Building work price list: Painting Cast Iron Radiators (per section)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Painting cost | ||||
| Painting radiators (per section) | pcs | €2.40 / pcs | pcs | enter quantity- |
| Painting - basic white emulsion (2 coats) | m² | €2.10 / m² | m² | enter quantity- |
| Wall painting - coloured finish | m² | m² | - | |
| Oil-based paint application to plinth | m² | €7.50 / m² | m² | enter quantity- |
| Ceiling painting | m² | €2.90 / m² | m² | enter quantity- |
| Acetone-based stain-blocking primer for water and nicotine stains | m² | €3.80 / m² | m² | enter quantity- |
| Painting vertical heating pipes | lm | €3.00 / lm | lm | enter quantity- |
| Painting cast iron radiators | pcs | €65.00 / pcs | pcs | enter quantity- |
| Wallpapering walls | m² | m² | - | |
When a radiator needs repainting and how sections are counted
Painting a radiator per section means renewing the finish on a sectional radiator, usually cast iron. It is worth doing when the old paint is flaking, yellowing or showing rust, or when the radiator no longer suits a freshly decorated room. A new coat is not only cosmetic. It protects the metal from corrosion, and a smooth surface is easier to keep clean. Within painting and decorating, radiators are one of the more fiddly jobs.
A sectional radiator is made of individual sections joined side by side. Each section has a shaped surface on both faces, with ridges and narrow gaps that are hard to reach with a brush. For this reason the work is not priced by area like a wall, but per section: the number of sections gives the number of units. A typical radiator under a window has roughly 8 to 20 sections. Large radiators in older houses can have more.
Counting the sections is simple. Stand in front of the radiator and count the vertical columns from left to right. Each one is one section, regardless of its height or depth. If there are several radiators in the property, count the sections on each one separately and add them up. When comparing quotes, it is then easy to see whether each decorator is pricing the same amount of work.
What to decide beforehand
Painting a section normally includes cleaning, degreasing, sanding and applying the top coat. Rust removal, an anti-corrosion primer or taking the radiator off the wall are often priced as separate items. It is therefore worth agreeing in advance exactly what the labour price covers.
- Extent of preparation: is it enough to clean and key a sound old finish, or does rust and flaking paint need removing?
- Number of coats: one coat will not cover when changing colour or painting over a dark finish. Agree whether the price includes two coats.
- In place or removed: the most thorough result comes from taking the radiator off the wall. This means working on the heating system. In a block of flats, draining down and removal should be agreed in advance with the managing agent or management company, and the work should be done by a heating engineer. A decorator normally paints the radiator in place.
- Paint type and colour: decide between water-based and solvent-based paint, and choose the colour. This affects drying time and ventilation.
- Timing: the radiator must be cold while it is painted. The easiest time is outside the heating season. In winter, expect the room to be without that radiator for a few days.
- Wall behind the radiator: if the room is also being decorated, agree the order of work. The wall behind is easier to paint while the radiator is off the wall or before it is painted. This applies to a mist coat and two coats of white emulsion as well as a coloured finish.
How the decorator works, step by step
- Cooling down: the heating is turned off and the radiator is left to cool completely. On a warm surface the paint dries too fast, colours unevenly and adheres poorly.
- Protection: the floor, the wall behind and nearby items are covered with dust sheets or polythene, because paint drips easily between the sections. The valves, the thermostatic radiator valve (TRV) head and the valve connections are masked with tape.
- Cleaning: dust is brushed out of the gaps with a narrow radiator brush, then the surface is washed with sugar soap or detergent and degreased.
- Removing loose paint and rust: loose flakes and rust are taken off with a wire brush, abrasive paper or a sanding attachment. Sound paint is lightly sanded to give the new coat a key.
- Treating rust and priming: rusty spots are treated with a rust converter or an anti-corrosion metal primer. On older radiators with many layers of paint, a primer improves the adhesion of the top coat.
- Surface check: before painting, dust is wiped off and the surface is checked. It must be clean, dry and free of flaking areas.
- First coat: paint is applied thinly. An angled radiator brush is used for the gaps and a mini roller for the flat faces. The inner parts and gaps are painted first, then the fronts of the sections.
- Drying and second coat: the second thin coat goes on only once the first has dried, according to the information on the tin.
- Finishing: the tape and coverings are removed and the room is ventilated. The heating is turned back on only after the time recommended by the paint manufacturer.
If the exposed pipework is being refreshed at the same time, painting vertical heating pipes follows a similar sequence and fits well into the same visit.
Which paint to choose
Ordinary wall emulsion and standard wood gloss do not belong on a radiator. Heat makes them yellow, crack and peel. Use paints that the manufacturer specifically labels as suitable for radiators. Always check the heat resistance on the label.
- Water-based (acrylic) radiator enamel: dries quickly, has little odour and suits an occupied home. It is adequate for a normal central heating system.
- Solvent-based radiator enamel: harder and more resistant to wear, but slower to dry and with a strong smell. It needs thorough ventilation, so it is more often used in cellars, workshops and plant rooms.
- Paints with an anti-corrosion component: suitable for older radiators with light rust. Some can be applied directly to cleaned metal.
Colour is not the only choice. White remains the classic, but a radiator can also be anthracite, matt black or matched to the wall so that it blends into the room. If you are planning a coloured finish on the walls, the radiator can be painted to match. With metallic finishes, be aware that some manufacturers state they may slightly reduce heat output. Gloss enamel is easier to wipe clean, while matt shows fewer small imperfections left by old layers.
