Price list 2026 · Europe

Painting and decorating: cost per m² in 2026 and what it includes

Painting and decorating rates for 2026, based on the state of your walls, how much prep they need and the finish you want. Enter your measured area and see the labour cost item by item.

Updated 09/2026·17 min read·23 price list items
Standard labour price
€2.10/ m²
Indicative range
€1.68 - €2.73
60 m² flat
€351.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page
Short answer

Two coats of standard white emulsion cost €2.10 per m² for labour on the current price list. Priming, crack repairs, skim coating and coloured finishes are priced on top, depending on what your walls actually need. You can buy the paint and prep materials yourself, or the painter charges you for what gets used.

Types of work and their prices

€2.10
per m²

The standard finish for refreshing a home. Two coats are applied to a sound, prepared and primed surface.

per m²

Strong colours may need an additional coat. Colour boundaries are masked accurately and coverage is checked as work progresses.

€2.90
per m²
Ceiling painting

Working overhead takes longer and requires careful rolling to maintain an even finish, so ceilings have a separate labour rate.

€6.50
per m²

Uneven or damaged surfaces are levelled before decorating. The extent of skimming depends on the condition and flatness of the background.

per m²

The background must be smooth, dry and evenly absorbent. Pattern repeats have to align accurately between drops.

per m²

A decorative finish built up in several thin coats, then compressed and polished by an experienced applicator.

Painting work price list 2026

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Painting and decorating23 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Painting cost

Painting - basic white emulsion (2 coats)m²€2.10 / m²m²enter quantity-
Wall painting - coloured finishm²m²-
Oil-based paint application to plinthm²€7.50 / m²m²enter quantity-
Ceiling paintingm²€2.90 / m²m²enter quantity-
Acetone-based stain-blocking primer for water and nicotine stainsm²€3.80 / m²m²enter quantity-
Painting vertical heating pipeslm€3.00 / lmlmenter quantity-
Painting cast iron radiatorspcs€65.00 / pcspcsenter quantity-
Painting radiators (per section)pcs€2.40 / pcspcsenter quantity-
Wallpapering wallsm²m²-

Preparation

Scraping off old oil-based paintm²€5.40 / m²m²enter quantity-
Crack bridging and repair of large crackslmlm-
Acrylic sealing of jointslm€1.90 / lmlmenter quantity-
Priming walls and ceilingsm²€1.00 / m²m²enter quantity-
Scraping off old (water-based) paintm²€3.50 / m²m²enter quantity-
Local crack repairs and patchingpcs€3.50 / pcspcsenter quantity-
Skimming wallsm²€6.50 / m²m²enter quantity-
Skimming ceilingsm²€7.50 / m²m²enter quantity-
Venetian plaster - polished finishm²m²-
Fitting corner beadslmlm-
Removing old wallpaperm²€3.50 / m²m²enter quantity-

Project overheads

Mobile aluminium scaffold tower for high ceilingsm²€3.00 / m²m²enter quantity-

Other works

Post-work clean uphr€20.00 / hrhrenter quantity-
Other unspecified works in tradehrhr-
Total labour
- enter quantity
Create quote from price list →

How much it costs by scope

Indicative labour cost for a 60 m² flat (150 m² of walls and ceilings)
Painting only
Two coats of white emulsion to 105 m² of walls and 45 m² of ceilings
€351.00
Painting with preparation
Primer, crack repairs and acrylic sealing to junctions
Full surface refurbishment
Remove old coating, fit corner beads, skim walls and ceilings, then apply a coloured wall finish
Indicative labour total for the listed quantities. Paint and preparation materials are not included.

When to do the work

Kitchen and children’s roomroughly every 2 to 3 years
Hall and staircaseroughly every 3 to 4 years
Living room and bedroomroughly every 5 years

Types of materials and their cost

Interior emulsion
by consumption

A common breathable, quick drying finish for living spaces.

Washable paint
by consumption

A tougher finish for kitchens, halls and children’s rooms.

Primer
by consumption

Controls suction and improves adhesion.

