Building work price list: Roof Battening and Counter Battening Installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Boarding and battening cost | ||||
| Roof battening and counter-battening | m² | €2.60 / m² | m² | enter quantity- |
| Install breathable membrane | m² | €2.90 / m² | m² | enter quantity- |
| Roof battening | m² | €5.50 / m² | m² | enter quantity- |
| Counter-battening | m² | €3.90 / m² | m² | enter quantity- |
| Roof sarking with OSB / planed boards | m² | €9.50 / m² | m² | enter quantity- |
| Install timber sarking | m² | €5.90 / m² | m² | enter quantity- |
What the roof batten grid does and when it is needed
Counter battens are fixed to the rafters through the roofing underlay. Tile battens run across the counter battens, and the roof covering is hung on them or screwed to them. Once the roof is covered, the battens cannot be seen. They still decide whether the roof will be straight, dry and properly ventilated.
This work is needed:
- on a new build, once the roof structure is complete and the roof is ready to be covered,
- when the roof covering is replaced, especially when changing the tile type or moving from tiles to metal sheeting,
- when the old battens are rotten, twisted or do not suit the new covering,
- when an older roof has no underlay and one is to be added during the renovation. Counter battens then have to be added as well.
The work is normally carried out by a roofing carpenter. More about the wider trade can be found in the overview of carpentry construction.
Battens and counter battens: what each layer does
Battens and counter battens are always installed together, but each layer has a different job.
Counter battening means fixing battens exactly along the line of the rafters, running down the slope from the eaves to the ridge. Counter battens press the underlay against the rafters and lift the tile battens above it. This creates a ventilated gap through which air flows from the eaves to the ridge, carrying away moisture and condensation. If wind-driven rain or snow gets under the covering, the water can run down the underlay into the gutter. The depth of the ventilated gap is set by the thickness of the counter batten.
Tile battening for a slate or tile roof means horizontal battens fixed to the counter battens. Each course of tiles hangs on one batten, so accurate gauge is critical. Between the counter battens, the battens act as small beams, so their section is chosen according to the rafter spacing and the load from the covering and snow.
Why can one not be used without the other? Without counter battens the tile battens would sit directly on the underlay. Water would stop at every batten, and moisture under the covering would have no way out.
What to decide before the carpenter arrives
Battening is set out for one specific roof covering. Several points should therefore be clarified before the work is ordered, not on the roof.
- The exact roof covering. The batten gauge and the position of the first batten at the eaves and the last at the ridge come from the manufacturer's fixing instructions for that tile. Until the covering is chosen, the carpenter has nothing to set the battens out from.
- Type of underlay and roof build-up. If the loft is being insulated or is already insulated, the underlay must be suitable for direct contact with insulation. A vapour permeable (breathable) underlay can lie directly on the insulation or on over-rafter insulation, and the roof then has one ventilated gap, above the underlay. With a non-breathable underlay, a second ventilated gap must be left between the underlay and the insulation. Low-pitched roofs need a higher-grade underlay and sealing tapes as required by the covering manufacturer. Details are covered in the article on installing vapour permeable underlay.
- Counter batten depth. This depends on the pitch, the rafter length and how complex the roof is. Around dormers and valleys a deeper section is worth using.
- Positions of roof windows, access hatches and chimneys. Battens have to be interrupted or added around them, with a route left for air. If the window positions are known in advance, the battens can be set out around them from the start.
- Who supplies the timber and fixings. Whether the carpenter buys the materials or the client does, and what they must meet (kiln dried, strength graded, preservative treated).
- Who does what. If one firm battens and another lays the covering, they must agree the gauge and the details at ridge and eaves before work starts. Otherwise it is hard to establish responsibility if something goes wrong.
- What happens to the old battens. On a renovation, decide in advance whether the old battens stay or are replaced, and who removes the old timber and tiles. If existing boarding is taken off as part of the job, see roof decking removal. Where the roof is to be boarded, timber roof decking installation comes before the battening.
This is work at height, so it should be done by a carpenter with proper fall protection and scaffolding. When replacing a roof covering or altering the roof structure, check in advance with local authority building control what approval the building needs. Do not assume that no approval is required. In Scotland, changing roofs or other structural elements needs a building warrant from the council before work starts. In a block of flats, decisions about the roof are made by the freeholder, managing agent or management company, because the roof is a shared part of the building. If the rafters are damaged or are to be replaced, a structural engineer should assess the roof. New or altered roof rafters should be designed by an engineer to Eurocode 5 (BS EN 1995-1-1) with the UK National Annex.
Installation step by step
The order of the layers is fixed. The underlay goes on the rafters before the counter battens, never the other way round.
