Building work price list: Timber Roof Decking Installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Boarding and battening cost | ||||
| Install timber sarking | m² | €5.90 / m² | m² | enter quantity- |
| Install breathable membrane | m² | €2.90 / m² | m² | enter quantity- |
| Roof battening | m² | €5.50 / m² | m² | enter quantity- |
| Roof battening and counter-battening | m² | €2.60 / m² | m² | enter quantity- |
| Counter-battening | m² | €3.90 / m² | m² | enter quantity- |
| Roof sarking with OSB / planed boards | m² | €9.50 / m² | m² | enter quantity- |
What timber roof decking is and when it is needed
A roofing carpenter covers the rafters with boards to form a firm, flat surface with no gaps. The underlay, counter battens, battens and roof covering then go on top. Battening and counter battening follow once the underlay is laid. Decking is most often needed when an older roof is renovated, when a loft is insulated, or when the design or the roof covering manufacturer requires a continuous substrate. The work is part of carpentry construction and is usually done by the same team that repairs the roof timbers.
Decking stiffens the roof, helps spread loads and gives an accurate base for the following layers. It is most useful in these situations:
- on renovations where the old roof structure is slightly uneven and needs stabilising,
- under coverings that need a solid base, such as bitumen shingles or standing seam metal roofing,
- in an insulated loft conversion, where accuracy and airtightness of the build-up matter,
- in exposed areas with heavy snow or strong wind, where a stiffer roof is worth having.
Not every roof needs it. On a new, accurately built roof with ordinary tiles, a good quality underlay, counter battens and battens are often enough. If the design does not call for decking, ask the carpenter to explain what practical benefit it would bring.
Decking will not fix unsound roof timbers. If rafters are sagging, rotten or affected by woodworm, a new layer only hides the problem. Damaged timber must be repaired or replaced first.
What to decide before placing the order
Decking is only one layer in the roof build-up. How the carpenter installs it depends on what goes above and below it. It pays to have several points clear before a start date is agreed:
- The roof covering. Shingles, standing seam metal and tiles have different requirements for the substrate. The manufacturer states whether full decking is required, which material and what thickness. Under standing seam metal, a separating or structured underlay is usually laid between the decking and the metal. It helps drain condensation from under the sheets and reduces rain noise. Check whether the quote includes it.
- The full roof build-up. It must be clear where the insulation, the vapour control layer and the ventilation gap will be. OSB on the outer side of an insulated roof needs particular care. OSB lets water vapour through relatively poorly, so moisture from inside the house that gets into the insulation struggles to escape through it. The build-up therefore needs a properly designed, airtight vapour control layer on the warm side and a ventilated gap above the underlay.
- Who supplies the materials. If the carpenter supplies them, responsibility for timber quality and moisture content lies with them. If you buy the materials yourself, agree the exact type, thickness and quantity with the carpenter.
- How unexpected repairs to the roof timbers will be handled. On a renovation, the real condition of the roof structure often shows only once the roof is stripped. Agree in advance whether repairs will be charged separately, at what rate and who will approve them.
- Approvals. If the roof shape, the structure or the height of the house changes, check the Planning Portal before you start: many house alterations are permitted development, but you may still need building regulations approval, and flats, listed buildings and conservation areas have stricter rules. In Scotland, changing roofs or other structural elements needs a building warrant from the council before work starts. Do not assume that no approval is required. In a block of flats, any work on the roof goes through the managing agent, freeholder or residents' management company.
Boards or OSB: which to choose
Board decking
Traditional decking (sarking) from planed or sawn boards, often tongue and groove, is the long-established option. Boards adapt more easily to an uneven roof structure, unusual shapes and details around chimneys. They suit renovations, cottages and older houses. At normal rafter spacing, boards around 24 mm thick are usually used. The timber must be dry enough and straight. Damp or bowed boards twist after fixing, open up gaps and can creak later.
OSB decking
OSB comes in large sheets, so installation is quicker and the surface is flat and uniform. Roofs use boards made for humid conditions, typically OSB/3. At normal rafter spacing they are usually 18 to 22 mm thick, and wider spacing needs thicker boards. The exact thickness is set by the design or the manufacturer. OSB is sensitive to moisture, however. It needs gaps between sheets, correct fixing and must not stay wet and unprotected for long.
