Price list 2026 · Europe

Installation of Vapour Permeable Underlay

Installing vapour permeable underlay means laying a secondary protective layer beneath the battens and roof covering of a pitched roof. The labour costs approximately €2.90 per m², depending mainly on the roof shape, the number of penetrations and the condition of the roof timbers.

Updated 09/2026·11 min read·6 price list items
Standard labour price
€2.90/ m²
Indicative range
€2.32 - €3.77
60 m² flat
€435.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Installation of Vapour Permeable Underlay

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Roof carpentry6 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Boarding and battening cost

Install breathable membranem²€2.90 / m²m²enter quantity-
Roof batteningm²€5.50 / m²m²enter quantity-
Roof battening and counter-batteningm²€2.60 / m²m²enter quantity-
Counter-batteningm²€3.90 / m²m²enter quantity-
Roof sarking with OSB / planed boardsm²€9.50 / m²m²enter quantity-
Install timber sarkingm²€5.90 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

What vapour permeable underlay does and when a roof needs it

If wind-driven rain, snow or dust gets under the tiles or metal sheets, the underlay catches it and carries it down to the eaves. At the same time it lets water vapour escape from the roof to the outside. Underlay is needed on a new build, when an old roof covering is replaced, when the roof timbers are repaired and when the loft is to be insulated.

The underlay is often described as a secondary weatherproofing layer. The roof covering is the first line of defence against water, and the underlay is the second. In normal weather it is hardly needed. In a gale, in driving rain or when snow melts, water can get through the joints of the roof covering. At that point the underlay decides whether the timbers and insulation stay dry.

It matters most over a habitable or insulated loft. Wet mineral wool insulates far less effectively. Timber that stays damp for long periods can be attacked by mould or rot. These problems often only show after several seasons, when stains appear on the ceiling.

The underlay is often confused with a vapour control layer. Vapour permeable underlay goes on the outer side of the insulation, under the roof covering, and lets vapour out. A vapour control layer is fitted on the room side, behind the plasterboard, and stops moisture from the rooms getting into the insulation. Each layer has a different job, so they cannot be swapped, and an insulated loft needs both.

Which type of underlay to choose and what to decide before installation

The underlay should be chosen to suit the whole roof build-up, not the price per roll. Before ordering the work, the following points should be clear.

Low resistance or high resistance underlay

Low resistance (LR) underlay is highly vapour permeable, so it can lie directly on the thermal insulation or on the roof decking. It is used on insulated roofs where there is no room for an air gap between the insulation and the underlay.

High resistance (HR) underlay needs a ventilated space beneath it through which moisture can escape. The choice does not depend on the age of the roof but on whether the build-up really has this space under the underlay. This is often the case on older roofs and over an unused cold loft. If it is laid directly on insulation, moisture can stay trapped in the structure.

Under metal sheets or under tiles

Metal sheeting heats up and cools down quickly, so condensation forms easily beneath it. Where metal is laid on continuous boarding, a membrane with a structured drainage mat is used. The mat creates a thin gap under the metal through which condensation can drain, and the sheeting dries out better. Where metal is laid on battens, it is worth considering sheeting with an anti-condensation backing on the underside, which holds moisture and gradually releases it. In both cases ventilation must be properly designed. The underlay also has to withstand tradespeople walking on the roof while the metal is fitted.

Under clay or concrete tiles the underlay mainly protects against wind-driven rain and snow. It forms part of the build-up together with the counter battens, battens and ventilated gap.

Other deciding factors

  • Use of the loft: a basic underlay may be enough over an uninsulated garage, while a higher-quality membrane makes sense over a habitable loft.
  • Roof pitch: on a low pitch the requirements for laps between rolls and sealing of joints and nail holes increase.
  • Type and position of insulation: whether the insulation goes between the rafters, over them, or whether the loft stays cold. This determines whether the underlay can lie directly on the insulation.
  • Penetrations: how many roof windows, chimneys and vents there will be and where. An opening cut afterwards into finished underlay is harder to seal.
  • Taping of laps: whether all laps are to be taped, which is usual over an insulated loft, or simply overlapped.

The suitable use is always stated on the manufacturer's technical data sheet. It is worth having it to hand and using it to check the laps and how long the underlay may be left exposed. Re-roofing should follow BS 5534:2014+A2:2018, the code of practice that also covers underlays, including an underlay suited to the wind zone.

If the installation is part of re-roofing or other roof alterations, check with the local authority building control whether the work needs approval under the building regulations. In Scotland, changing a roof needs a building warrant from the council before work starts. In a block of flats the roof is usually a shared part of the building, so the first contact is the freeholder or managing agent, and no work should be done on the roof without their consent.

How vapour permeable underlay is installed step by step

This is work at height, carried out by a carpenter or roofer with fall protection in place. It is one of the tasks within carpentry and roof structure work. The usual sequence is:

  1. Checking the roof timbers: the tradesperson checks that the rafters are true, the condition of the timber and the junctions at the eaves, chimney and roof windows. Damp or decayed timber is repaired first.
  2. Preparing the eaves: the eaves are set up so the underlay can discharge onto an eaves tray or into the gutter and water runs off clear of the structure.
  3. First run: rolled out horizontally along the eaves, printed side facing out as marked by the manufacturer.
  4. Further runs: work continues towards the ridge so that each higher run overlaps the one below. The lap is usually around 100 to 200 mm, more on lower pitches, with the exact figure set by the manufacturer.
  5. Fixing: the underlay is temporarily fixed with staples. High resistance underlay is left with a slight drape between the rafters so any water runs down to the eaves.
  6. Laps and details: laps are taped and details at the chimney, windows and penetrations are sealed with the system tapes, collars and sealants.
  7. Counter battens: nailed along the rafters. On low pitches a sealing tape is often placed beneath them to seal the nail holes.
  8. Battens and roof covering: fitted as soon as possible so the underlay is not left exposed to sunlight for long.

