Building work price list: Applying XPS (Styrodur) to Window Reveals Around Fitted Windows
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Insulation cost | ||||
| Window reveal insulation (XPS) | lm | €3.00 / lm | lm | enter quantity- |
| External wall insulation with polystyrene (full adhesive bond and anchoring) | m² | €25.00 / m² | m² | enter quantity- |
| External wall insulation with mineral wool (inc. fixings) | m² | €28.00 / m² | m² | enter quantity- |
| Install ETICS system up to 20 cm | m² | €13.00 / m² | m² | enter quantity- |
| Ceiling/loft insulation | m² | €10.00 / m² | m² | enter quantity- |
| Vapour barrier installation | m² | €4.00 / m² | m² | enter quantity- |
| Thin-coat external render (scraped 2 mm) | m² | m² | - | |
| Apply fibreglass mesh to walls + adhesive | m² | m² | - | |
| Install PVC corner bead | lm | €1.90 / lm | lm | enter quantity- |
| Install APU bead with mesh | lm | €0.90 / lm | lm | enter quantity- |
| Window head drip bead | lm | €2.50 / lm | lm | enter quantity- |
| Sprayed foam insulation (closed cell) | m² | m² | - | |
| Sprayed foam insulation (open cell up to 25 cm) | m² | m² | - | |
What a window reveal is and why it needs insulating
The reveal is the strip of masonry around a window opening. It is made up of the two side reveals, the head (soffit) at the top and the area under the external sill. When a house gets new wall insulation or new windows and the reveals are left bare, heat escapes around the frame. Inside, this shows as a cold band next to the window, condensation and later mould in the corners. Insulating the reveals with XPS boards closes this weak point. The work is usually done together with external wall insulation or when windows are replaced. For wider context, see the overview of building insulation work.
The cause is a thermal bridge. Where the insulated facade turns into the window opening, bare masonry remains next to the frame with no insulation. Heat bypasses the wall insulation through it and escapes outside. The corner of the opening also has a large surface exposed to outside air, so the wall next to the window is colder on the inside than elsewhere. An insulated facade without insulated reveals is therefore considered unfinished.
Why XPS (Styrodur) is used on reveals
XPS (extruded polystyrene), often called Styrodur on site after the well-known brand, is a rigid closed-cell board. Compared with white EPS it absorbs far less water, has higher compressive strength and holds its shape better. At the same thickness it usually insulates slightly better than white EPS. Grey graphite EPS, however, performs comparably or even better, so XPS is not chosen for reveals because of its insulating value but mainly for its moisture resistance and strength. This matters on a reveal, because the area around a window tends to be wetter, for example from rain around the sill or from condensation, and a thin board on an edge must also withstand knocks.
Boards with a roughened or grooved surface suit reveals best, because adhesive and base coat bond poorly to a smooth board. A smooth board must be keyed (roughened) before bonding.
Choosing the XPS thickness for reveals
Reveals are commonly insulated with boards of about 20 to 40 mm, most often 20 to 30 mm. Thicker boards are the exception. Thickness is not a matter of preference but of how much of the window frame is visible from outside. The insulation must not cover the hardware or the drainage slots in the frame and must not stop the sash from opening. The thickness of the base coat and render that will be added to the board must also be allowed for.
Before ordering, measure how much of the frame is exposed from outside. With new windows, it is worth agreeing with the window fitters before installation that enough frame is left exposed for the insulation. This is hard to change afterwards.
What to decide before ordering the work
Many things on a reveal cannot be put right without hacking off finished work. It pays to be clear on these points:
- One contract or several: if window replacement and external wall insulation are both planned, it is best to coordinate them together. Windows, reveals and facade then join up without gaps, the work costs less and there are no disputes about who is responsible for which joint.
- External sill: after insulation the reveal becomes deeper and the old sill often does not project far enough beyond the new facade. Decide in advance whether the sill is being replaced, who will fit it and in what order, because insulation also goes under and around it.
- Shading: external blinds, roller shutters or insect screens must be coordinated with the reveal in advance. Guide rails are fixed into the finished reveal and their fixings must not damage the insulation.
- Consents: in a block of flats the facade is usually a common part of the building, so any external work must be agreed in advance with the freeholder, managing agent or residents' management company. If the reveals form part of external wall insulation or other building work, check the Planning Portal before you start: many house alterations are permitted development, but you may still need building regulations approval, and flats, listed buildings and conservation areas have stricter rules. In Scotland, changes to external walls need a building warrant from the council before work starts. Do not assume that no approval is required.
Junctions between the reveal, frame, sill and facade
Bonding the board itself is straightforward. Whether the reveal lasts and stays watertight depends on the junctions with the frame, the sill and the facade.