The better option depends on the type of roof, the condition of the timbers, the future covering and the whole build-up including ventilation. This should be decided by the designer or an experienced carpenter, not by installation speed alone.
How the installation proceeds step by step
- Inspecting the roof structure. The carpenter checks the rafters, purlins, wall plates and joints, measures how true the roof is and looks for signs of damp, rot or insect attack.
- Repairs and levelling. Damaged members are replaced or strengthened, and sagging rafters are packed out or firred to line. New or altered timber structures, such as roof rafters, should be designed by an engineer to Eurocode 5 (BS EN 1995-1-1) with the UK National Annex.
- Preparing materials. Boards or OSB are stored dry and under cover, not directly on the ground.
- Laying. Work usually runs from the eaves up to the ridge. Board joints should land on a rafter and be staggered in adjacent rows. This is the safest rule because the board end then has solid support. With tongue and groove boards, some manufacturers allow joints between rafters, but only in line with their instructions and the design. OSB is laid with its long side across the rafters.
- Fixing. Every board is fixed to every rafter with nails or screws at the spacing given by the manufacturer. OSB is laid with an expansion gap, usually around 2 to 3 mm.
- Details. Around chimneys, roof windows, valleys, hips and verges, the decking is cut and fitted accurately.
- Protection and follow-on work. The finished decking is covered as soon as possible with a vapour permeable underlay so that rain cannot damage it. The underlay, battens and covering should follow BS 5534:2014+A2:2018, including mechanically fixed ridges and verges and an underlay suited to the wind zone.
The work is done at height on a sloping surface, so it should be carried out by a roofing carpentry contractor with fall protection and suitable scaffolding. This is not safe DIY work.
What affects the price
The guide labour price is €5.90 per m². It is calculated on the area measured along the slope, meaning the actual area of the roof slopes, not the footprint of the house. On a steeper roof the roof area is noticeably larger than the ground floor area, which is often overlooked when budgeting.
The final cost depends mainly on the following:
- Condition of the roof timbers. A straight, sound structure is the cheapest case. Levelling sagging rafters, packing and replacing damaged members are separate work and can raise the cost noticeably on an old roof.
- Roof pitch. Work on a shallow pitch goes quickly. A steep roof means slower movement, more fall protection and often scaffolding all round, so the labour per m² costs more.
- Roof complexity. A simple pitched gable roof is the easiest. Dormers, valleys, hips and hipped ends mean many angled cuts, more waste and slower progress, so the price per m² rises.
- Penetrations. Every chimney, roof window or vent pipe must be worked around and supported accurately. A roof with many penetrations will cost more.
- Removing existing layers. If the old covering, battens and original boarding have to come off first and the waste must be taken away, there is extra labour and disposal cost. Roof decking removal is usually priced as a separate item. Before the waste is taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Materials. Labour and materials are two separate items. It matters whether sawn boards, tongue and groove boards or OSB are used, and what thickness the rafter spacing requires.
- Access. When a lorry can pull up by the house and materials can be passed straight up to the roof, the work goes quickly. A narrow street, a slope or carrying materials by hand across the garden makes the work more expensive.
- Height of the house. A taller house or one on a slope usually means more costly scaffolding and more effort getting materials up.
When comparing quotes, ask whether the price includes materials, fixings, a separating underlay under metal roofing, scaffolding, stripping and waste removal, and how the roof area is measured.
What makes the work easier and what slows it down
On a simple pitched roof with sound timbers, a team of carpenters can usually lay several dozen m² a day, so decking on a typical family house is often finished within a few days. Good site organisation makes a big difference. The work goes more smoothly when:
- there is a level, dry, covered spot near the house to store the boards, so they do not sit on the ground and get wet,
- it is agreed in advance where the delivery lorry will stop and where the scaffolding can stand, with the neighbour's consent if access over their land is needed,
- electricity is available on site for saws and drivers,
- the underlay follows straight on, so the exposed decking does not wait for the next trade,
- the roof covering has been chosen and the manufacturer's requirements for the substrate are known before work starts,
- tarpaulins are ready to cover the roof if rain arrives while the roof is open.
Work is slowed by rain or wind that makes it unsafe on the roof, late material deliveries and changes to the roof build-up decided during installation. In an occupied house, expect the roof to be open for some time and clear the loft in advance.