- The carpenter checks the roof structure: whether the rafters are in one plane, dry and free of rot or insect attack. The plane is checked with a string line across the roof, and rafters are packed or trimmed as needed.
- The actual rafter lengths from eaves to ridge are measured. These commonly differ from the drawings by several centimetres.
- The underlay is laid parallel to the eaves, working upwards from the eaves, with laps as specified by the manufacturer (usually around 10 cm, more on low pitches). At the eaves it is dressed into the gutter or onto the eaves carrier.
- Sealing tape is applied to the underlay over each rafter or to the underside of the counter battens. The tape then sits between the underlay and the counter batten and seals the holes the nails make in the underlay.
- Counter battens are fixed along the rafter lines with galvanised nails or screws that must penetrate the rafter securely. A route for air is left at the ridge and in valleys.
- The first batten at the eaves and the last at the ridge are fixed according to the covering's instructions. The rest is divided into equal gauges and the marks are transferred to both end counter battens.
- The remaining battens are fixed to a string line, each one into every counter batten. Batten joints are always made over a counter batten and staggered in adjacent courses.
- Around chimneys, roof windows and access hatches, battens are added according to the window or covering manufacturer's instructions, and it is checked that air can flow beneath them.
- The finished area is sighted from the eaves and checked for line, gauge and firmness. Only then does tiling begin.
Batten and counter batten sizes and gauge for tiles
Common batten sections are 30 × 50, 40 × 50 and 40 × 60 mm. A simple rule applies: the wider the rafter spacing and the heavier the covering, the heavier the batten. On a typical house with a tiled roof, 40 × 50 mm is most often used. With widely spaced rafters or in areas with higher snow loads, 40 × 60 mm is used. An undersized batten does not show at once, but with the first heavy snowfall, when a whole course of tiles sags.
The counter batten is chosen according to the ventilated gap the roof needs. A depth of about 40 mm is regarded as the usual minimum, and counter battens of 50 to 60 mm are more common. The lower the pitch and the longer the rafters, the slower the air moves and the deeper the gap needs to be. Deeper counter battens are also used around dormers and valleys, where the air path to the ridge is interrupted or longer.
The batten gauge for tiles depends on the cover length of the specific tile and the roof pitch. On lower pitches the battens must be closer together so the courses overlap more. The binding values are in the manufacturer's fixing instructions, and following them is often a condition of the covering warranty. Re-roofing should also follow BS 5534:2014+A2:2018, including mechanically fixed ridges and verges and an underlay suited to the wind zone. The gauge should therefore never be copied from another building or estimated. Metal roofing has its own rules based on the profile module, so battening for tiles cannot simply be reused for it.
Material quantities can be estimated roughly. With a batten gauge of about 30 to 35 cm, around 3 running metres of batten are needed per m² of roof. With normal rafter spacing, counter battens come to about 1 to 1.3 running metres per m². Allow extra for cuts and waste, which are higher on a complex roof.
The timber is worth checking on delivery. Battens should be kiln dried (moisture content up to about 20 %), strength graded, free of large through knots and treated against insects and fungi. Before installation, leave them on site for a few days, stacked with spacers and covered, not wrapped airtight.
What affects the price
The guide labour price is €2.60 per m². The measured area is the area of the sloping roof planes, not the footprint of the house. On steeper roofs the difference is significant: at a 45° pitch the roof area is roughly 40 % larger than the floor area beneath it. When comparing quotes, check how each firm measures the area and whether overhangs at the eaves and verges are counted the same way.
The final price is mainly affected by:
- Roof shape. A simple pitched roof on a new, true structure is the cheapest. Dormers, valleys, hips, chimneys and roof windows mean more measuring, cutting and waste. A complex roof can be noticeably more expensive per m², sometimes by tens of percent.
- Renovation rather than new build. The covering must first be stripped, the old battens removed, nails pulled and waste taken away. These are often separate items added to the battening. Before the old timber and tiles are taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Condition of the roof structure. Crooked, damaged or infested rafters must be trued, packed or repaired. The less true the structure, the longer it takes to bring it into plane.
- Roof pitch. A low pitch needs closer battens, deeper counter battens, a better underlay and sealing tapes, so more material and labour per m². A very steep roof makes movement and fall protection harder.
- Height and access. A taller building, a roof over a terrace or a neighbouring property, a narrow street with no space to unload materials and the need for scaffolding all add to the cost.
- Materials. Heavier batten sections, deeper counter battens, better underlay and stainless or galvanised fixings increase the material cost. Check whether the quote includes the underlay and tape or only the timber grid.
What speeds the work up and what slows it down
How well the site is prepared also affects progress.
- Helps: timber delivered in advance, stacked with spacers and covered close to the house, so it does not have to be carried across the whole plot.
