Building work price list: Stripping Old Paint (Removal)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Preparation | ||||
| Scraping off old (water-based) paint | m² | €3.50 / m² | m² | enter quantity- |
| Scraping off old oil-based paint | m² | €5.40 / m² | m² | enter quantity- |
| Crack bridging and repair of large cracks | lm | lm | - | |
| Acrylic sealing of joints | lm | €1.90 / lm | lm | enter quantity- |
| Priming walls and ceilings | m² | €1.00 / m² | m² | enter quantity- |
| Local crack repairs and patching | pcs | €3.50 / pcs | pcs | enter quantity- |
| Skimming walls | m² | €6.50 / m² | m² | enter quantity- |
| Skimming ceilings | m² | €7.50 / m² | m² | enter quantity- |
| Venetian plaster - polished finish | m² | m² | - | |
| Fitting corner beads | lm | lm | - | |
| Removing old wallpaper | m² | €3.50 / m² | m² | enter quantity- |
What stripping old paint is and when it is needed
It is preparation of a wall or ceiling before redecoration. Old soft distemper, glue-bound distemper or limewash softens when wetted and can be scraped off. It is needed mainly in older flats and houses. Layers of paint applied decades ago are often still on the walls, and new emulsion simply does not hold on them.
Signs that stripping is needed include walls that leave a powder on your hand, cracking in the ceiling paint and flakes lifting in places. New paint applied straight over such a surface does not solve the problem, it only postpones it. Stripping is therefore the first step before filling, priming, any skimming and painting. It is one of the preparation stages within painting and decorating.
This work applies only to water-based coatings that soften with water. Oil-based and gloss finishes, for example on old dado-height painted bands in kitchens or hallways, do not soften with water. Nor do vinyl emulsions and other modern emulsion paints: they are thinned with water when applied, but once dry they form a tough film that resists water. These coatings are removed differently, as described under stripping old oil paintwork.
How to tell that the wall has a water-based paint
The simplest test takes a few seconds. Run a dry palm over the wall. If white powder is left on your hand, the paint is "chalking" and it is very likely a soft or glue-bound distemper. The second test uses a wet sponge: distemper softens, smears or starts to wash off after a few wipes. Emulsion stays firm. Ordinary adhesive tape also helps: stick it to the wall, press it down firmly and pull it off sharply. If a lot of old paint comes away on it, the surface needs cleaning back.
The test results matter because a distemper layer is soft and has no cohesion. New paint will stick to it, but it only holds on that powder. As it dries the new film contracts and the whole finish starts to flake off, often within a few weeks.
Limewash tends to be harder and chalks less. Where there are one or two sound coats, thorough priming is sometimes enough. Thick, cracked or flaking layers also need to be removed.
It is worth testing in several places, at least on every wall and on the ceiling. A single flat often has a mixture: distemper on the ceiling, several coats of limewash on the walls and an oil-painted band in the kitchen.
What to decide before ordering the work
- The whole area or only parts: if the tests show distemper, it is removed from the entire wall or ceiling, not just from the areas that are flaking.
- Walls, ceiling or both: ceilings are more demanding, so decorators often price them separately. When comparing quotes, check exactly what is included.
- How the area is measured: the work is priced per m² of wall and ceiling surface, not floor area. The wall area of a flat is usually two and a half to three times the floor area. Ask whether windows and doors are deducted.
- Follow-on work: stripping is normally followed by filling, sanding, priming and painting. It is practical when the same decorator does all of it and is then responsible for the result as a whole.
- What happens if the plaster turns out poor: wetting sometimes reveals hollow or crumbling areas. Agree in advance whether the tradesperson will repair them straight away and on what terms, so the work does not stall.
- Damp and mould: if there are dark patches on the walls, find out the cause before the work starts. Unless the cause is dealt with, mould will come back under the new paint.
How the work is carried out step by step
With water-based paint, the wetting method is used almost every time. Water softens the paint, so there is no need for sanding or chemical strippers. In practice the process is as follows:
- Testing the surface: the palm, wet sponge and tape tests confirm that it is a water-based paint.