Junction with the window frame
A joint forms between the insulation and the frame, and this decides whether the junction stays sealed in the long term. A window connection bead (reveal bead) with a sealing strip and mesh is therefore bonded to the frame, which accommodates frame movement as temperatures change. Acrylic sealant or silicone alone will crack in this joint over time.
When a window is fitted, the joint between frame and masonry should be protected with a vapour-tight tape on the inside and a vapour-permeable tape on the outside. If these tapes are missing, insulating the reveal does not replace them and they must be added before bonding starts.
Junction with the sill
Under the external sill there is usually a void between the masonry and the sill. This is filled with a strip or wedge of XPS, which insulates this area and at the same time gives the sill a slight fall outwards. The sill is connected to the window's sill support profile, and its joints with the frame and substrate are sealed so that water cannot get underneath.
Aluminium or pressed metal sills expand with heat. The side reveals are therefore connected to the sill end caps flexibly, for example with sealing tape or system end caps, not rigidly with render. Otherwise a crack forms at this point and lets water in. The sequence of work at the sill depends on the type of sill and end caps, so the installer should know it before starting.
Junction with the facade
If the facade is insulated with an external wall insulation system (ETICS), the reveal insulation must run on continuously from the wall insulation without gaps. Any gap creates a new thermal bridge right next to the window and the reveal insulation loses its purpose. If your external wall insulation is grant-funded, the installer must be certified to PAS 2030:2023 and registered with TrustMark, and the system should hold a third-party certificate (e.g. BBA). This applies whether the wall is done with fully bonded polystyrene wall insulation, mineral wool boards bonded and mechanically fixed or a complete ETICS system up to 20 cm thick.
Applying XPS to a reveal step by step
- Checking the window: confirm that the window is firmly fixed and that the frame joint has its tapes. Missing tapes are added before bonding.
- Preparing the substrate: loose render, dust and old coatings must be removed. Absorbent substrates such as aircrete are primed.
- Cutting the boards: each surface is measured separately and the boards are cut precisely to size. Smooth boards are keyed.
- Insulating under the sill: a strip or wedge of XPS is placed in the space under the future sill and a bed is prepared for fitting the sill with a fall outwards.
- Bonding: adhesive is applied to the board, not the wall. On narrow reveal strips it is usually spread over the full surface with a notched trowel. Wider boards get a continuous perimeter band and several dabs in the middle. Boards are butted tightly together.
- Filling joints: small gaps are filled with low-expansion PU foam suitable for polystyrene and trimmed flush once cured.
- Rasping: once the adhesive has set, irregularities are rasped down and the dust is brushed off.
- Beads: a window connection bead is bonded to the frame and mesh corner beads are fitted to the side edges. The outer edge of the head gets a corner bead with a drip, so that water from the wall drips off before it can run along the reveal to the frame. Diagonal mesh patches are placed at the corners of the opening on the facade before full-surface meshing, to prevent cracks.
- Base coat and mesh: base coat is applied and glass-fibre mesh is pressed into it with overlaps, usually at least 10 cm. The mesh should sit in the upper part of the base coat, close to the surface, not pressed against the board. Once dry, a second levelling coat is applied to cover the mesh completely. The total thickness of the reinforcement layer is usually around 3 mm; the exact figure is in the system's technical data sheet. A base coat that is too thin cracks and the mesh does not do its job.
- Sill: the external sill is fitted, its joint with the frame is sealed and the end caps are connected flexibly to the side reveals.
- Finish: after the required curing time the surface is primed and render is applied. Outside this is a facade render matched to the insulation system, inside a standard interior plaster finish.
Cost of insulating reveals with XPS per running metre and what affects it
The guide price for labour is €3.00 per running metre. The length of the reveals is measured, so for a 120 x 150 cm window that is roughly 1.5 + 1.5 + 1.2 m, or 4.2 running metres, if the area under the sill is not counted. When comparing quotes, ask which sides the contractor includes. The final figure is then affected by these factors:
- Reveal depth: the price per running metre assumes a typical reveal depth. A deeply recessed window has much more surface per metre to bond and mesh, and the work becomes considerably more expensive.
- Substrate condition: flat, sound render is the cheapest case. Loose or damp old render must be hacked off and the substrate made good, which adds separate work and often drying time.
- Height and access: a ground-floor window is done from the ground. Upper floors need scaffolding or a powered access platform. If the facade contractor's scaffold is not already up, erecting scaffolding or hiring a platform can cost as much as the whole reveal job.
- Reveal shape: crooked, uneven or rounded reveals with many cuts take longer. Arched windows and non-standard shapes are often priced separately.
- Exposed frame: when only a thin board will fit, cuts must be very precise and work is slower.
- Sill and frame tapes: insulating under the sill, replacing a damaged sill and adding missing tapes at the frame are usually separate items beyond the reveal itself.
- Materials: system connection beads, drip beads, sill end caps and facade render from the same system as the insulation cost more than the most basic option, but they are what determines durability.
