Price the work from the price list
Enter quantities and the price recalculates instantly. You can adjust these rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
| Insulation | ||||
| External wall insulation with polystyrene (full adhesive bond) | m² | 24,06 € | - | |
| External wall insulation with mineral wool (inc. fixings) | m² | 28,06 € | - | |
| Install ETICS system up to 20 cm | m² | 13,03 € | - | |
| Window reveal insulation (XPS) | lm | 3,00 € | - | |
| Ceiling/loft insulation | m² | 10,02 € | - | |
| Vapour barrier installation | m² | 4,00 € | - | |
| Thin-coat external render (scraped 2 mm) | m² | - | ||
| Apply fibreglass mesh to walls + adhesive | m² | - | ||
| Install PVC corner bead | lm | 1,10 € | - | |
| Install APU bead with mesh | lm | 0,80 € | - | |
| Window head drip bead | lm | 1,10 € | - | |
| Sprayed foam insulation (closed cell) | m² | - | ||
| Sprayed foam insulation (open cell up to 25 cm) | m² | - | ||
How the installation is done, step by step
The job is a chain of stages that build on each other. Each one needs suitable weather and time to dry. If one stage is rushed, the problem often only shows after the first winter.
Preparing the wall
The wall must be firm, dry and clean. The installer removes dust, grease, moss, algae and any render that crumbles or sounds hollow when tapped. Cracks and broken areas are repaired and left to dry. Absorbent surfaces, such as aerated concrete blocks or old lime render, get a primer so the adhesive does not dry too quickly. Flatness matters a lot for full-surface bonding. The notched adhesive layer is thin and cannot take up larger bumps, so an uneven wall has to be levelled first. If that is not practical, the perimeter strip and dab method is used instead.
Base profile and bonding the boards
A base profile, sometimes called a starter track, is fixed along the bottom edge. The first row of boards sits on it, and it also protects the lower edge of the insulation. The adhesive is mixed according to the manufacturer's instructions, spread on the board with a notched trowel and the board is pressed onto the wall straight away. Adhesive does not belong on the board edges. Boards are laid in a staggered bond like bricks, so the vertical joints of neighbouring rows never line up. At the corners of the house, the boards interlock in alternate rows. Around windows, boards are cut into an L shape so that no joint runs out exactly from the corner of the opening.
Anchoring, reinforcement and render
Once the adhesive has hardened, usually after one to three days depending on the weather, the insulation is fixed with façade anchors. Their number and layout come from the design or the manufacturer's fixing plan. Building height, the type of masonry and wind exposure all play a part, and edges and corners usually need more anchors. The board surface is then sanded flat. Glass fibre mesh is pressed into the fresh base coat so that it is fully embedded, with neighbouring strips overlapping by roughly 10 cm. Extra diagonal mesh patches go at the corners of windows, and corner beads with mesh go on the edges. When everything is dry, a primer is applied, followed by a thin-coat render in the chosen texture and colour.
Materials and options: what to choose
- White façade EPS is a common, proven material for most houses.
- Grey (graphite) EPS insulates better at the same thickness, so a thinner board can do the same job. It heats up more in the sun, so the scaffolding needs shade netting during installation.
- XPS or plinth EPS goes on the plinth and below ground level, where there is more water and more risk of knocks.
- Mineral wool is the alternative where fire safety requires it, or where you want a more vapour-open wall build-up. On taller buildings, fire regulations often require at least mineral wool fire barriers, and in some cases non-combustible insulation throughout.
Do not guess the insulation thickness. Your local building regulations set the thermal performance walls must reach, and a designer or energy assessor can work out the thickness your wall needs. On houses in cooler climates, something in the range of roughly 15 to 20 cm is common today. The extra material for a thicker board is usually modest, the labour hardly changes, and you cannot add more later.
It pays to use adhesive, anchors, mesh, primer and render as one system from one manufacturer. The components are tested together. If you mix brands and something fails, you may be left without a warranty.
