Price list 2026 · Europe

Wall Painting - Coloured Finish

A coloured wall finish costs approximately €2.80 per m² of wall area. The price depends mainly on the condition of the walls, the depth of the colour, the number of coats, the room height and whether the room is furnished.

Updated 09/2026·12 min read·9 price list items
Standard labour price
€2.80/ m²
Indicative range
€2.24 - €3.64
60 m² flat
€420.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Wall Painting - Coloured Finish

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Painting and decorating9 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Painting cost

Wall painting - coloured finishm²€2.80 / m²m²enter quantity-
Painting - basic white emulsion (2 coats)m²€2.10 / m²m²enter quantity-
Oil-based paint application to plinthm²€7.50 / m²m²enter quantity-
Ceiling paintingm²€2.90 / m²m²enter quantity-
Acetone-based stain-blocking primer for water and nicotine stainsm²€3.80 / m²m²enter quantity-
Painting vertical heating pipeslm€3.00 / lmlmenter quantity-
Painting cast iron radiatorspcs€65.00 / pcspcsenter quantity-
Painting radiators (per section)pcs€2.40 / pcspcsenter quantity-
Wallpapering wallsm²m²-
Total labour
- enter quantity
Create quote from price list →

When a coloured finish is worth it and why it is harder than white

People usually order a coloured finish when moving into a new flat or house, after a renovation or after the walls have been skimmed. It is also a popular choice when a room needs a different character without major building work. It is one of the most common jobs in painting and decorating.

The result only looks good if the surface is well prepared and the paint is applied carefully. Every flaw shows more on a coloured wall than on a white one. Uneven coverage shows. So does a filled patch that absorbs paint differently from the rest of the wall, and a band where painting stopped and started again later. White paint hides many small defects, while a strong colour makes them stand out.

A coloured finish makes sense when:

  • you want to change the feel of a room without knocking anything down or retiling,
  • you need to change how a space looks, for example to make a large room cosier or brighten a dark hallway,
  • you want a feature wall, for example behind the bed, the sofa or the dining table,
  • the walls need painting anyway, for example after skimming or after years of use.

If the walls are cracked, uneven or the plaster is crumbling, paint alone will not help. The walls need repairing or skimming first, and the paint goes on afterwards.

What to decide before ordering the work

A coloured finish needs more decisions in advance than plain white. If they are settled before the decorator arrives, the job runs smoothly without delays.

  • Which walls will be coloured: the whole room or just one wall. With a single feature wall, decide exactly where the colour ends, for example in an internal corner or on an external edge.
  • What happens with the ceiling: the ceiling usually stays white. A straight, crisp line between a coloured wall and a white ceiling is one of the most demanding parts of the job. Agree whether the ceiling is being painted too. If so, it is painted before the walls.
  • Paint type and colour: choose them according to how the room is used. Try the colour on the wall before the full quantity is mixed.
  • Who buys the paint: sometimes the decorator supplies it, sometimes the client does. If you buy it, agree the quantity with the decorator and have the whole amount tinted at once.
  • Wall area: painting is priced per m² of wall area, not floor area. For one room, multiply the perimeter by the height and deduct windows and doors. The ratio to floor area varies with room size, so it is better to measure the area properly than to estimate it.

Which paint and colour to choose

Two things matter: the type of paint and the colour. Most interior wall paints are water-based emulsions. They differ mainly in how well they cope with washing and scuffing.

  • Standard emulsions are breathable and suit living rooms, bedrooms or studies, where the walls are not touched much.
  • Washable paints have a tougher surface that can be wiped with a damp cloth. They belong in hallways, kitchens, children's rooms and next to the dining table, anywhere the walls get dirty or are touched often. Retailers often sell them as durable or scrubbable emulsions, but what matters is the wet scrub resistance class on the technical data sheet. The lower the class number, the more resistant the surface.
  • Low-VOC paints (low in volatile organic compounds), or paints with an eco label and little odour, are worth using in bedrooms and children's rooms, or where someone has allergies. Check the exact properties on the technical data sheet of the specific product.

