Building work price list: Wallpapering Walls (Vinyl, Non-Woven, Paper)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Painting cost | ||||
| Wallpapering walls | m² | €11.50 / m² | m² | enter quantity- |
| Painting - basic white emulsion (2 coats) | m² | €2.10 / m² | m² | enter quantity- |
| Wall painting - coloured finish | m² | m² | - | |
| Oil-based paint application to plinth | m² | €7.50 / m² | m² | enter quantity- |
| Ceiling painting | m² | €2.90 / m² | m² | enter quantity- |
| Acetone-based stain-blocking primer for water and nicotine stains | m² | €3.80 / m² | m² | enter quantity- |
| Painting vertical heating pipes | lm | €3.00 / lm | lm | enter quantity- |
| Painting cast iron radiators | pcs | €65.00 / pcs | pcs | enter quantity- |
| Painting radiators (per section) | pcs | €2.40 / pcs | pcs | enter quantity- |
What wallpapering involves and when it is worth it
The decorator measures and cuts the lengths and hangs them side by side so that the pattern matches and the joins are invisible. People choose wallpaper when they want a pattern or texture that paint cannot give, when they want to highlight one wall in a living room or bedroom, or when they need to disguise small imperfections in an older property. It is one of the main jobs within painting and decorating. The result depends most on the condition of the wall underneath and on choosing the right paper and paste.
A popular choice is a single feature wall, for example behind the bed or the sofa. The other walls stay painted, often with a coloured paint finish that picks up a shade from the paper. This uses less wallpaper and makes replacing it years later easier. Papering the whole room makes sense when you want a continuous pattern or a wipeable surface, for example in a hallway or a child's bedroom.
Which type of wallpaper to choose
Three types are common. They differ in appearance, durability and, above all, in how they are hung.
Non-woven wallpaper
Non-woven is a fabric made from cellulose and synthetic fibres. The paper is strong, does not stretch when hung, and is usually a paste-the-wall product. There is no need to paste the back or leave it to soak, which makes the job much simpler. Non-woven papers let water vapour through well, so they suit living spaces and new builds. In a new build, however, the plaster and skim must be fully dry, otherwise the paper may lift or stain. Many non-woven papers can be dry-stripped when you redecorate - check the label for details.
Vinyl wallpaper
These have a PVC top layer, so they are washable and more resistant to scuffing. They suit hallways, children's rooms and kitchens away from direct splashing. In a bathroom they only belong where water does not splash. Vinyl lets less water vapour through, so it should not go on walls that suffer from damp or mould. Many vinyl papers now have a non-woven backing and the paste goes on the wall. If a vinyl paper has a paper backing, the back of the paper is pasted.
Paper wallpaper
A traditional, straightforward choice for dry rooms. Paste is applied to the back, the length is folded and left to soak so that it softens. Wet paper tears easily and stretches slightly, so hanging it takes more skill. Paper wallpapers are not suitable for damp areas.
What to decide before booking the work
- Which walls and what area. Wallpapering is priced per m² of wall area, not floor area. Wall area is width times height, and larger windows and doors are usually deducted. When comparing quotes, ask how the tradesperson measures the area.
- Who buys the wallpaper. The customer usually chooses and buys the paper, while the decorator often supplies the paste. Agree this in advance so that the paste matches the paper type.
- How many rolls to buy. A standard roll is 53 cm wide and around 10 m long, so roughly 5.3 m². Some non-woven papers are also sold in widths of around 106 cm. A roll only yields as many full lengths as the room height plus allowance fits into its length. Example: with a 2.6 m ceiling and a 10 cm allowance, each length is 2.7 m, a 10 m roll gives 3 lengths and the remaining 1.9 m or so is waste. A 4 m wide wall needs 8 lengths of 53 cm, so 3 rolls. With a large pattern repeat, meaning a long distance before the pattern repeats, each roll gives fewer lengths.
- One batch. All rolls should carry the same batch number. A shade difference between batches may not show on the roll, but on the wall in daylight it appears as a stripe. It is sensible to buy one extra roll from the same batch and keep it for repairs.
- What is on the wall now. Old wallpaper, oil-based paint, cracks or damp patches change the amount of preparation and therefore the overall budget.
- What else is happening in the room. Wallpaper goes up after any work that creates dust and moisture, so after electrical work, plastering, skimming and painting the ceiling.
Wall preparation decides the result
Even attractive wallpaper looks poor on a bad surface. Every imperfection shows through, especially with thin and glossy papers.
- Strip the old paper. Paper is soaked with water and a little washing-up liquid or a wallpaper stripping solution, then removed with a scraper. With vinyl, the top layer can often be peeled off dry, and the backing paper left on the wall is then soaked and scraped off. If the vinyl will not come off dry, it needs to be scored with a perforating tool so the water can get underneath.
- Repair defects. Cracks, rawlplug holes and damaged areas are filled with filler or plaster and sanded once dry.
