Building work price list: Installation of ETICS Thermal Composite System up to 20 cm
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Insulation cost | ||||
| Install ETICS system up to 20 cm | m² | €13.00 / m² | m² | enter quantity- |
| External wall insulation with polystyrene (full adhesive bond and anchoring) | m² | €25.00 / m² | m² | enter quantity- |
| External wall insulation with mineral wool (inc. fixings) | m² | €28.00 / m² | m² | enter quantity- |
| Window reveal insulation (XPS) | lm | €3.00 / lm | lm | enter quantity- |
| Ceiling/loft insulation | m² | €10.00 / m² | m² | enter quantity- |
| Vapour barrier installation | m² | €4.00 / m² | m² | enter quantity- |
| Thin-coat external render (scraped 2 mm) | m² | m² | - | |
| Apply fibreglass mesh to walls + adhesive | m² | m² | - | |
| Install PVC corner bead | lm | €1.90 / lm | lm | enter quantity- |
| Install APU bead with mesh | lm | €0.90 / lm | lm | enter quantity- |
| Window head drip bead | lm | €2.50 / lm | lm | enter quantity- |
| Sprayed foam insulation (closed cell) | m² | m² | - | |
| Sprayed foam insulation (open cell up to 25 cm) | m² | m² | - | |
What ETICS external wall insulation is and when a house needs it
ETICS stands for External Thermal Insulation Composite System. In the UK it is usually called external wall insulation, or EWI. The insulation does not hang on a frame as it does with a ventilated rainscreen facade. It is bonded and mechanically fixed directly to the external wall and protected by a reinforced basecoat and render. This work item covers insulation up to 20 cm thick, a common range for both houses and blocks of flats. It is one of several methods described in the overview of building insulation.
External wall insulation is mostly installed when an older house is being renovated, heating bills are high or mould appears in the corners of rooms. A cold wall in a corner cools the air, moisture condenses on it and mould thrives. Insulating the outside warms the inner surface of the wall, so the problem usually reduces or disappears, provided the house is reasonably ventilated. On new builds, ETICS is a standard part of the construction.
ETICS is a certified system. Each layer has a defined role and all of them should come from one manufacturer. A typical build-up is:
- adhesive mortar that holds the boards to the wall,
- insulation boards made of expanded polystyrene or mineral wool,
- mechanical fixings, that is plugs with a washer-type head,
- a reinforcing layer of basecoat with glass-fibre mesh embedded in it,
- primer and a thin-coat finishing render.
The system also includes starter tracks, corner beads and window profiles. They are not decoration. They protect edges and junctions where the render would otherwise crack. If one brand's adhesive is combined with another brand's render, the system is no longer certified and the manufacturer will usually not provide a guarantee.
When choosing an installer, it is sensible to require that the work follows the system manufacturer's installation guidance, including the rules for fixing. There is no UK national ETICS workmanship standard, but if your external wall insulation is grant-funded, the installer must be certified to PAS 2030:2023 and registered with TrustMark, and the system should hold a third-party certificate (e.g. BBA).
What needs deciding before insulating the house
Most of the important decisions are made before the scaffolding goes up. They are hard to change later.
Permissions and owners' consent
External wall insulation changes the appearance of the building. Do not assume it can go ahead without any approval. Before work starts, check the Planning Portal and your local planning authority: many house alterations are permitted development, but you will usually still need building regulations approval, and flats, listed buildings and conservation areas have stricter rules. In a block of flats the decision lies with the owners, and preparation is handled by the freeholder, the managing agent or the residents' management company. The facade is a shared part of the building, so an individual owner cannot insulate just "their" section of wall. For taller buildings, a proper design including fire safety is required, and the use of combustible insulation may be restricted.
Insulation thickness
The thickness depends on the wall material, the condition of the house and the energy performance you want to achieve. For house renovations, around 16 to 20 cm is commonly chosen today. The exact thickness should be set by a designer or energy assessor using a thermal calculation. Insulation on renovations in England must currently meet Approved Document L (2021 edition); the new 2026 edition (Future Homes Standard) takes effect on 24 March 2027. This is also useful if you intend to apply for a retrofit grant. Adding another layer of insulation over a finished facade is possible, but it is expensive and technically demanding. It therefore pays to choose an adequate thickness from the start.