A simple rule helps with colour: light tones make a room look larger and brighter, dark tones make it cosier but also smaller. North-facing rooms suit warmer shades, while sunny rooms suit cooler ones that balance the warm daylight. A darker or bold colour is often used on just one wall, for example behind the bed or the sofa.

A colour on a chart in the shop looks different at home. Paint a test patch directly on the wall and look at it in the morning, during the day and under artificial light in the evening. On a large area the same colour usually looks deeper and darker than on a small sample.

Think about the sheen too. A matt finish hides small irregularities in the wall better. A higher sheen is easier to clean, but in side light from a window it shows every ripple and repair.

How a coloured finish is applied step by step

A decorator starts with preparation, not paint. The process usually looks like this:

  1. Preparing the room: furniture is taken out or moved to the middle and covered with polythene, floors and windows are covered with dust sheets. Sockets and switches are masked, or their faceplates are removed after switching off the circuit at the consumer unit.
  2. Cleaning the surface of dust, grease and cobwebs, and scraping off old loose layers.
  3. Repairing the walls: filling cracks and holes, then sanding the filled areas once dry.
  4. Sealing or priming: this evens out the absorbency of the wall so the paint does not dry differently on repaired areas. On new plaster this is often done with a mist coat, following the paint manufacturer's instructions.
  5. Undercoat where needed: when going from a dark colour to a light one, on a patchy wall or on a wall with many repairs, a white coat goes on first. For deep and dark final colours, white is not used because it would reduce coverage. Instead, an undercoat tinted to a similar shade, often grey, is applied as specified by the paint manufacturer.
  6. Masking edges: where the wall meets a white ceiling or where two colours meet, the dividing line is masked with decorator's tape.
  7. First coat: corners, the edge along the ceiling and around openings are cut in with a brush, the main area is rolled. Each wall is painted in one go without a break.
  8. Second coat once the first is dry, according to the manufacturer's instructions. It evens out the colour and gives full coverage.
  9. Finishing: the tape is removed, the floor and furniture are uncovered and the socket and switch faceplates are refitted.

Why two coats? A single coat of colour almost always shows the places where the roller carried less paint. Deep and dark colours sometimes need a third coat.

What affects the price of a coloured finish

The approximate price for the labour is €2.80 per m². It applies to a standard situation: sound walls ready for painting, normal room height and two coats of paint. Two rooms of the same size can still differ a great deal in effort. The price depends mainly on the following:

  • Condition of the surface: the simplest case is new, dry, smooth skimmed walls in an empty room, for example in a new build. Old, flaking or greasy paint that has to be removed, and many cracks and repairs, add work. This is normally charged as separate items. On neglected walls, the preparation can take longer than the painting itself.
  • Colour and number of coats: a light colour covers well and two coats are enough. Changing from dark to light or the other way round, and deep colours, often need an undercoat or a third coat. A third coat means roughly half as much paint again compared with two coats. The extra labour is usually smaller, because preparation and covering are not repeated.
  • Height and access: with a normal ceiling height, a stepladder or an extension pole for the roller is enough. Stairwells and tall walls that need scaffolding or a tower make the job considerably more expensive, because the scaffolding has to be put up and working at height is slower.
  • Complexity of the surface: corners, alcoves, window reveals and sharp lines between two colours are slow work with a brush and tape. A room with many features therefore takes noticeably more effort than plain walls.
  • Decorative techniques: stripes, geometric patterns or colour gradients are different work from a standard finish and are priced separately.
  • Furnished room: having to cover and move everything adds time, especially on smaller areas.
  • Type of paint: washable and higher-quality tinted paints cost more in materials, but hardly change the labour.

When you receive a quote from a decorator, check what it includes: covering furniture and floors, repairs, sealing, undercoat, the number of coats and clearing up afterwards. Also ask whether the paint is included and how the area is measured, that is whether windows and doors are deducted.