- Check flatness. A long straightedge or spirit level held against the wall shows larger undulations. These are evened out with a thin skim.
- Prime. A primer evens out the porosity of the wall and binds a dusty surface. It must be completely dry before hanging - the manufacturer states the drying time.
Before hanging, the wall should be smooth, clean, dry and evenly absorbent everywhere. Greasy areas in a kitchen need washing, otherwise the paste will not hold. With thin, light papers it helps if the wall is one even light shade, for example after priming and two coats of white paint. Dark or patchy repairs can show through the paper.
How wallpapering is done step by step
- Protection and isolation: the floor is covered, the circuit is switched off at the consumer unit and the faceplates of sockets and switches are removed.
- Wall preparation: old paper is stripped, defects are repaired and the wall is skimmed if needed.
- Priming of the whole area and full drying.
- Checking the rolls: the decorator checks the rolls for damage, the pattern direction and the repeat.
- Mixing the paste according to the manufacturer's instructions and leaving it to stand for the stated time.
- Plumb line: a vertical line for the first length is marked on the wall with a spirit level or laser.
- Cutting the lengths with a few centimetres of allowance top and bottom, and with a patterned paper offset according to the repeat.
- Applying the paste: for non-woven, on the wall in a strip slightly wider than one length, no more, so that it does not dry. For paper, on the back of the length, which is then folded and left to soak.
- Hanging the lengths butt-jointed with no overlap, smoothing from the centre outwards and from top to bottom, matching the pattern.
- Joins: pressed down with a seam roller, with any paste squeezed out wiped off immediately with a clean damp sponge.
- Corners: at an internal corner the length is usually turned a few centimetres round the corner and the next length starts from a new plumb line, so it stays straight even on an uneven wall.
- Trimming at the ceiling, skirting, windows and doors with a sharp snap-off knife against a metal straightedge.
- Sockets and switches: the paper is cut diagonally over them and trimmed. Power is restored only once the faceplates are back on.
- Drying at a steady room temperature, with windows closed and the heating not on full, usually for one to two days.
What affects the price
The guide labour price is €11.50 per m². It covers hanging paper on a wall that is already prepared. The wallpaper and the surface preparation are usually charged separately. The condition of the wall does not change the per m² price for hanging itself, but it adds further items to the budget.
What increases the price per m² for hanging
- Type of wallpaper: paste-the-wall non-woven is the quickest. Paper wallpaper is delicate to handle and needs pasting and soaking, so the work is slower. Heavy vinyl and textured papers need more precision at the joins.
- Pattern and repeat: a large repeat means slower cutting and matching, more waste and so more rolls to buy. Decorators often charge extra for accurate pattern matching.
- Room layout: many corners, alcoves, windows, radiators and sockets lengthen the job because every cut-out is done by hand. A room with many openings can cost tens of percent more per m² than a plain wall.
- Ceiling, sloping walls and height: papering a ceiling or the sloping walls of a loft room is slower and harder. Tall walls and stairwells need scaffolding or a taller ladder, which raises the price.
- Small area: on one small wall, setting up, travel and clearing up take about as long as the hanging itself. The price per m² is therefore higher or the tradesperson charges a minimum fee.
What is charged as a separate item
- Stripping old wallpaper: vinyl that will not come off dry, or several layers on top of each other, take much longer than a single layer of paper.
- Repairs and skimming: filling cracks and levelling uneven walls can cost as much as the papering itself, or more, on a poor wall.
- Priming: a flat, primed wall in a new build is the cheapest case, otherwise priming is added according to area.
What makes the job easier and what slows it down
- A cleared room: furniture moved at least a metre from the walls or taken out saves time. Pictures, shelves, curtains and curtain poles should be taken down beforehand.
- Wallpaper on site in time: the rolls should be in the property before work starts. If a roll is missing or has to be bought during the job, hanging stops.
- Steady temperature: the room should be at normal room temperature, and there should be no through-draughts during hanging and drying. In winter, in an unheated new build, the work takes longer or has to be postponed.
- Surrounding work finished: if the ceiling is painted or the walls are drilled after papering, the paper may get dirty or damaged.
- Water and light: the decorator needs water for mixing paste and cleaning tools, and lighting that stays on when the socket circuit is switched off.
- Appliances on the isolated circuit: check in advance what is on the circuit to be switched off, such as a fridge, freezer or router, and arrange power from another circuit.
- Radiators: the paper is either tucked behind the radiator or the radiator is taken off the wall. Removing and refitting a radiator is a job for a plumber or heating engineer and should be arranged in advance. If you are planning to paint cast iron radiators, it is sensible to do it while they are off the wall.
Typical mistakes and how they show later
A crooked first length. Room corners are rarely true, so the first length is not aligned to the corner but to a plumb line. Any deviation grows with each length, and with a patterned paper it is obvious by the end of the wall.