What affects the price
The guide labour price is €2.40 per section. Multiply it by the number of sections to get the total. A radiator with 12 sections therefore costs twelve times the price per section, and two such radiators twenty-four times. The final price can vary depending on how much work each section needs:
- Condition of the old paint: a sound but faded finish only needs cleaning, sanding and painting. Cracked, thick or many-layered paint has to be partly removed, which adds considerably to the time and cost.
- Rust: every rusty spot means wire brushing and treatment with a converter or primer. Extensive rust is priced as a separate item.
- Size and shape of the sections: tall, deep or unusual sections with narrow gaps have more surface and more awkward areas, even though each counts as one unit.
- Access: a radiator close to the wall, under a low window board or behind furniture takes longer, and the backs of the sections are hard to reach.
- Number of coats and primer: a primer and every extra coat add labour and materials.
- Colour change: going from dark to light usually needs more coats, as one will not cover.
- Removal: taking the radiator off and refitting it is done by a heating engineer and charged separately, as is draining and refilling the system.
- Paint type: specialist radiator enamels and anti-corrosion paints cost more than standard paints. Materials are included in the labour price only if agreed.
What makes the job quicker and what slows it down
A lot of time can be saved by preparing before the decorator arrives:
- turn the thermostatic valve off a few hours beforehand so the decorator does not have to wait for the radiator to cool,
- move furniture away from the radiator and take down net curtains, curtains and anything on the window board,
- buy the chosen paint in advance, or agree clearly that the decorator will supply it,
- with several radiators, agree the order of rooms so that ventilation is possible and coats can dry in parallel,
- if the radiator is being removed, book the heating engineer and, in a flat, inform the managing agent so that the timing fits with the painting.
The work takes longer in a cold, unventilated room where paint dries slowly, and in an occupied room that has to be vacated for a while because of the smell of solvent-based paint.
Common mistakes and how they show up later
Painting a warm radiator. The paint dries unevenly and can start to peel within a few days.
Applying too thick a coat. The paint runs, forms drips and patches, and builds up in the gaps. Thick build-up also cracks over time. Two thin coats are always better than one thick one.
Skipping cleaning and sanding. New paint does not stick to dust and grease and begins to flake within months. Preparation decides how long the finish lasts.
Leaving rust untreated. Rust under new paint carries on spreading. Brown stains and blisters eventually appear on the surface.
Using the wrong paint. Wall or wood paint on hot metal yellows and cracks, often during the first heating season.
Turning the heating on too soon. Heat on paint that has not cured causes marks, bubbles or a change in colour.
Painting over the valves. The TRV head, the bleed valve and the valve connections should not be painted. Otherwise they seize or cannot be loosened, which only becomes apparent when bleeding or repairing the radiator.
How to check the finished work
- the finish is even and covers the gaps between sections, check with a torch from above and from the side,
- there are no drips, runs or build-up of paint, especially on the bottom edges of the sections,
- no rust or old colour shows through,
- the valves, TRV head and valve connections are free of paint and can be operated,
- the floor, wall, window board and surroundings are clean and free of paint marks,
- the paint is not tacky and leaves no fingerprint when touched,
- after the heating is first turned on, the paint does not yellow, bubble or become sticky.
DIY guide: what to watch out for
Painting a radiator in place is a manageable DIY job if you have patience for the gaps between the sections. The method is the same as the decorator's described above. Do not work on the heating system yourself - removal and draining down are for a heating engineer. Very old paint may contain lead, so do not dry-sand it without a respirator, and wipe up dust afterwards with a damp cloth.
- Get an angled radiator brush, a mini roller, a narrow dusting brush, a wire brush, abrasive paper, masking tape, dust sheets, gloves and a respirator.
- Buy paint labelled as suitable for radiators and read the recoat time on the tin.
- Use a torch to light the backs of the sections and a small mirror while painting, so that no areas are missed.
- Load the brush lightly and work from top to bottom so that paint does not run onto the bottom edges.
- Brush out drips on the bottom edges straight away, before the paint starts to set.
Frequently asked questions
As a guide, €2.40 per section. Multiply by the number of sections for the total. Expect to pay more for rust, thick old paint, poor access and extra coats.
Preparing and painting a standard radiator usually takes a few hours. The overall time, however, depends on drying between coats as stated on the tin, so a two-coat job often spreads over one to two days. With solvent-based paint and in a cold room it can take longer.
Not always. If the old paint is sound, cleaning, degreasing and sanding is enough. Full stripping makes sense when the paint is flaking extensively or there is widespread rust underneath.
Follow the paint manufacturer's information. Usually at least a day is needed, and longer for solvent-based paints. Bring the heating up gradually the first time, with a window open.
A thin coat of radiator paint has practically no effect on output. The problem is rather thick layers built up over the years and some metallic paints, which may slightly reduce heat output.
Not usually for simply painting the radiator in place. If you want to remove the radiator or drain water from the system, agree this in advance with the managing agent or management company. The work should be done by a heating engineer.
Yes, the method is similar. Steel panel radiators have a factory-baked finish, so they need thorough degreasing and keying with abrasive paper for the new paint to adhere.
Related work
How walls get two coats of white paint, which paint to choose, what makes the job harder and how to check that the finish is even.
How coloured wall painting is done, which paint to choose, what makes the job harder and how to check the result. Practical advice for flats and houses.
How vertical heating pipes are painted, which paint to choose, what makes the job harder and how to check the finished coat.
How wallpapering is done, which type of wallpaper to choose, how to prepare the wall and how to check the finished job.
How much do painting and decorating works cost per m² in 2026? Live labour rates for walls, ceilings, preparation and a 60 m² flat example.
How to recognise old distemper, why it must come off before repainting and how to scrape it without damaging the plaster. Steps, mistakes and checks.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.