- Helps: scaffolding erected and inspected, a power supply for saws and drivers, and a space for cutting.
- Helps: clear access for the delivery vehicle and a place for waste, especially on a renovation.
- Slows down: rain, strong wind and frost. Underlay is hard to lay in wind, wet timber is harder to work, and nobody works on a roof in the rain. On a renovation, a stripped roof should not be left overnight without underlay.
- Slows down: waiting for the roofer or the delivery of tiles. Finished battening with underlay only protects the house temporarily. Underlay is not designed for long exposure to sunlight, so the covering should follow as soon as possible, within the period stated by the underlay manufacturer.
Typical mistakes and how they show up later
Counter battens omitted or the gap too shallow. Condensation has no way out and gradually damages both the timber and the loft insulation. It shows as damp patches on the ceiling, stale air in the loft and mould.
Underlay laid over the counter battens instead of directly on the rafters. Water on the underlay stops at every batten and ventilation does not work. Areas form under the covering where water sits and the timber rots.
Underlay unsuitable for the insulation. A non-breathable underlay laid directly on insulation without a second ventilated gap traps moisture in the insulation. The insulation gets damp, loses performance and the rafters begin to suffer.
Sealing tape missing or in the wrong place. Every nail is a possible leak. The first drips appear with wind-driven rain or melting snow, often far from the point where the water actually got in.
Batten gauge set "by eye". This only becomes obvious at the ridge, when the last course of tiles does not fit. The tiles then sit badly, the courses do not overlap as they should, and the manufacturer may refuse the warranty.
Wet or untreated timber. Once fixed it twists, the covering ripples, and untreated timber is more easily attacked by insects and fungi.
Batten joints between supports and unprotected nails. The batten sags at the joint, and the nails rust over time, weakening the whole fixing.
Ventilated gap blocked at the ridge, in a valley or at a roof window. Air stops moving and moisture builds up exactly in these sensitive places.
Most of these faults only appear after several seasons, when putting them right means stripping the finished covering.
How to check the finished battening before tiling
While there is no covering on the battens, the gauge or a loose batten is easy to correct. Once the first courses of tiles are laid, it means taking them off again. Before accepting the work, check that:
- sighted from the eaves, the battens are straight, without waves or kinks,
- the number of courses is the same on both sides of the roof,
- the batten gauge and the positions of the first and last battens match the covering manufacturer's instructions,
- neither battens nor counter battens move or spring when pressed,
- counter battens sit along the rafter lines, with sealing tape between them and the underlay,
- batten joints are over counter battens and staggered in adjacent courses,
- the ventilated gap is open from eaves to ridge, including around the chimney and windows,
- the underlay is not torn and is dressed into the gutter at the eaves,
- the timber used is dry, treated and free of large through knots,
- the build-up has been photographed before it is covered, in case of a later claim.
Frequently asked questions
The guide price is €2.60 per m² of roof area. The final amount depends mainly on how complex the roof is, the condition of the rafters, the pitch, access and whether it is a new build or a renovation that involves stripping the old battens.
On a simple pitched roof of a family house, a team of carpenters can usually lay the underlay, counter battens and battens in a few days. A complex roof, repairs to the structure, stripping old battens and bad weather all add time.
Not on a modern roof with underlay. Without counter battens there is no ventilated gap and water on the underlay cannot drain to the eaves, which in time damages both the roof timbers and the insulation.
Only if they are sound, straight and their gauge suits the new covering. Rotten, split or crooked battens, or a gauge that does not match the new tile, mean replacement.
Yes, it seals the nail holes in the underlay. It must sit between the underlay and the counter batten, not beneath the underlay. On low pitches, covering manufacturers usually require it as part of their system.
The fixing instructions of the specific covering manufacturer, according to the roof pitch. If one firm battens and another lays the covering, agree the gauge before work starts.
It is work at height on a structure that carries the whole covering and the snow load, and mistakes only show years later. It is safer to leave it to a carpenter with fall protection and scaffolding, who is also responsible for following the covering manufacturer's instructions.
Related work
How vapour permeable underlay is fitted under roof tiles or metal sheets, which type to choose, the details to watch and how to check the finished work.
How timber decking is fitted to rafters, when to choose boards or OSB, what to watch out for and how to check the finished work.
Price list for structural carpentry in 2026: roof frames, rafters, timber floors and carports. What drives the cost and a quick estimate in NUMIQ.
How roof decking is removed, what makes the job harder, what to watch for with rafters and membranes, and how to check the finished work.
How battens are removed from a pitched roof, what makes the job harder, what to watch out for and how to check the rafters and underlay afterwards.
How timber is cleaned and stained, what makes the job harder, which mistakes to avoid and how to check the finished surface.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.