What makes the job easier or harder
How broken up the façade is matters most. A large flat wall goes quickly. Every window, corner, bay, balcony or ledge means cutting, extra trims and more time. An older house with loose render or uneven walls needs repair and levelling before the first board goes on. The job also takes longer with:
- Scaffolding on a tall or hard-to-reach façade
- Taking down and refitting window sills, gutters, lights, satellite dishes or an air conditioning outdoor unit
- Gas pipes or a gas meter box with the main valve on the façade
- Thicker insulation that needs new, wider external window sills
Only a qualified, registered gas engineer may alter gas installations on the façade, and work on the supply connection is arranged with the gas network operator. If you smell gas during the works, leave the area and call your local emergency number or 112.
Permits, flats and grants
Whether insulating your house needs only a notification or a full permit depends on the building, its location and local building regulations. Listed buildings and conservation areas often have extra rules on how the façade may look. Check with your local building authority before you hire a contractor. In a block of flats, the owners decide on insulation together, and the work is organised by the building management or owners' association.
If you want to apply for an energy efficiency grant, find out the conditions of the current scheme in advance. Schemes usually require documents and a qualified contractor before work starts. Insulation that is already installed generally does not qualify.
Typical mistakes
- Bonding onto a dusty or loose surface. The adhesive sticks to the dust, not the wall, and the boards come loose over time.
- Full-surface bonding on an uneven wall. The board only touches the high spots and leaves cavities behind it. Air moves through them, the insulation loses its effect and strong wind can tear it off.
- Boards without a staggered bond and gaps filled with offcuts. Cracks then appear in the render along the joints. Narrow gaps should only be filled with low-expansion foam made for the purpose, wider ones with a strip of polystyrene.
- Working in unsuitable weather. Below about +5 °C the adhesive does not cure properly. In direct sun and heat it dries before the board is pressed on. The manufacturer gives the upper limit, usually around +25 to +30 °C. Rain and strong wind also cause damage.
- Too few anchors or badly placed ones. The problem only shows after a storm, especially in exposed spots.
- Missing trims and reinforcement around windows. Without diagonal mesh patches and window connection trims, the render cracks right at the window corners.
- Leaving polystyrene unrendered for a long time. Sunlight damages the board surface and the base coat then bonds less well.
How to check the finished insulation
When you take over the work, walk around the façade in daylight, ideally when the sun is low and shines across the wall, because that shows up unevenness. Check in particular:
- The render is flat, with no waves, bubbles or visible outlines of boards or anchors
- There are no cracks, especially at the corners of windows and doors
- The corners of the house and the window reveals are straight and have corner beads
- The connection to windows is made with tape or a connection trim, not just a filled joint
- The plinth is made of a water-resistant material and the base profile is straight
- Window sills project far enough, have a drip edge and shed water clear of the façade
- The render colour is even, without patches or visible joins between sections
- You have a written record from the contractor of the system used, the insulation thickness, the warranty terms and any documents for the building authority or a grant
Frequently asked questions
On a flat wall, full-surface bonding gives very good contact between board and wall and leaves fewer places where air can move. On uneven masonry, a perimeter strip and dabs is more suitable because it takes up the unevenness. The condition of the wall and the system manufacturer's instructions decide which method to use.
It is not recommended. The work is done on scaffolding at height, and the details at windows, corners and the plinth need experience. Mistakes often only show after a few years. Grant schemes also usually require a qualified contractor.
For a typical house it usually takes several weeks. The size and shape of the façade, the number of people on the scaffold and above all the weather decide. Waiting for the adhesive, base coat and primer to dry cannot be cut short without risking the quality.
Late spring and early autumn usually work well, when temperatures are steady and there is no strong heat. Summer work is possible too, but the scaffolding should be shaded with netting and work in full sun avoided. After the render goes on, it should stay dry for roughly two days.
Typical signs are cracks following the board joints, cracked window corners, bulging or hollow-sounding render and dark or damp patches. Inside, mould can appear in the corners near the ceiling. If you see signs like these, have the façade assessed by a specialist before the damage spreads.