check directly with your water company whether rainwater may go into the public sewer and on what terms.
A soakaway suits sites where there is no sewer or a connection is not possible. It must be designed for the permeability of the ground and placed at a safe distance from the foundations and from any well. Rainwater does not belong in a cesspit or a septic tank or treatment plant. Never discharge it into a drinking water well.
A rainwater tank or water butt is connected through a diverter fitted into the downpipe. The downpipe below the diverter still needs somewhere to discharge, because surplus water carries on downwards.
For a new drain connection, a soakaway or larger alterations, ask your local authority building control what approval your situation requires. Do not assume in advance that no approval is needed. In a block of flats, agree any change to the downpipes beforehand with the managing agent or freeholder, because downpipes and the facade are usually common parts of the building.
How the downpipe is installed
The method is similar for metal and PVC systems. The main difference is how the parts are joined. The installer usually works from the top down:
- Setting out: fixes the downpipe position and marks a vertical line from the outlet to the ground with a plumb line or laser, clear of windows, lights and service entries.
- Gutter check and outlet: checks the gutter fall towards the outlet, usually around 3 to 5 mm per running metre. The outlet goes at the lowest point of the gutter, where water naturally flows. Gutter brackets are placed either side of the outlet, not directly beneath it, so the outlet sits straight and tight and the gutter does not sag there. More detail is in the guide to installing guttering and gutter brackets.
- Offset under the eaves: the roof overhang is bridged with a pair of bends, known as a swan neck or offset. The short connecting pipe is cut to length only after a dry trial fit.
- Fixing the clips: pipe clips are fixed into the load-bearing masonry or concrete, usually no more than about 2 metres apart, and closer for PVC.
- Joining the pipes: each upper pipe always goes into the socket of the pipe below. With PVC, an expansion gap is left as the manufacturer specifies.
- Bottom section: an access pipe with a cleaning door is fitted about a metre above ground, with a shoe or a connection to the underground pipework or a silt trap below it.
- Test: water is poured into the gutter and every joint is checked for leaks.
A clip belongs just below the socket of a joint, not in the middle of the pipe. On PVC downpipes, clips are tightened so the pipe can move slightly as the temperature changes. PVC expands noticeably with heat, and a pipe gripped too tightly distorts or cracks at the joint. On metal systems, clips are tightened firmly in line with the manufacturer's instructions.
Downpipe installation cost: what affects it
The guide price for labour is €9.00 per running metre. This covers a typical case: a single-storey house where the outlet can be reached safely from a ladder without scaffolding, a round downpipe in a standard material, fixing into masonry and free discharge onto the ground. The actual price is mainly affected by:
- Height and access: where a ladder is not enough, scaffolding or a powered access platform is needed. Hire and erection usually add more to the cost than the length of the downpipe itself.
- Insulated facade: clips must be fixed through the insulation into the load-bearing wall with extended fixings. Each fixing point takes longer and the fixings cost more.
- Material: copper and aluminium need more precise work and a more experienced installer, so labour is noticeably dearer than for galvanised or coated steel.
- Complexity of the run: every bend, offset or detour around a cornice means extra cutting and assembly. A short downpipe with several bends costs more per running metre than a long straight one.
- Removing the old downpipe: taking it down, removing old brackets and disposing of waste are often charged separately. In homes built before 2000, have suspect materials tested before you drill or remove them. Before you hand over the old pipework, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Concealed downpipe or outlet through a parapet: on flat roofs and with downpipes set into the facade, every detail is more sensitive to leaks and the work takes longer. Parapet walls are often waterproofed with a single-layer torch-on bitumen membrane on vertical surfaces, which has to be detailed carefully around the outlet.
- Below-ground connection: fitting a silt trap and connecting to underground pipework are priced as separate work. If a trench has to be dug, the cost rises further.
When comparing quotes, ask what exactly the price per running metre includes. Some quotes cover only the pipe and clips, others also include the outlet, bends, access pipe and shoe.
What makes the job quicker and what slows it down
How well the site is prepared has a big effect on how fast the work goes. It helps to:
- decide in advance where the downpipe will run and where the water will go, so the installer is not kept waiting for answers,
- clear the space along the wall, move the car, put patio furniture away and protect flower beds under the downpipe route,
- provide access to water, meaning a hose or bucket for the final test,
- book the work while scaffolding is still up from roofers or facade contractors, for example during a roof replacement, so separate scaffolding just for the downpipe is not needed,
- when insulating the walls, prepare fixing points while the facade work is under way and photograph their positions. Finding load-bearing masonry later through a thick layer of insulation is slow and damages the finished facade.
Strong wind, rain and frost slow the work down. PVC parts are brittle in frost and crack more easily when cut and joined, so PVC downpipes are best fitted in warmer weather.
Common mistakes and how they show up later
Most failures are caused not by poor materials but by an overlooked detail. These mistakes come up again and again:
Pipes joined the wrong way round. The lower pipe goes into the upper one, and water runs out of the joint and down the facade every time it rains. Dark streaks appear on the render, followed by algae.