Skim compound and reinforcement tape
by consumption

Used to level surfaces and reinforce suitable crack repairs.

Radiator paint
by consumption

A heat resistant coating for radiators and metal heating pipes.

Surface preparation step by step

01
Protecting and masking

The painter covers floors, furniture, windows and electrical fittings with sheeting and suitable masking tape. Good protection avoids damage and means less cleaning at the end.

02
Stripping old coatings

Anything loose or flaky comes off back to a sound surface. Water based distemper is usually softened first, while tougher coatings need a different approach.

€3.50/m²
03
Repairing cracks

The painter opens up cracks, fills them and reinforces them where needed. If a crack is still moving, it needs checking before any decorating.

04
Corner beads and skimming

Corner beads go on exposed edges. The painter skims where needed, sands it back and checks it under raking light.

€6.50/m²
05
Priming

Primer evens out suction and firms up the surface. Painting starts only once the drying time on the product data sheet has passed.

€1.00/m²

Method of work

  1. 01The painter checks for damp, cracks and whether the old paint is still holding.
  2. 02Floors, furniture, windows and electrical fittings get covered.
  3. 03The painter scrapes off loose material and repairs any defects.
  4. 04The whole surface gets primed and left to dry.
  5. 05Ceilings go first, then edges and wall areas.
  6. 06Each new coat goes on once the last one has dried.
  7. 07Masking tape comes off while the final coat is still wet, then the painter checks coverage under raking light.

5 common mistakes

01
Skipping the primer

Very absorbent surfaces dry unevenly, so the walls look patchy and you use more paint.

02
Painting a damp wall

Moisture trapped under the paint can cause mould, stains and paint that fails.

03
Painting over flaky old paint

The new coat adds weight to the weak layer underneath and can come away with it.

04
Filling a crack without reinforcing it

A moving crack often comes back unless someone finds the cause and reinforces the repair properly.

05
Pulling the tape off too late

Take the tape off while the final coat is still wet. That leaves a clean edge and the paint film doesn't tear.

Radiators, pipes and high ceilings

Radiators and heating pipes need proper prep and a heat resistant paint. Access equipment for high ceilings and painting heating elements are measured separately and aren't part of the wall rate per m².

Painting - basic white emulsion (2 coats)€2.10/m²
Wall painting - coloured finish
Oil-based paint application to plinth€7.50/m²
Ceiling painting€2.90/m²
Acetone-based stain-blocking primer for water and nicotine stains€3.80/m²
Painting vertical heating pipes€3.00/lm
Painting cast iron radiators€65.00/pcs
Painting radiators (per section)€2.40/pcs
Wallpapering walls

What goes into the cost of painting and why it can end up higher

A painter measures the walls and ceilings they actually paint, not the floor area of your flat. In a typical flat that comes to roughly two and a half times the floor area. In an attic with sloping ceilings, or in rooms with high ceilings, it is more. Whether windows and doors are deducted depends on what you agree, and usually only larger openings count. The reason is simple: the reveals and the edges around them take extra work.

Rolling on the paint is only part of the job. What usually decides the time and the cost is everything that happens before the painter dips the roller for the first time:

  • Condition of the walls: a sound white coat only needs a primer and a fresh coat. If old distemper is peeling or the walls are cracked, you are looking at scraping, taping cracks and skim coating.
  • A furnished flat: furniture has to go into the middle of the room, everything gets covered, and there is a proper clean-up at the end. That takes longer than an empty flat or a new build.
  • Colours: wherever two colours meet, the painter masks the line with tape and finishes it by brush. Strong shades often need a third coat.
  • Height and shape of the room: high ceilings, staircases, sloping ceilings and alcoves slow the work down and sometimes call for scaffolding or a work platform.
  • Details: reveals, corners, skirting, radiators and pipes take far more time per square metre than a plain wall.

When you compare quotes, check whether they cover only the painting or the preparation as well. Two quotes with the same rate per m² can describe completely different jobs.