- Preparing the room: furniture is taken out or covered, the floor is covered with polythene sheeting and then with paper or cardboard that absorbs water and does not slip. The edges of the sheeting are taped down.
- Protecting the electrics: the circuit breaker for the room is switched off at the consumer unit, and sockets and switches are taped over, because water runs into them.
- Wetting: the wall is soaked with warm water using a roller, a large brush or a garden sprayer, always in small sections of roughly one to two square metres at a time.
- Waiting: the water is left to work until the paint softens, usually around 10 to 20 minutes, longer for thick layers, with repeated wetting.
- Scraping: a wide filling knife or scraper is drawn from top to bottom at a shallow angle, almost flat, without digging into the plaster. Ceilings are worked from a stable stepladder or platform, always wearing safety glasses, because wet slurry and drips containing lime fall towards the face and irritate the eyes.
- Washing down: residue is washed off with a sponge and clean water, changed regularly, until the wall no longer chalks.
- Drying: the wall dries according to temperature and ventilation, usually for at least a day.
- Checking: once dry, the wall is checked with a dry palm and the tape test. Where it still chalks, it is washed again.
Stripping is usually followed by filling cracks and holes, light sanding and priming walls and ceilings. Primer binds the surface and evens out its absorbency. These items are priced separately, but they are part of a good paint finish.
What the price depends on
The indicative labour price is €3.50 per m². However, the effort per square metre varies widely. A thin coat of distemper comes off a wall in a few minutes, while thick layers on a ceiling can take several times longer. The main factors are:
- number of layers: one thin coat of distemper comes off easily, while ten coats from different decades need repeated wetting and the job can take several times longer,
- type of paint: soft and glue-bound distemper soften quickly, limewash more slowly and sometimes needs more effort,
- ceiling or wall: ceilings are physically harder work, water drips and the work is done from a ladder or mobile tower. High ceilings in older houses add further effort,
- condition of the plaster: if wetting reveals hollow or crumbling plaster, repairs are added and charged separately,
- details: cornices, ceiling roses, mouldings, corners and window reveals are done slowly and by hand,
- empty or furnished room: an empty room is quicker and carries less risk of damage, while in a furnished room everything has to be moved and carefully covered,
- mould: affected areas need treating with a fungicidal wash and the cause of the damp has to be found. When removing mould, wear a suitable respirator, because spores are released into the air during scraping,
- plasterboard: it may only be dampened lightly, so the work is slower and more careful.
What makes the work easier and what slows it down
Apart from the wall itself, organisation makes a big difference. The work runs more smoothly when the client provides:
- access to warm water in the flat or on the same floor, so buckets do not have to be carried a long way,
- lighting from another circuit: with the room's breaker off, light is needed from an adjoining room via an extension lead from a dry circuit, or from a battery work light. It helps to know in advance which breaker serves which room,
- a place for waste: stripped paint is a wet slurry. It goes into bags together with the paper from the floor, not down the sink or toilet, where it could block the drain. For larger quantities, follow your local council's or building's rules for building waste,
- heating and ventilation: in a warm, ventilated room the wall dries faster after washing down. In a cold room without ventilation, the next stages are delayed by days,
- order of work: stripping comes before filling and painting, and also before laying a new floor, which water and slurry would damage. Finished floors need particularly careful covering.
The work is slowed down if something else is happening in the flat at the same time, for example an electrician needing power in the same room, or if the walls cannot be reached until belongings are moved out.
Common mistakes and how they show up later
Only the flaking areas stripped
It happens in practice that only the flaking areas are scraped and the rest is painted over. The new paint then sits on the old distemper and eventually peels even where the wall looked sound.
Inadequate washing down
If the wall still chalks after stripping, the primer has nothing to grip. The new paint may then peel or develop blisters over time.
Too sharp a tool or too much pressure
The scraper then gouges the plaster and creates unnecessary filling. Gouges that are not filled show through the new paint in raking light.
Impatience
Filling or painting on a wet wall leads to patchiness and poor adhesion. Moisture trapped under the paint can also contribute to mould.