Clips fixed only into render or insulation. They survive the first winter, but the weight of snow and ice pulls them out along with a piece of the facade.
Clips too far apart. A metal pipe sags, a PVC pipe distorts, and the joints start to separate.
PVC downpipe with no room to move. The expansion gap is missing or the clips are fully tightened. The pipe bows in summer and later cracks at the joints.
No fall or a reverse fall on the gutter. Water stands, dirt settles, it freezes in winter and the gutter overflows its edge, even though the downpipe is fine.
No access pipe. The first blockage means dismantling the downpipe or breaking it out of the ground connection. A blocked downpipe also holds water, which freezes and splits the pipe.
Discharge at the plinth with no ground fall and no paved strip. Water soaks in around the foundations, the plinth gets damp, render falls off and damp appears in the cellar.
Ground connection without a silt trap. Leaves and moss block the underground pipework, which is far harder to clear than emptying the bucket of a silt trap.
If an existing downpipe overflows repeatedly, the cause is often somewhere other than where the water appears. Typically the downpipe is undersized or the gutter fall is wrong.
How to check the finished downpipe
At handover, ask for rain to be simulated with a bucket or garden hose and go through these points:
- water does not stand anywhere in the gutter and flows steadily to the outlet,
- the outlet has a leaf guard,
- no joint leaks, especially at the bends under the eaves,
- upper pipes sit inside the sockets of the lower ones,
- clips are fixed into load-bearing masonry and sit below the sockets, and on PVC the pipe can move slightly in them,
- the downpipe is vertical and does not touch lights or service entries,
- the access pipe is fitted and its door opens,
- water discharges onto a paved area well clear of the foundations or into a silt trap,
- the facade around the fixings is undamaged, and holes from old brackets are made good if this was agreed.
What you can do yourself: cleaning and checking the downpipe
The installation itself is best left to a professional, because it is work at height near the roof. Routine maintenance of the lower part of the downpipe, however, can be done from the ground. Only climb to the gutter and outlet from a sound, secured ladder with a second person present. On taller houses, gutter cleaning is better left to a professional.
- Open the access pipe door and remove leaves and moss.
- Remove and clean the bucket of the silt trap, if one is fitted.
- Flush the downpipe with a hose through the access pipe and check that water drains freely.
- Check from the ground that the clips are secure and there are no signs of overflow on the facade.
- Switch a rainwater diverter for a tank to its winter setting before winter.
- Close the access pipe door and check that it fits tightly.
Frequently asked questions
As a guide, €9.00 per running metre for a single-storey house with ladder access and fixing into masonry. The price rises with scaffolding or an access platform, an insulated facade needing extended fixings, copper or aluminium, many bends, removal of the old downpipe and a below-ground connection.
Two checks a year are usually enough: in spring after the winter and in autumn after the leaves fall. Clear debris from the gutter, outlet and silt trap, flush the downpipe with a hose and check for loose clips and signs of overflow on the facade.
Yes, a diverter is fitted into the downpipe to send part of the water into the tank and let the surplus carry on down. A diverter with a winter setting is worth choosing. The tank must have an overflow, otherwise water backs up during prolonged rain.
It is ladder work near the roof, meaning work at height, so it is sensible to leave it to a professional installer. This applies especially to taller houses, metal systems, insulated facades and concealed downpipes. Regular cleaning and checking of the lower part of the downpipe can be done yourself.
Not always. If the gutter is sound, has the correct fall and matches the new downpipe in size, it can stay. With a corroded gutter, a poor fall or mismatched sizes, it is more sensible to replace the whole system at once.
Most often because the pipe is blocked with leaves or moss, water stands in it and freezes. The ice forces the pipe apart, usually at a joint or bend. On PVC downpipes, a missing expansion gap or clips tightened too hard also contribute. Prevention means regular cleaning and correct installation to the manufacturer's instructions.
With free discharge, at least roughly a metre from the foundations, onto a paved area or gravel strip, with the ground falling away from the house. If the ground does not allow this, it is better to take the water to a drain, a soakaway or a tank.
Related work
How eaves guttering is fitted: brackets, fall, joints, outlet and water test. What to consider when choosing materials and checking the finished work.
What a roof replacement costs: stripping, checking the roof structure, underlay, tiles or metal, flashings, asbestos cement and a 150 m² labour example.
Price list for sheet metal works in 2026: gutters and downpipes, chimney flashing, sills, cappings and metal roofs. What drives the cost and a NUMIQ estimate.
How torch-on bitumen membrane goes on basement walls and parapets: substrate prep, top termination, laps, corners, mistakes and checks before backfill.
How angle standing seam metal facade cladding is installed, which metals are used, what makes the job harder and how to check the finished work.
How a tinsmith fits an external window sill, why sealing strips go underneath, which material to choose and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.