The state of the walls matters more than the paint brand

Even expensive paint will not last on a badly prepared wall. That is why the wall gets checked before anyone starts painting. You can do a few simple tests yourself:

  1. Tape test: stick a piece of masking or adhesive tape to the wall, press it down firmly and rip it off quickly. If paint comes away on the tape, the old coat is not holding, and a new layer would only add weight to it.
  2. Palm test: run a dry hand over the wall. If your palm comes away with white dust, the paint is chalking. It needs to come off or be bound with a primer.
  3. Water test: dampen a small patch with a wet sponge. If the paint softens and wipes off, it is old distemper or glue-bound paint. Emulsion does not belong on top of it.
  4. Side light: hold a lamp or torch close to the wall so that the light runs along the surface. You will see bumps and dips that would stand out even more once painted.

In practice it often turns out that the stains cause more trouble than the wall itself. Water marks, nicotine, soot or grease bleed through ordinary paint, even after two coats. These spots get a coat of stain blocker first, and only then is the whole wall painted. With mould, find and deal with the cause first, which usually means damp or poor ventilation. Anti-mould paint on its own only puts the problem off for a while.

How long new plaster and skim coat need to dry

A damp surface is one of the main reasons paint peels and mould appears. New sand and cement or lime-based plaster takes weeks to dry, not days. Gypsum plaster and skim coats dry faster, but thickness, temperature and ventilation still make a big difference. The manufacturer's technical data sheet gives the drying time. Stick to it, even if your moving date is close.

Scrape off the old paint or just paint over it?

Scraping is hard work, makes a lot of mess and is not always needed. If the old white coat is holding, clean the wall, prime it and paint. Scraping makes sense when:

  • the old coat is peeling or sticks to the tape in the tape test,
  • the wall has old distemper or glue-bound paint that softens with water,
  • there are so many layers that they come off in flakes,
  • there is damp or mould under the paint.

DIY guide: how to scrape off distemper

You can remove distemper yourself. It mainly takes patience and good protection for the room. Here is how:

  1. Cover the floor and furniture with plastic sheeting, tape down the edges and switch off the circuit for the sockets and switches in the room.
  2. Wet the wall with lukewarm water and a little washing-up liquid, using a sprayer or a wide brush, and leave it to soak for a few minutes.
  3. Scrape off the softened paint with a filling knife or scraper held at a shallow angle so that it does not dig into the plaster.
  4. Wash off what is left with clean water and let the wall dry completely.
  5. Prime the dry wall, and only then move on to repairs and skim coating.

Oil-based paint, which older flats and stairwells often have as a washable lower band on the wall, does not soften with water. Sand it so that the new coat has something to grip. If it is thick or peeling, it is better to remove it. Wear a respirator when sanding old paint, because the dust can contain harmful substances. In older buildings, paint layers may contain lead, so a simple lead test before sanding is worth the effort. Some old textured wall and ceiling coatings may contain asbestos. Do not sand or scrape these until a sample has been tested, and where the law requires it, leave removal to a licensed specialist.

Cracks: when filler is enough, when you need tape and when to call a structural engineer

Not every crack is the same. Repair it the wrong way and in a few months it is back in the same place. For painting work, cracks fall into three groups:

  • Hairline cracks in the paint: tiny, stable cracks in old paint or in the surface of a skim coat. Sand them, fill them with fine filler and prime.
  • Moving cracks: these appear where ceiling panels meet in concrete panel blocks, in corners between wall and ceiling, at plasterboard joints or where different materials meet. The crack is opened up, cleaned and a reinforcing tape is pressed into the filler. Filler alone will not hold here.
  • Structural cracks: diagonal cracks running from the corners of windows and doors, cracks that keep getting wider, or cracks through the whole wall. A painter does not fix these. A structural engineer needs to look at them first, otherwise they will come back even through tape. If you live in a flat, tell the building management or owners' association too, because the problem may affect the whole building. If the engineer suggests work on load-bearing walls or floors, check with your local building authority what approval you need under local building regulations.