Soaked plasterboard
The paper face absorbs water, swells, cockles and starts to peel. The repair is then more complicated than the stripping itself.
Underestimating water around sockets
Switching off the breaker and taping over takes a minute. Water in a socket box is a risk of electric shock and can damage the installation. The breaker is switched back on only once sockets and switches are dry. If water has got into a socket, have it checked by an electrician before switching on.
How to check the finished work
When signing off work done by a tradesperson, or checking your own work, look at the following points:
- the wall does not chalk when a dry palm is run over it,
- adhesive tape pulls away without any paint residue,
- no islands of old paint are left on the wall, particularly in corners, along skirtings and around windows,
- the plaster is not scored with deep scraper marks,
- hollow or crumbling areas are marked and agreed for repair,
- the floor, windows and door frames are clean and free of dried residue,
- sockets and switches are dry and waste has been removed as agreed,
- the wall is dry to look at and to the touch before the next stages.
Stripping old paint yourself
A capable DIYer can strip water-based paint. No chemicals or noisy tools are needed, just patience. The method is the same as for a tradesperson, as described above. For doing the job at home, a few practical points help:
- Get ready a bucket of warm water, a roller or sprayer, a wide filling knife, a sponge, polythene sheeting, absorbent paper, tape, rubble bags and safety glasses.
- Start somewhere less visible, for example behind a wardrobe, and find out how long the paint needs to soften and how much pressure on the scraper is enough.
- Do not wet more at once than can be scraped, otherwise the area dries in the meantime and has to be wetted again.
- For ceilings, use a stable stepladder or a small platform, do not lean out to the side and move the ladder more often instead.
- Keep the knife clean of slurry so that it does not smear residue back across the wall.
- Take breaks, especially on ceilings, where tired arms slip easily and the scraper digs into the plaster.
If the plaster is uneven after stripping, wall skimming gives a smooth base for painting. If you come across extensive hollow plaster, diagonal cracks running across the whole wall or widespread mould, it is sensible to call in a professional.
Frequently asked questions
Roughly €3.50 per m². The final price depends mainly on the number of layers, the type of paint, whether it is a wall or a ceiling, the condition of the plaster and the amount of detail such as cornices and window reveals.
With a single thin, sound coat it sometimes works. But if the wall chalks heavily or has several layers, the primer will not penetrate through to the plaster and the new paint will hold only on the distemper. In that case stripping is the safer option.
Usually not. Water-based paint softens when wetted and can be scraped off by hand. Sanding would create a lot of dust, and chemical strippers are intended for oil-based and gloss finishes, not for distemper.
The same way as from a wall, by wetting and scraping, but in smaller sections so that water does not run down your arms and the walls. The work is done from a stable stepladder or mobile tower, wearing safety glasses and with the floor thoroughly covered, because the slurry falls straight down.
It depends on the thickness of the plaster, the temperature and ventilation. It is usually left for at least a day, longer in a cold or damp room. After that, follow the primer and paint manufacturer's instructions.
Yes, but carefully. Plasterboard must not be soaked, because the paper face would absorb water and start to peel. It is dampened only lightly and scraped gently. Where the surface is badly damaged, it is advisable to consult a decorator.
Redecoration and wall preparation inside your own flat do not usually need consent. However, check your lease and any building rules, particularly on working hours and waste disposal, and if in doubt ask the managing agent or the freeholder.
Related work
How old oil paint is removed from walls, when sanding is enough, when to use a chemical stripper and how to prepare the wall for new paint.
When walls, ceilings or floors need priming, which primer to choose and how to apply it properly. The main types and the mistakes to avoid.
How wall and ceiling skimming works, which skim coat to choose, what makes the job harder and how to check a smooth surface before painting.
How a ceiling is skimmed step by step, which compounds suit concrete, plaster or plasterboard, how long it takes to dry and how to check the work.
How Venetian plaster is applied, what base it needs, where it suits, common polishing mistakes and how to check the finished wall.
How cracks in walls, ceilings and plasterboard are taped and filled, which tapes and fillers to use, and how to check that the repair will last.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.