Price the work from the price list
Enter quantities and the price recalculates instantly. You can adjust these rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
| Insulation | ||||
| External wall insulation with polystyrene (full adhesive bond) | m² | 24,06 € | - | |
| External wall insulation with mineral wool (inc. fixings) | m² | 28,06 € | - | |
| Install ETICS system up to 20 cm | m² | 13,03 € | - | |
| Window reveal insulation (XPS) | lm | 3,00 € | - | |
| Ceiling/loft insulation | m² | 10,02 € | - | |
| Vapour barrier installation | m² | 4,00 € | - | |
| Thin-coat external render (scraped 2 mm) | m² | - | ||
| Apply fibreglass mesh to walls + adhesive | m² | - | ||
| Install PVC corner bead | lm | 1,10 € | - | |
| Install APU bead with mesh | lm | 0,80 € | - | |
| Window head drip bead | lm | 1,10 € | - | |
| Sprayed foam insulation (closed cell) | m² | - | ||
| Sprayed foam insulation (open cell up to 25 cm) | m² | - | ||
What the service includes
The scaffolding company first delivers the scaffold and erects it around the house. The crew builds it to suit the height and shape of the facade and the work planned on it. The scaffold then stays in place while the insulation crew works, and this period is charged as hire. Once the facade is finished, the company dismantles the scaffold, loads it up and takes it away.
Erection, hire, dismantling and sometimes transport may appear as separate lines in a quote. This helps you, because you can see exactly what you are paying for. A company that handles the whole job is also responsible for the scaffold. It must be stable, properly tied to the building and safe according to the relevant standards, in particular EN 12811-1 for working scaffolds.
Erecting scaffolding is a job for trained, certified scaffolders. It is work at height, and a mistake with the ties or guardrails can lead to a fall. Putting up facade scaffolding yourself is not advisable.
Which scaffold suits external wall insulation
For a building up to 10 metres, these types are the usual choice:
- Frame facade scaffolding: the standard option for houses and small blocks of flats. It goes up quickly and gives a comfortable working platform
- Tube and fitting scaffolding: suits complicated facades, bay windows, gables and unusual shapes
- Modular system scaffolding: adapts well to more complex floor plans and heavier loads
- Mobile aluminium towers: for short jobs in one spot, not for insulating a whole house
For insulation work, one requirement matters above all: the scaffold must stand at the right distance from the wall. That gap has to allow for the thickness of the insulation plus enough room to fix, sand and render comfortably. If the scaffold stands too close, there is no proper working space once the boards are on. If it stands too far away, the installers have to lean out, and both quality and safety suffer. So tell the scaffolding company in advance how thick the insulation will be.
How erection and dismantling work
For a typical family house, the process usually looks like this:
- The company inspects the house or asks for photos and facade dimensions.
- Both sides agree a date, a place to unload the material and access for the lorry.
- The scaffolders prepare the ground and set base plates and adjustable jacks so the frames stand plumb even on uneven ground.
- They build up the frames, platforms, guardrails and ladders between the lifts step by step.
- They tie the scaffold into the wall at regular intervals set by the system manufacturer.
- If needed, they fit protective netting that shields fresh render from wind and direct sun.
- They hand the scaffold over for use and explain what must not be altered on it.
- After the facade is finished, they dismantle it in reverse order, take it away and tidy the area.
On a family house, erection usually takes about one day, and dismantling takes roughly as long. A complicated shape, a slope or a cramped plot makes it take longer.
With insulation work, think about the ties. The scaffold is anchored into the wall, and the ties pass through the future insulation layer. The installers cut the boards around them, and after dismantling the holes left by the ties must be carefully filled and sealed. Otherwise these spots become cold bridges and water can get into the facade. Agree in advance who will make good these holes.
What makes the job simpler or more demanding
The amount of work, and therefore the final cost, depends on several things:
- Facade area: a larger house means more material and labour, although larger jobs often work out cheaper per square metre
- Shape of the house: straight walls are simple, while dormers, corners, balconies and gables add time
- Ground and access: a slope, a narrow street, a fence right next to the house or neighbouring buildings make erection harder
- Hire period: every extra day is charged, so a good schedule matters
- Distance: transport is usually charged by distance there and back
- Extras: protective netting, brackets to widen the platform or a hoist
Why is it worth planning the dates carefully? The scaffold stands, and you pay for it, even on days when nothing happens on the facade. Ideally the scaffolders arrive just before the insulation crew, not a week earlier.
Permits, neighbours and blocks of flats
The scaffold itself does not usually need building permission. If it extends onto a pavement, road or other public space, though, you normally need permission from the local council or municipality to occupy that space for a while. The rules vary from place to place, and the scaffolding company can often arrange this. If the scaffold reaches onto a neighbour's property, agree it with the neighbour beforehand, ideally in writing.
External wall insulation itself may fall under local building regulations. Check with your local building authority whether you need to notify them, apply for approval or nothing at all, and do this before you book the scaffold. Do not assume it is a mere formality.
In a block of flats, the owners decide on the scaffold and the insulation together, and the building management or owners' association arranges everything. Residents should be told that the scaffold will stand in front of their windows and balconies and that they need to keep their windows secure.
Typical mistakes when ordering
In practice it often happens that a customer orders scaffolding for only part of the facade, and during the work it turns out another wall needs it too. Extending the scaffold means extra transport and extra erection. So measure the whole facade and go through every wall to be insulated with the company.
The second mistake is booking too short a hire period. Bad weather, late material deliveries or illness in the crew can easily push the work back. A buffer of a few days is usually sensible.
The third mistake is comparing quotes only by the daily rate. Compare the total for erection, hire, dismantling and transport. Ask about liability insurance and the scaffolders' qualifications too. In spring and autumn companies are fully booked, so arrange a date several weeks ahead.
Checks at handover and after dismantling
When the scaffold is handed over, and after it has been taken away, check that:
- The scaffold stands plumb and the base plates sit on firm sole boards
- Ties are fitted over the full height and length and nothing moves
- Platforms are complete, without gaps and firmly in place
- Guardrails and toe boards are fitted on every working lift
- The distance from the wall matches the planned insulation thickness
- Ladder access is safe and clear
- Protective netting is firmly fixed, if it was ordered
- It is clear who will fill the tie holes after dismantling
- The area around the house is tidy and the lawn, paving and fencing are undamaged
Frequently asked questions
For facade scaffolding this is not advisable. It is work at height that should be done by trained scaffolders. If someone is injured on a scaffold you put up yourself, you as the client may be held responsible.
On a typical house it usually takes about one working day, and dismantling takes roughly as long. A complicated facade or difficult access can make it take longer.
A scaffold on your own property normally does not need separate permission. If it extends onto public space, you need the council's consent. For the insulation itself, check with your local building authority what procedure applies.
There has to be room for both the insulation and the work. If the gap is too small, the installers cannot render properly once the boards are on. If it is too large, the work is awkward and less safe.
A platform suits short jobs in one spot, such as repairing a gutter. Insulation means working on the facade for days and in several layers, so a fixed facade scaffold is more practical and safer.
Related work
Price the whole project, not just one job
In the building work price list you pick items from every trade, and NUMIQ turns them into a client-ready quote.