How a crack is taped

  1. Open up the crack with a scraper into a shallow V shape and pick out any loose material.
  2. Clean off the dust and prime the area.
  3. Apply a first layer of filler and press glass-fibre reinforcing tape into it so that it overlaps the crack on both sides.
  4. Once dry, feather out the filler so that the edge of the repair blends smoothly into the wall around it.
  5. Sand, check under side light and prime again before painting.

Acrylic caulk in joints

The joints between the wall and a door frame, window, skirting board or plasterboard often open up after painting into a thin dark line. That is why they get filled with paintable acrylic caulk, which stays flexible and takes paint. Silicone does not belong here, because paint will not stick to it. Neatly caulked joints are one of the quickest ways to tell whether a painter has taken care.

Skim coating: patch the damaged spots or do the whole wall?

A skim coat brings uneven areas, old coatings and repaired spots together into one smooth surface. You do not always need to skim the whole wall, though. For a few holes from wall plugs or small dents, a local repair is enough. A full skim coat makes sense after stripping wallpaper or tiles, on wavy old walls, on new plasterboard and anywhere light from a window hits the wall at a low angle.

For plasterboard, surface quality is graded in levels Q1 to Q4. Under an ordinary matt paint, Q2 or Q3 is usual. For walls in strong side light, under glossy paint or with dark colours, Q4 is recommended, meaning the whole surface gets skimmed. A higher level means more coats, more sanding and more time, and that shows in the price.

How a wall is skim coated

  1. Clean the wall, remove anything loose and prime.
  2. Fit corner beads on external corners to protect them and help keep the edge straight.
  3. Even out larger dips with a levelling compound first, because fine skim coat only goes on in thin layers.
  4. Apply the skim coat with a stainless steel trowel or wide filling knife in one direction, and the second coat across it.
  5. Once dry, sand with sanding mesh or paper, checking regularly under side light.
  6. Remove all the dust and prime again before painting.

How to choose paint by the facts, not the advertising

On the tin, look for two values classified under EN 13300. They let you compare paints from different brands:

  • Wet scrub resistance: classes 1 to 5, and the lower the number, the tougher the paint. For kitchens, children's rooms and hallways, class 1 or 2 suits well, because you can wash it. In bedrooms and living rooms, a higher class number is usually enough.
  • Hiding power: classes 1 to 4 at a stated coverage rate, and again class 1 covers better than class 4. A cheaper paint that covers poorly often needs an extra coat. What you save on the tin, you pay for in labour.

Strong colours, especially yellow, orange and red, cover less well than muted or dark tones. They often go over a base coat in a similar, lighter shade before the finishing coats. If you buy custom-tinted paint in several tins, mix them together before you start. There can be a slight difference in shade even between two tinting batches.

In old houses with damper walls and lime plaster, lime or silicate paint tends to work well. It lets water vapour through and resists mould naturally. It only bonds to a mineral surface, though, not to old emulsion. If you want to switch from emulsion to lime paint, the whole surface has to be scraped back.

Painting a lived-in flat and before you move in

An empty flat or a new unit goes faster. A painter can usually repaint a one-bedroom flat with sound walls in one to two working days. If scraping, taping cracks or skim coating is needed, the job stretches over several days, because each layer has to dry before the next one goes on.

If you are living in the flat, get ready beforehand:

  • Empty shelves and cupboards, and take pictures and hooks off the walls.
  • Clear space along the walls so that furniture can go into the middle of the room.
  • Agree in advance whether covering the furniture and putting it back is part of the quote.
  • Air the rooms during and after the work, but avoid draughts, which make paint dry too fast.

Paint goes on at room temperature. Manufacturers state a minimum air and surface temperature in their data sheets, usually around +5 °C. In an unheated new build in winter, painting waits until the heating is on.

Airless spraying: when it is worth it

On large areas in new builds and empty units, painters increasingly spray paint with high-pressure airless equipment. It is fast, and done properly it gives a very even finish with no roller marks. There are catches, though. Everything that should stay paint-free needs covering more carefully than for rolling. In a lived-in flat full of furniture, spraying is usually impractical. That is why painters often spray the surfaces and roll the final coat, so that small touch-ups are easier later.

