Building work price list: U-PVC Window Head Drip Bead
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Insulation cost | ||||
| Window head drip bead | lm | €2.50 / lm | lm | enter quantity- |
| External wall insulation with polystyrene (full adhesive bond and anchoring) | m² | €25.00 / m² | m² | enter quantity- |
| External wall insulation with mineral wool (inc. fixings) | m² | €28.00 / m² | m² | enter quantity- |
| Install ETICS system up to 20 cm | m² | €13.00 / m² | m² | enter quantity- |
| Window reveal insulation (XPS) | lm | €3.00 / lm | lm | enter quantity- |
| Ceiling/loft insulation | m² | €10.00 / m² | m² | enter quantity- |
| Vapour barrier installation | m² | €4.00 / m² | m² | enter quantity- |
| Thin-coat external render (scraped 2 mm) | m² | m² | - | |
| Apply fibreglass mesh to walls + adhesive | m² | m² | - | |
| Install PVC corner bead | lm | €1.90 / lm | lm | enter quantity- |
| Install APU bead with mesh | lm | €0.90 / lm | lm | enter quantity- |
| Sprayed foam insulation (closed cell) | m² | m² | - | |
| Sprayed foam insulation (open cell up to 25 cm) | m² | m² | - | |
What a window head drip bead is and where exactly it sits
It is a plastic profile fitted to the top edge of a window opening during external wall insulation. It is needed on every insulated and rendered facade where windows or doors are set back in a reveal. When old external insulation is being repaired, it is also needed if the original bead is missing or damaged.
Water does not only run straight down a wall. At the lower edge of the window head it curls round, travels along the underside of the head reveal and reaches the window frame. Over time the render, the insulation and the joint around the frame get wet. The drip nose breaks this path, and the water falls clear of the wall.
The bead is fixed on the outer edge of the head, where the face of the wall turns into the top reveal. On this edge it replaces the standard corner bead, so the arris is also protected against knocks. The junction between the render and the window frame is handled by a different profile, the window connection bead, often called a reveal or APU bead. A well-detailed opening uses both profiles, each in its own place.
The bead is part of the external wall insulation system (ETICS) and should come from the same supplier as the adhesive, mesh and render, or at least be approved by the system supplier. If your external wall insulation is grant-funded, the installer must be certified to PAS 2030:2023 and registered with TrustMark, and the system should hold a third-party certificate (e.g. BBA). More on how this work fits into the wider job can be found in the overview of building insulation.
What needs to be decided before fitting the drip bead
The bead goes in at a set stage of the insulation work, so the questions around it should be settled before the reinforced basecoat is applied.
- Type of drip bead: exposed or concealed. The choice depends on the look of the facade and the experience of the renderer.
- System: whether the bead comes from the manufacturer of the insulation system or has been approved by them. The guarantee on the whole system may depend on this.
- Which openings: the bead belongs above every recessed window and door, including patio doors, front doors and garage doors.
- Scope of the quote: whether the contractor has included the window connection bead at the frame, or left it out.
- Who decides about the facade in a block of flats: insulation and facade repairs are usually the responsibility of the freeholder, managing agent or management company, not the individual flat owner.
If the bead is part of a larger facade upgrade, check the Planning Portal before you start: many house alterations are permitted development, but you will usually still need building regulations approval, and flats, listed buildings and conservation areas have stricter rules. Insulation on renovations in England must currently meet Approved Document L (2021 edition); the new 2026 edition (Future Homes Standard) takes effect on 24 March 2027.
Exposed or concealed drip bead
The beads are made of u-PVC, which resists moisture, the alkaline environment of fresh mortars and sunlight. Most have glass fibre reinforcing mesh already attached to the wings. They are usually supplied in lengths of 2 or 2.5 metres. Depending on how the nose looks once rendered, there are two basic types:
- Exposed drip bead has a plastic nose that stays visible after rendering. It sheds water reliably and tolerates less precise work by the renderer. It suits most houses and blocks of flats.
- Concealed drip bead has a profile hidden under the render. The drip edge is formed by the render itself, drawn along the hidden nose, so water drips off in the same way, but the edge is finer and the facade looks cleaner. It suits a modern minimalist look. It needs more accurate fixing and careful rendering, otherwise the edge will not be straight.
The bead type is best chosen in advance, ideally together with the colour and texture of the render. It should not be a random choice made on the scaffold.
How the drip bead is fitted step by step
The bead is fitted once the insulation boards are bonded, mechanically fixed and the reveals insulated, but before the full-surface reinforced basecoat. This applies whether the wall is insulated with fully bonded polystyrene boards or with mineral wool slabs bonded and anchored to the wall. The usual sequence is:
- Rasp the edge of the head flat and to a sharp corner, then remove the dust.
- Measure the length of the edge and cut the bead with a fine-toothed saw. The cut must be clean and square.
- On wider openings, join lengths with a connector or butt them tightly according to the manufacturer's instructions, never with a gap.
- Apply basecoat to both faces of the edge.
- Press the bead onto the edge and level it with a spirit level. The nose must point down and outwards.
- Embed the mesh from the wings of the bead into the basecoat and smooth it off.
- Place diagonal mesh patches at the corners of the opening, typically about 20 × 30 cm at 45°, so that cracks do not run from the corners later.
- When applying the full reinforced basecoat, lap the facade mesh over the bead mesh, usually by 10 cm.
- Once dry, apply primer and render up to the nose of the bead, not over it.
Mortars and renders are normally not applied below +5 °C, in strong direct sun or in rain. The exact conditions are given in the system manufacturer's technical data sheet.