Polystyrene or mineral wool
For thicknesses up to 20 cm, two main materials are used. Each suits a different situation.
Facade-grade EPS. White EPS is light, cuts easily and the boards are easy to handle. On a house with an ordinary masonry wall it is the most common choice, as described for full-surface polystyrene wall insulation. Grey graphite EPS insulates slightly better, so the same effect is achieved with a thinner board. During installation it must be shaded from direct sun, otherwise the boards can overheat and distort. Polystyrene is combustible. On taller buildings the design therefore specifies non-combustible mineral wool fire breaks, for example above windows or at each floor level.
Mineral wool. Stone wool is non-combustible, vapour-open and better at reducing noise. It suits blocks of flats, buildings with stricter fire requirements and older masonry that needs to release moisture. It is heavier, needs more thorough fixing and takes longer to install, as explained for mineral wool wall insulation with full adhesion and anchoring. Facades use boards or lamellas designed for ETICS, not ordinary loft insulation.
Plinth, render and colour
Standard EPS or mineral wool is not used on the plinth just above ground level. XPS or perimeter-grade polystyrene is used there, as it tolerates moisture and impact. Mineral wool should be paired with a vapour-open silicate or silicone render. With polystyrene the choice is wider. Silicone renders are often chosen for insulated facades because they stay cleaner and repel water.
When choosing a colour, bear in mind that very dark and saturated shades heat up strongly in the sun. System manufacturers therefore restrict dark colours on insulated facades or require special renders for them. Check the shade in the system manufacturer's colour chart, not just on a screen. The grain size of the render also matters: a fine finish shows every irregularity, while a coarser one hides small flaws better.
Windows, sills and roof
If you plan to replace the windows, do it before the insulation, not after. A new window can be properly connected to the insulation and the finished reveal will not have to be broken out later. At thicknesses close to 20 cm, details need thought. Sills must be long enough, reveals need thinner insulation, which is the subject of applying XPS to window reveals around fitted windows, and on some houses the roof overhang must be extended so the insulation is not left exposed under the eaves. Agree in advance whether new external sills, repositioning downpipes and other items will be handled by the contractor or arranged by you.
Timing
External wall insulation is installed in the warmer part of the year, ideally in spring and early autumn. Anyone who wants to fit into the season usually books a contractor well in advance.
What the quote and contract for external wall insulation should include
Quotes for external wall insulation often differ in what they include. They can only be compared when the scope is the same. The quote and contract should clearly state:
- the specific system, meaning the manufacturer and product name, type and thickness of insulation, render type and grain size,
- whether the price per m² covers labour only, or also materials, adhesive, fixings, beads and mesh,
- whether scaffolding is included, including erection, hire and dismantling,
- how the plinth, reveals, sills, fire breaks and relocation of items on the facade are charged,
- how the area is measured and how windows and doors are deducted,
- the work schedule and what happens if weather causes delays,
- staged payments, for example after bonding and fixing, after the basecoat and after rendering, not the full sum upfront,
- the length of the workmanship guarantee and the terms of the system manufacturer's guarantee,
- removal of waste and clearing up the site, with the waste passed to a carrier registered with the Environment Agency and a waste transfer note provided.
Step-by-step installation of external wall insulation
The order of steps cannot be changed and curing times cannot be cut short. On site the process usually looks like this:
- Scaffolding and removal of fittings. Scaffolding is erected and anything in the way is taken off the facade, for example downpipes, old sills, grilles or lights. Electrical items are removed and refitted only by a qualified electrician and lightning protection only by a specialist. Gas pipework on the facade is handled only by a Gas Safe registered engineer.
- Substrate preparation. The wall must be sound, dry and free of dust, moss and loose render. The installer taps the old render, knocks off hollow areas and repairs them. Larger irregularities must be levelled, because the adhesive can only compensate for them to a limited extent. Absorbent substrates are primed.