The wrong paste. Paste for paper wallpapers will not hold a heavy vinyl. After a few weeks the joins and top edges start to lift. It always pays to use the type recommended by the wallpaper manufacturer and to keep to the mixing ratio.
Skipping the primer. A porous wall draws the water out of the paste, the paste soaks in too fast in places and the paper later peels there.
Bubbles and creases. These come from poor smoothing or too much paste. With paper wallpaper, small bubbles often disappear as it dries, so there is no need to rush to pierce them. If a bubble remains, it is pricked with a needle and the air is pressed out.
Open joins. These appear when the paper dries too fast in a draught or with strong heating, or when a paper wallpaper was not left to soak long enough and shrank on the wall.
Ragged edges. A blunt knife tears wet paper. The blade should be snapped off often, even after just a few cuts.
Wallpaper on a damp wall. If a wall is damp or mould has appeared, the cause must be dealt with first. Wallpaper does not remove it, it only hides it, and the problem gets worse underneath. Under vinyl, mould spreads even faster and shows as stains and lifting.
How to check finished wallpapering
Inspect the work in daylight and also with a lamp shining across the wall, which reveals unevenness. At handover, focus on these points:
- the lengths are vertical and the pattern matches at eye level and at skirting level,
- the joins are tight, not lifting, and the wall does not show through them,
- there are no bubbles, creases or dried paste marks on the surface,
- the cuts at the ceiling, skirting, windows and doors are straight and clean,
- the paper is cut neatly around sockets and switches and the faceplates sit flush,
- the paper sits tight in the corners and is not lifting,
- all lengths are the same shade, with no visible difference between rolls,
- offcuts from the same batch are left with you for any repairs.
Small bubbles in paper wallpaper are best judged once dry, a day or two later. Lifting joins, on the other hand, should be raised straight away while the decorator is still nearby.
DIY guide: papering a single wall
A capable DIYer can manage a feature wall in non-woven wallpaper. The method is the same as in the step-by-step section above. Have ready a smoothing brush or plastic smoother, a paste roller, a sharp snap-off knife with a metal straightedge, a spirit level or laser, a tape measure, a pencil, a seam roller and a clean damp sponge. A standard stable stepladder is enough - for work at height, for example in a stairwell, it is better to call in a professional.
Points to watch as a DIYer:
- For a first attempt, choose a paste-the-wall non-woven paper with a small pattern or none at all. Paper wallpaper and a large repeat are more demanding.
- Before starting, switch off the circuit at the consumer unit and remove the socket and switch faceplates. Switch the power back on only once the faceplates are refitted, never with exposed back boxes.
- If you do not want the circuit off for the whole drying time, refit the faceplates straight after trimming, once the paper is pressed down well around the box, and only then restore the power.
- With long lengths, a second person helps by holding the bottom of the length while the top is lined up with the mark.
- Start on a wall without windows or sockets and leave tricky cut-outs until last, once you have had some practice.
When papering, sockets and switches are only uncovered and covered again. If back boxes need moving, replacing or adding, that is a job for a qualified electrician.
Frequently asked questions
The guide labour price is €11.50 per m². The price per m² goes up with paper wallpaper, a large pattern repeat, many corners and openings, ceilings or sloping walls, and small areas. Stripping old paper, wall repairs, skimming, priming and the wallpaper itself are usually charged separately.
A decorator can usually paper a feature wall on a prepared surface in half a day to a day. A typical room with flat, primed walls usually takes one to two days. If old paper needs stripping or the walls need skimming, add more days, because the skim and primer must dry before hanging.
Yes, if the paint is firmly bonded, not chalky and not flaking. It only needs cleaning, minor repairs and priming. If the paint rubs off on your hand, it must first be removed or sealed.
Most modern wallpapers are butt-jointed, meaning each length sits tight against the next. Overlapping is used only occasionally, for example in a corner, and leaves a visible ridge. The wallpaper label always gives the method.
Usually around one to two days, depending on the type of paper, the paste and conditions in the room. During drying there should be no draughts or strong heating in the room.
A thicker textured paper disguises small blemishes, but not larger undulations or cracks. These are levelled with filler or a skim before papering.
Wallpapering is ordinary decoration inside your flat and usually does not need consent from the freeholder or managing agent. If you are also planning larger alterations to walls or services, check the terms of your lease and ask the freeholder or managing agent in advance.
Related work
How walls get two coats of white paint, which paint to choose, what makes the job harder and how to check that the finish is even.
How coloured wall painting is done, which paint to choose, what makes the job harder and how to check the result. Practical advice for flats and houses.
How a cast iron radiator is repainted, which paint to choose, what makes the job harder and how to check the finished coat.
How vertical heating pipes are painted, which paint to choose, what makes the job harder and how to check the finished coat.
How much do painting and decorating works cost per m² in 2026? Live labour rates for walls, ceilings, preparation and a 60 m² flat example.
How to recognise old distemper, why it must come off before repainting and how to scrape it without damaging the plaster. Steps, mistakes and checks.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.