Common mistakes when installing roof decking
A fault in the decking does not usually show straight away. It appears during battening, when the covering is laid or after the first winter.
Fixing to sagging or damaged timbers without repair. A wave in the roof structure carries through into the decking and the covering. On metal and shingles every unevenness shows, and rot continues hidden under the decking.
Damp, bowed or too thin boards. Damp timber changes shape as it dries, boards twist and gaps open between them. Boards that are too thin flex between rafters and creak under the covering.
OSB sheets butted tight with no gaps. When moisture levels change they have no room to expand and they buckle. On metal roofing this shows as bulges.
Joints off the rafters or all joints in one line. Unsupported board ends drop under snow load or when walked on. Joints in a single line weaken the whole surface.
Too few fixings or unsuitable screws. Boards can loosen, creak and put load on the covering in strong wind. Fixings that are not galvanised can corrode over time.
Metal laid directly on the decking without an underlay. Condensation under the metal has nowhere to drain, the timber gets damp and rain on the roof is clearly audible in the loft.
Inaccurate details at chimneys and valleys. These are the places where roofs leak most often. A poorly supported detail is hard to flash properly and water finds its way under the covering.
Missing ventilation in the build-up or a leaky vapour control layer. Decking is a continuous surface, and moisture from the house or from air leaks may not escape through it easily. If the build-up lacks proper ventilation gaps, the decking, the insulation and the roof timbers all suffer. This shows as damp patches on the ceiling, a musty smell or mould in the loft.
Decking left unprotected for too long. If finished decking gets wet repeatedly, OSB swells at the edges and boards change shape. The covering then does not sit flat.
How to check the finished decking
Before the underlay and covering go on, inspect the decking or ask to be shown it. Later it will be covered and repairs become expensive.
- the surface is flat, with no obvious waves or dips,
- boards do not flex, creak or move when walked on,
- joints land on rafters and are staggered between rows, or follow the board manufacturer's instructions exactly,
- board thickness matches what was agreed in the quote or the design,
- gaps between OSB sheets are even,
- nails or screws are present at every rafter and do not stand proud of the surface,
- details at chimneys, windows and valleys are cut accurately,
- edges at the eaves and verges are straight and ready for flashings and trims,
- ventilation gaps required by the build-up are not covered or blocked,
- the decking is dry with no signs of prolonged wetting,
- replaced or repaired roof timbers are documented, ideally with photographs before they are covered,
- the work area is tidy and ready for the next layers.
Frequently asked questions
The guide labour price is €5.90 per m² of roof area measured along the slope. The final cost depends mainly on conditions on the particular roof and on whether materials and scaffolding are included.
No. Some coverings and some roof build-ups require it. With ordinary tiles on a new roof structure, an underlay with battens is often enough. The design and the roof covering manufacturer's requirements decide.
At normal rafter spacing, boards around 24 mm thick or OSB/3 at 18 to 22 mm are usually used. Wider rafter spacing needs thicker material. The exact thickness is set by the design or the manufacturer.
OSB/3 boards usually cope with a short shower, but prolonged wetting damages them. The edges swell and the surface becomes wavy. That is why the decking is covered with underlay as soon as possible after fixing.
Yes, this is common on renovations. The roof timbers must first be inspected thoroughly and damaged members repaired. New decking should not be fitted to a weakened structure.
Galvanised nails or wood screws are used, with length and spacing to suit the material thickness and the manufacturer's recommendations. Every board must be fixed to every rafter it crosses.
OSB changes size slightly as its moisture content changes. A gap of usually around 2 to 3 mm allows it to move. Without it, the sheets push against each other and the surface buckles.
Related work
How vapour permeable underlay is fitted under roof tiles or metal sheets, which type to choose, the details to watch and how to check the finished work.
How battens and counter battens go on under tiles, which sizes to choose, how batten spacing is set and how to check the finished grid before tiling.
Price list for structural carpentry in 2026: roof frames, rafters, timber floors and carports. What drives the cost and a quick estimate in NUMIQ.
How roof decking is removed, what makes the job harder, what to watch for with rafters and membranes, and how to check the finished work.
How battens are removed from a pitched roof, what makes the job harder, what to watch out for and how to check the rafters and underlay afterwards.
How timber is cleaned and stained, what makes the job harder, which mistakes to avoid and how to check the finished surface.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.