- Starter track. It must be perfectly level, because it sets the position of every following row of boards.
- Bonding the boards. Adhesive is applied around the edge of the board and in several dabs in the middle, so that it covers at least roughly 40 % of the board. Boards are laid in a staggered bond like bricks and joints must be tight. Gaps wider than about 2 mm are filled with strips of insulation or insulating foam, not adhesive. Around windows, boards are cut into an L shape so that no joint runs from the corner of the opening.
- Mechanical fixing. Fixing is done once the adhesive has hardened, usually after one to three days depending on the manufacturer and the weather. The number and type of fixings are determined by a calculation based on the substrate, building height and wind load. There are more fixings at corners and edges of the facade. Some systems or calculations require fixing through the reinforcing layer with mesh. The fixings are then set into freshly reinforced basecoat and covered with another coat.
- Rasping the polystyrene. Rasping evens out small steps between boards so they do not show under the render.
- Beads and corner reinforcement. Corner beads go on external corners, window profiles at the windows, and the corners of openings are reinforced with diagonal strips of mesh.
- Reinforcing layer. Mesh is pressed into fresh basecoat with overlaps of at least around 10 cm, without folds, in the middle of the layer.
- Primer and render. The top coats are applied only after the basecoat has cured, which usually takes several days depending on the manufacturer and the weather.
- Refitting and clearing up. Sills, downpipes and other items are fitted, junctions are sealed, the scaffolding is taken down and the site is cleared.
Throughout installation, both air and wall temperature should be at least around +5 °C. For silicate renders, manufacturers often require a higher minimum, usually around +8 °C; the exact value is given in the technical data sheet. The facade should not be worked on in strong direct sun, strong wind or rain. In summer, scaffold netting protects it.
What affects the price of external wall insulation
The guide price for labour in the price list above on this page is €13.00 per m². This is the installation price; system materials and scaffolding are often listed separately in quotes. The price is calculated from the facade area, but the same area can mean very different amounts of work. The main factors are:
- Condition of the substrate. A flat, sound wall without old coatings only needs cleaning and priming. Knocking off hollow render, levelling larger irregularities or dealing with damp or cracks is extra work that can raise the price noticeably.
- Facade complexity. Every window, corner, bay, balcony and recess means cutting boards, beads, mesh reinforcement and slower work on the reveals. A simply shaped house with few openings costs less per square metre than a complex house of the same area.
- Height and access. A low house with open space around it can be covered with simple scaffolding. A tall building, a slope, a narrow gap next to a neighbour or being unable to scaffold all sides makes the work more expensive.
- Insulation material. Mineral wool is heavier, needs more thorough fixing and is slower to work with than polystyrene, so installation is more labour-intensive.
- Insulation thickness. Within this item up to 20 cm, the labour price changes only slightly, as scaffolding, preparation and render stay the same. Thicker boards need longer fixings and more attention to details around windows and the roof.
- Relocating items on the facade. Downpipes, lightning protection, lights, air conditioning outdoor units or satellite dishes must be taken down and refitted. A large number of such items will increase the budget.
- Render type and extras. Silicone or silicate render, decorative features, fire breaks and new sills are often charged as separate items.
What makes the work easier and what slows it down
Besides the facade itself, the way the site is prepared also affects progress. It helps when the client:
- clears a strip of ground around the house for scaffolding and removes or ties back shrubs and climbing plants near the wall,
- provides a storage area for materials protected from rain and sun,
- arranges access to water and an electricity supply for the mixer and tools,
- informs the neighbours in advance if scaffolding needs to stand by the boundary or access across their land is needed,
- has an electrician and, if needed, an air conditioning engineer booked to remove and refit equipment,
- has chosen the render colour and texture before it is time to render.
The work is slowed down by late changes to colour or details during installation, delayed delivery of windows or sills, and longer periods of rain or frost when work is not allowed.
Typical mistakes in external wall insulation and how they show later
Faults in external wall insulation are usually not visible straight away. They appear after the first winter or a long wet spell.
Bonding onto a dusty, damp or unsound substrate. The system gradually detaches from the wall, sounds hollow when tapped and in the worst case is torn off in strong wind.