Price of fitting a window head drip bead per running metre: what it depends on
The bead is measured in running metres along the outer edge of the head in the finished insulation, from corner to corner of the insulated reveal. This length differs from the width of the window and from the width of the structural opening, so it is worth checking which measurement the quote is based on and whether it allows for offcuts. The guide labour price is €2.50 per running metre. The final figure is mainly affected by the following:
- New facade or retrofit: this is the biggest difference. On a full insulation job, for example an ETICS system up to 20 cm thick, with scaffolding round the house, straight reveals and standard windows, the beads go in steadily with the other corner profiles and the work is cheapest. Retrofitting into an existing facade is considerably more expensive, because the old render has to be ground back, the bead fixed and the edge re-meshed and re-rendered. Repainting the area around the window is often added.
- Access and height: windows on upper floors without scaffolding mean a cherry picker or rope access. This can multiply the cost of a short length of bead.
- Condition of the head edge: uneven or crooked heads have to be straightened first. The more repair the edge needs, the more time goes into each metre.
- Width and shape of the opening: very wide openings, sliding doors and garage doors where several lengths must be joined take more work. Arched windows with flexible profiles are among the most expensive cases.
- Type of drip bead: a concealed bead needs more accurate fixing and more careful rendering, so it is usually slightly more labour-intensive than an exposed one.
- Small jobs: adding a bead above one or two windows cannot be spread over a large area. Tradespeople often charge for travel or a minimum call-out fee.
When comparing quotes, ask whether the price includes materials, corner mesh patches and the window connection bead at the frame, or whether these are separate items.
What makes fitting easier and what holds it up
- Windows and doors are installed, the frame joints finished and the reveals insulated. The bead connects to the finished window detail, otherwise the work stops and the tradesperson has to come back.
- Window frames are covered with protective film or tape so they are not soiled with basecoat.
- Enough material from the chosen system is on site. Buying more mid-job causes delays and tempts the use of a bead from another manufacturer.
- The scaffold stays up until handover, so any defects can be put right without another visit.
- The schedule allows for the weather. In frost, rain or strong sun the mortars are not applied and the work is postponed.
Work at height and on scaffolding belongs to a professional contractor. DIY fitting is therefore not recommended for this item.
Typical mistakes that only show up later
In practice, faults in this detail only appear after the first heavy rain or after the winter. Putting them right then means breaking out part of the finished render.
- Nose covered with render. The renderer takes the render over the nose and water runs along the reveal again. Once hardened, the render cannot be cleanly removed from the nose.
- Bead left out. Sometimes it is omitted to save money or through lack of knowledge. Dark patches, algae and cracks appear under the head over time.
- Short mesh lap. Hairline cracks form at the junction and frost gradually widens them.
- Bead not sitting tight on the edge. On an uneven substrate a void remains underneath. The bead can work loose or crack over time.
- Gaps at joints. Two lengths simply placed next to each other by eye are where water finds its way in.
- Nose pointing the wrong way. A bead fitted out of level, or with a nose that does not point down and outwards, does not shed water but carries it sideways to the corner of the window.
- Missing corner mesh patches. Diagonal cracks spread from the corners of the opening over time and let water into the insulation.
- Bead from outside the system. A profile that does not belong to the chosen system can put the manufacturer's guarantee on the whole insulation at risk.
How to check the finished work
At handover of the facade, it is worth going round each window individually. Ideally do this straight away, while the scaffold is still up:
- a bead is fitted above every recessed window and door,
- the nose is clear along its full length and not covered with render; with a concealed bead the render drip edge is straight and continuous,
- the edge is straight, with no waves or sagging,
- joints between lengths are tight with no visible gap,
- the bead does not sound hollow when tapped and does not move,
- there are no cracks in the render at the corners of the opening,
- the junction between render and window frame is formed with a separate window connection bead,
- after rain, the underside of the head and the window frame are not wet from running water,
- the contractor can say which system the beads come from and has stated the guarantee in the contract.
Frequently asked questions
The guide price is €2.50 per running metre. The price rises most with retrofitting into an existing facade and poor access without scaffolding, and to a lesser extent with an uneven head edge or wide and arched openings.
Yes. Manufacturers of external wall insulation systems routinely specify it for the window head detail in their technical documents. Without it, water from the facade runs to the window and onto the underside of the reveal, which damages the render and the insulation over time.
Yes, but it takes more work. The head edge has to be carefully ground back, the bead set into basecoat with mesh and the surrounding area re-rendered. New render is hard to match in colour to old, so the repair is sometimes carried out over the whole area around the window.
If appearance is not a priority, an exposed bead is simpler and forgives small inaccuracies. A concealed bead suits clean modern facades but needs an experienced renderer. Both shed water; with the concealed type the drip edge is simply formed by the render over the hidden profile.
Similar profiles with a drip nose are also used on the underside edges of balcony slabs, soffits and loggias. With balconies, larger structural movements have to be expected and movement joints dealt with, so follow the system manufacturer's recommendations.
A good-quality u-PVC profile from the system, properly embedded in the render, usually lasts as long as the insulation itself. Its life is shortened mainly by mechanical damage and incorrect installation.
Related work
How external wall insulation with fully bonded polystyrene boards is installed, which materials to choose, what to avoid and how to check the finished work.
How mineral wool external wall insulation is bonded and anchored, when it makes sense, what complicates the job and how to check the result.
How external wall insulation (ETICS) up to 20 cm is installed, when to choose EPS or mineral wool, and how to check the finished facade.
How window reveals are insulated with XPS boards, which thickness fits, how to join the insulation to the frame and facade, and what to avoid.
How a 2 mm scraped exterior render is applied, which type to choose, what makes the job harder and how to check the finished facade.
How PVC corner beads are fitted on external wall insulation and render, which type to choose, what makes the job harder and how to check the corners.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.