Venetian plaster and decorative finishes

Venetian plaster is a polished finish built up from several very thin layers. Once polished, it looks a lot like marble. Traditional Venetian plaster is lime-based, and synthetic versions also exist. It needs a completely flat surface, practically at Q4 level, because the shine shows up every imperfection. The result depends heavily on the skill of the person applying it, and it is hard to repair in patches. Before you order, ask to see work they have actually done.

Other decorative finishes, such as concrete or stone effects or metallic paints, are just as demanding. The price per m² is much higher than for ordinary painting, because most of it is hand work and experience, not material.

How to check a freshly painted flat at handover

Look at the finished work in daylight, and then again with a lamp held to the side of the wall. Side light shows streaks and places where the paint has not covered evenly. Sort out small faults at handover, while the painter is still there and has the same paint. A later repair to one spot often shows up as a patch, which is why a complaint usually ends with the whole wall being repainted from corner to corner.

At handover, check that:

  • The paint covers evenly, with no surface showing through and no stains or patches
  • Edges between wall and ceiling and between colours are straight and clean
  • Repaired cracks and taped areas do not show through the paint
  • Joints at door frames, windows and skirting are caulked and painted
  • Windows, floors, sockets and switches are clean and free of paint drips
  • The painter has handed over leftover paint from the same batch, labelled for later touch-ups

Frequently asked questions

Two coats of standard white emulsion cost €2.10 per m² for labour according to the current price list. Prep work and specialist finishes are priced separately.

Related work

Preparation
Stripping Old Paint (Removal)

How to recognise old distemper, why it must come off before repainting and how to scrape it without damaging the plaster. Steps, mistakes and checks.

Preparation
Stripping Old Oil Paintwork

How old oil paint is removed from walls, when sanding is enough, when to use a chemical stripper and how to prepare the wall for new paint.

Preparation
Priming Walls and Ceilings

When walls, ceilings or floors need priming, which primer to choose and how to apply it properly. The main types and the mistakes to avoid.

Preparation
Wall Skimming

How wall and ceiling skimming works, which skim coat to choose, what makes the job harder and how to check a smooth surface before painting.

Preparation
Skimming a ceiling

How a ceiling is skimmed step by step, which compounds suit concrete, plaster or plasterboard, how long it takes to dry and how to check the work.

Painting
Wall Priming - Two Coats of White Paint

How walls get two coats of white paint, which paint to choose, what makes the job harder and how to check that the finish is even.

Painting
Wall Painting - Coloured Finish

How coloured wall painting is done, which paint to choose, what makes the job harder and how to check the result. Practical advice for flats and houses.

Preparation
Venetian Plaster - Polished Stucco

How Venetian plaster is applied, what base it needs, where it suits, common polishing mistakes and how to check the finished wall.

Preparation
Taping and Filling - Repairing Cracks in Walls and Ceilings

How cracks in walls, ceilings and plasterboard are taped and filled, which tapes and fillers to use, and how to check that the repair will last.

Painting
Painting Cast Iron Radiators (per section)

How a cast iron radiator is repainted, which paint to choose, what makes the job harder and how to check the finished coat.

Painting
Painting Vertical Heating Pipes

How vertical heating pipes are painted, which paint to choose, what makes the job harder and how to check the finished coat.

Preparation
Fitting Corner Beads - Vertical Edges of Corners or Around Windows

How corner beads and aluminium or PVC angle beads are fitted and filled, which type to choose, common mistakes and how to check corners.

Painting
Wallpapering Walls (Vinyl, Non-Woven, Paper)

How wallpapering is done, which type of wallpaper to choose, how to prepare the wall and how to check the finished job.

Preparation
Acrylic joint sealing

How joints, corners and cracks are sealed with acrylic before painting, when to use acrylic or jointing compound, common mistakes and checks.

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.