Adhesive only in dabs without a perimeter bead. The boards bow and their outlines show on the facade, especially in low-angle light.
Cross joints or wide joints filled with adhesive. They create thermal bridges. In winter, frost stays on them longer and later darker stripes appear on the render.
Too few fixings or fixings unsuitable for the substrate. This shows most at the corners of the building, where wind loads are highest.
Fixings set too deep or standing proud. The heads then show on the finished facade as light or dark spots.
Polystyrene left in the sun unprotected. The board surface yellows and becomes powdery. If this dust is not rasped off before the basecoat, the basecoat bonds poorly.
Mesh laid on dry polystyrene and only skimmed over. The mesh is not in the middle of the layer, the basecoat cracks and transfers the cracks into the render.
Missing corner beads and diagonal mesh at windows. Diagonal cracks grow from the corners of openings.
Rendering in the cold, in full sun or just before rain. Patches, uneven colour and hairline cracks remain.
Poorly sealed junctions with windows and sills. Water gets behind the insulation, the render below the sill stains and may fall off after winter.
How to check finished external wall insulation at handover
At handover, walk round the facade in daylight and also look along the wall at a low angle. Check:
- a flat facade with no bulges or visible board outlines,
- that fixing heads do not show through the render as spots,
- corners and reveals with straight edges and no cracks,
- window and door corners without diagonal cracks,
- that the render junction with windows, doors and sills is sealed with a flexible sealant,
- sills with sufficient overhang and a fall away from the house,
- a plinth made of suitable material and an undamaged starter track,
- a uniform render colour without patches or blotches after drying,
- that the facade does not sound hollow when tapped in several places, especially near corners,
- documentation of the system used, technical data sheets and guarantee terms,
- a cleared site and refitted downpipes, lights and other items on the facade.
If possible, ask for photos of each stage of the work, especially bonding and fixing. Once rendered, the layers can no longer be seen.
Frequently asked questions
Installation alone costs roughly €13.00 per m². The final sum depends on the condition of the substrate, facade complexity, building height and access, the type of insulation and whether the quote also includes materials, scaffolding and relocation of items on the facade.
For an ordinary house it usually takes several weeks, even with good organisation. It depends on facade complexity, the weather and the curing times between bonding, fixing, basecoat and render. There is no point in shortening these intervals.
Not in frost. Adhesive, basecoat and render need suitable temperatures not only during application but also while drying. If work runs into late autumn, the contractor will usually stop and finish in spring.
Yes, adding a second layer is possible. The new layer is bonded and fixed through the original system, which must be sound and well attached to the wall. It requires a condition assessment, longer fixings and new details at windows and the roof, so it is more expensive and demanding than choosing an adequate thickness from the start.
First find out where the moisture comes from, whether it is rising from the ground or leaking from the roof, downpipes or around windows. The cause must be fixed before insulating. Insulation on a wet wall does not solve the problem and the system bonds poorly to such a substrate. Older masonry that needs to release moisture is better suited to mineral wool.
Insulation warms the wall surfaces but does not remove moisture from the air. If the windows are replaced with airtight ones at the same time, regular ventilation becomes even more important. Otherwise moisture can condense on the coldest spots, for example around windows.
Inspect it every few years and repair small cracks or plinth damage before water starts getting behind the render. Clean it only with products suitable for the render type. Later on, the facade can be repainted or re-rendered without disturbing the insulation.
Related work
How external wall insulation with fully bonded polystyrene boards is installed, which materials to choose, what to avoid and how to check the finished work.
How mineral wool external wall insulation is bonded and anchored, when it makes sense, what complicates the job and how to check the result.
How window reveals are insulated with XPS boards, which thickness fits, how to join the insulation to the frame and facade, and what to avoid.
How a 2 mm scraped exterior render is applied, which type to choose, what makes the job harder and how to check the finished facade.
How a window head drip bead is fitted on an insulated façade, which type to choose and how to stop rainwater running back into the window reveal.
How PVC corner beads are fitted on external wall insulation and render, which type to choose, what makes the job harder and how to check the corners.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.