The counter battens create a gap through which air flows from eaves to ridge and carries moisture away. Without this gap water would condense under the roof covering. The underlay therefore only works together with the counter battens, ventilation and a properly detailed eaves. The following step is roof battening and counter battening installation.

On a simple gable roof of a house, a team can usually lay the underlay with counter battens in about one to two days. A complex roof with many penetrations, timber repairs or poor weather will extend this.

Cost of installing vapour permeable underlay per m²

The guide price for labour is €2.90 per m². This is the labour price only. Underlay, tapes, collars and counter battens are normally charged separately as materials, so check whether the quote includes them.

The area of the roof slopes is measured, not the footprint of the house. A steeper roof has a larger area for the same footprint. More material is always needed than the roof area, because the runs overlap and cutting produces waste. On a simple roof the difference is small, on a complex roof considerably larger. The final cost depends mainly on:

  • Roof shape: a plain gable roof with no penetrations is the simplest. Hipped roofs, valleys and dormers mean many cuts, more waste and time-consuming sealing of details. The labour per m² increases noticeably, and a very complex roof can cost considerably more than a simple one.
  • Penetrations: every chimney, roof window, aerial or soil vent pipe means a collar, tapes and sealing by hand. On a roof with many penetrations the details make up a large share of the work.
  • Pitch: a low pitch requires larger laps and sealing tapes under the counter battens, which adds material and time.
  • Taping all laps: over an insulated loft all laps are taped, which takes longer than loosely overlapped runs.
  • Condition of the substrate: rafter repairs and replacing boarding or battens are charged extra, and on an old roof they can cost more than the underlay itself. Where new boarding is required, see timber roof decking installation.
  • Type of underlay: a more durable membrane for metal roofing or over a habitable loft mainly raises the material cost. A thicker membrane with a drainage mat is, however, harder to unroll and join, so it also adds some labour.
  • Height and access: a tall building, a steep roof or poor access mean scaffolding, more complex fall protection and slower handling of materials.
  • Stripping the old roof: if the underlay is fitted during refurbishment, removal and disposal of the old covering and battens are charged separately, as is roof decking removal where old boarding has to come off.

When comparing quotes, ask for a breakdown showing whether materials, tapes, counter battens, transport and substrate preparation are included. A quote without these items may look attractive, but the details are then missing.

How to prepare the site so the work goes quickly

How smoothly the work goes also depends on what the client has prepared. The following helps most:

  • clear space around the house for scaffolding, a materials hoist and storage, with no parked cars or items against the walls,
  • roof covering and battens ordered and delivered so they can be fitted straight after the underlay,
  • positions of roof windows and penetrations decided in advance, so the finished underlay does not have to be cut later,
  • access to electricity on site for power tools,
  • a skip ready or waste collection arranged for refurbishment work, using a carrier registered with the Environment Agency who provides a waste transfer note,
  • in a block of flats, a date agreed in advance with the managing agent and neighbours informed.

Rain, strong wind and frost slow the work down. In wind the rolls are hard to lay out, and tapes do not stick well to wet or frozen underlay. If the roof is opened up during refurbishment, temporary covering should be ready in case the weather changes.

Installation mistakes that only show after winter

A finished roof can look fine until the first strong wind and rain arrive. Roof inspections most often reveal these faults:

  • laps too small or runs laid from the top down: water gets under the lap and stains appear on the ceiling,
  • underlay laid the wrong way up: it lets vapour through less well and moisture stays in the insulation,
  • general-purpose tape instead of the system tape: it loses adhesion over time and the laps open up,
  • penetrations simply cut without a collar or taping: damp patches appear around the chimney and windows,
  • underlay not taken down onto the eaves tray: water runs into the masonry or insulation and timber at the eaves gets wet,
  • missing or blocked ventilated gap: water condenses under the roof covering, especially under metal,
  • high resistance underlay laid directly on insulation: vapour cannot escape and the insulation gradually gets wet,
  • holes from tools or roofing materials left unrepaired: minor leaks that are hard to trace,
  • underlay left exposed longer than the manufacturer allows: UV radiation weakens it and it loses its watertightness.

Repairs are usually difficult, because the roof covering and battens have to come off and wet insulation sometimes has to be replaced. A small fault in one detail can therefore mean work on the whole roof.

How to check the underlay at handover

Before the underlay is covered by battens and the roof covering, it is worth walking the roof with the tradesperson or having all the details photographed. Afterwards the underlay can no longer be seen. Check:

  • that the runs are horizontal, laid from the bottom up, with each higher run overlapping the one below,
  • that the laps match the technical data sheet and the roof pitch,
  • that the underlay faces the correct way according to the print,
  • that laps and details are sealed with tapes intended for that underlay,
  • that the chimney, roof windows and penetrations are sealed with a collar or tape with no open gaps,
  • that the underlay discharges onto the eaves tray or into the gutter,
  • that there are no tears or holes in the surface,
  • that the counter battens form a continuous ventilated gap from eaves to ridge,
  • that the roof covering follows within the time allowed by the underlay manufacturer,
  • that information on the type of underlay and tapes used, or the technical data sheet, has been provided.

Frequently asked questions

The labour alone costs approximately €2.90 per m² of roof area, with materials usually charged separately. The price rises with a complex roof, many penetrations, a low pitch, taping of all laps and repairs to the roof timbers or boarding before installation.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.