How to prepare your home so the painting goes quickly

Apart from the condition of the walls, it also matters how the room is prepared and in what conditions the work is done. This is in the client's hands:

  • Cleared room: if you remove small items, pictures, curtains and fragile things before the decorator arrives, the work can start straight away.
  • Colour decided: if the colour is chosen on site or changed after the first coat, the work stops and sometimes has to be redone.
  • Enough paint for the whole job: if the paint runs out in the middle of a wall, the work stops until more is bought.
  • Other work finished: electrical work, chasing, skimming and the ceiling should be finished and dry. Nothing that creates dust or marks the walls should happen after painting. If the radiators and pipes are to be painted as well, agree this in advance, for example painting cast iron radiators or painting vertical heating pipes.
  • Temperature and ventilation: most interior paints need a room temperature of at least around 5 to 10 °C, and the manufacturer states the exact limit. In cold and damp conditions the coats take longer to dry. Draughts and strong direct sunlight on a freshly painted wall cause problems.
  • Space for materials and water: in a block of flats it helps if it is clear where the decorator can unload materials and where tools can be washed.

Typical mistakes and how they show up later

Problems often start during preparation rather than painting. The most common mistakes:

  • Painting over damp skim or plaster: the paint becomes patchy or peels, often only after several weeks. The surface must be completely dry before painting.
  • Skipping the sealer: repaired areas show up as duller or darker patches once dry. On a coloured wall they are more visible than on white, and another coat of paint usually does not remove them.
  • Badly prepared paint: paint that is too thick drags and leaves streaks, paint that is too thin covers poorly. Thin it only according to the manufacturer's instructions.
  • Stopping in the middle of a wall: where the paint dried and work continued later, a visible band remains. It shows most in side light from a window.
  • Paint from different batches: tinted paint can vary slightly between tins. Areas of a slightly different shade then appear on the wall. Having the whole quantity mixed at once, or boxing the tins (mixing them together) before use, helps.
  • Second coat too early: the first coat must dry as specified by the manufacturer, which takes longer in cold and damp conditions. If painted too soon, the roller lifts the coat underneath and the finish is uneven.
  • Wrong undercoat: without an undercoat, the old dark colour shows through. White under a deep colour reduces coverage. In both cases an extra coat is needed that was not planned.
  • Tape removed after the paint has fully dried: the paint tears away with the tape and the dividing line becomes jagged. Remove the tape while the paint is still slightly wet. The repair means touching up by hand with a brush.

DIY guide: what to watch out for

You can apply a coloured finish to an ordinary room yourself if you have patience and a stable stepladder. Leave tall stairwell walls and work from scaffolding to a decorator. Follow the steps described above, and also:

  1. Switch off the circuit for the room at the consumer unit before removing socket and switch faceplates.
  2. Get a medium-pile roller for smooth walls, a smaller brush for corners, a roller tray or scuttle with a grid, decorator's tape and polythene sheeting.
  3. Stir the paint thoroughly before use, even if it has only been standing for a short time.
  4. Cut in along the ceiling, in the corners and around openings only a section at a time, so the edge does not dry before you reach it with the roller.
  5. Roll from top to bottom with criss-cross strokes, always wet on wet. Load the roller evenly and remove the excess on the grid to avoid runs.
  6. Never stop in the middle of a wall. If you need a break, take it at a corner or an edge.
  7. Ventilate while the paint dries, but avoid draughts and strong direct sunlight on the fresh paint.

If socket faceplates are damaged or loose wires appear behind them, have them repaired by a qualified electrician.

How to check the finished work

Look at the wall in daylight and then shine a lamp across the surface at a low angle. Raking light shows defects that are not visible when looking straight on. When signing off the work, check that:

  • the colour is even across the whole wall, with no bands or duller or shinier patches,
  • neither the old colour nor repaired areas show through,
  • the colour matches the chosen sample and is the same on all walls,
  • corners, the areas around sockets and the line at the ceiling are fully painted and clean,
  • dividing lines between two colours are straight and crisp,
  • there are no roller fibres, drips or runs on the wall,
  • the white ceiling is not marked with wall paint,
  • floors, windows, skirting boards and furniture are clean and free of paint marks,
  • socket and switch faceplates are back in place,
  • leftover paint is stored and labelled with the colour for future touch-ups.

Frequently asked questions

The approximate price for the labour is €2.80 per m² of wall area. The final cost depends on the condition of the surface, the repairs and sealing needed, the depth of the colour and the number of coats, the room height and whether the room is furnished.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.