- Number of windows: one window needs the same preparation and curing time as ten. For small jobs the price per running metre therefore tends to be higher.
Preparing so the work is not held up
Part of the job can be influenced by organisation before the installer arrives.
- Provide access to the windows from inside and outside. Move furniture away from the windows and take down curtains and plant pots from the window boards.
- Remove insect screens in advance and agree who will take down external blinds, roller shutters or the old sill.
- With new windows, schedule the reveals only after the window installation is finished. If window fitters and facade installers take turns on the same window, they get in each other's way, and bonding cannot start until the window is complete.
- If the facade is being done, agree the sequence with the facade contractor so the scaffold is up when the reveals are being done.
- Order a new sill in good time so it is on site when it needs to be fitted.
- Choose the render colour and texture in advance. Waiting for a decision holds up the whole final stage.
- Arrange access to water and electricity, and a place to store boards dry and out of the sun.
- Allow for the weather. In rain, frost or strong sun the work is postponed, so it is sensible not to schedule it tightly before another commitment.
- Expect the window to remain unfinished between coats for several days. Windows should not be left wide open for long during this time, so that fresh coats are not damaged.
Typical mistakes and how they show up later
Bonding to a dusty, damp or flaking substrate. The board is held only by a weak layer and comes away with it. This often shows after the first winter as a hollow sound when tapped, and later as a crack around the board's edge.
Unsuitable adhesive or foam. Adhesive not intended for XPS will not hold on a smooth, non-absorbent board. Solvent-based foam attacks the board and leaves sunken areas in the joints.
Mesh badly embedded in the base coat. If the mesh is just laid on the board or the base coat is too thin, the mesh does not work and the surface cracks. Typically hairline cracks appear along the full length of the reveal or the mesh shows through.
Missing diagonal patches at the corners. The corner of the opening is the point of highest stress. Without a patch, a diagonal crack will eventually run out from it into the facade.
Frame joint finished with sealant only. The frame moves as temperatures change and sealant without a connection bead cracks. Water then gets into the joint, the insulation gets damp and a damp patch appears next to the window inside.
Head without a drip. Water from the wall runs over the edge of the head onto the reveal and down to the frame. Dark streaks appear on the render and the frame joint is constantly wet.
Uninsulated space under the sill. A thermal bridge remains under the sill and inside there is a cold band along the bottom edge of the window. If the fall is also missing, water sits on the sill and gets underneath.
Sill end caps rendered in rigidly. The sill expands with heat and cracks form at the end caps. Water gets through them into the side reveal and the render starts to flake.
Short sill. If the old sill does not project beyond the new facade, water runs down the render below the window and leaves dark streaks.
Working in frost, rain or direct sun. The adhesive and base coat do not cure properly. The surface becomes powdery, cracks or later flakes off.
Shortened intervals between coats. Render on a damp base coat can become patchy, crack and fail to bond.
Wrong board thickness. A board that is too thin only finishes the reveal visually; the thermal bridge remains and condensation keeps forming around the window in winter. A board that is too thick covers the drainage slots in the frame, so water collects in the window profile, or the sash rubs against the insulation when opened.
DIY guide: insulating the reveal of a ground-floor window
DIY work only makes sense on windows that can be reached from the ground or a stepladder, or from a low, stable platform. Leave work at height, sill replacement and the junction with a whole new facade to a contractor. The method is the same as the professional work described above. For a DIYer, these principles matter most:
- Start only when the connection tapes are on the frame and the substrate is sound and dry. Otherwise leave the job to a professional.
- Buy adhesive, base coat, beads and render from one system and follow their technical data sheets. Work within the temperature range stated by the manufacturer, usually about +5 to +25 °C, out of rain and direct sun.
- Mask the frame, glass and sill with protective tape so they are not soiled with adhesive and render.
- Cut boards ideally with a hot-wire cutter and dry-fit each piece before bonding. Check that the sash opens and the drainage slots stay clear.
- Do one window at a time until the method is mastered, and keep to the intervals between coats even when the surface looks dry.
- Press the mesh into fresh base coat with a trowel from the centre outwards until it is only faintly visible, then cover it with the second coat.
How to check a finished reveal
- the boards do not sound hollow when tapped and are not lifting anywhere,
- the mesh is not visible anywhere and the surface has no cracks, including at the window corners,
- edges are straight, protected by a corner bead and free of chips,
- there is a drip on the head and water drips off the edge rather than running down the reveal,
- the joint with the frame is clean, has a connection bead and no gaps,
- the window opens freely and the insulation does not cover the hardware or drainage slots,
- the reveal insulation runs on continuously from the wall insulation,
- the sill falls outwards, projects beyond the facade and sheds water away from the wall,
- the sill end caps are connected to the side reveals flexibly and without cracks,
- ask what reinforcement layer thickness and materials were used, and have this recorded in the handover document,
- the frame, glass and sill are not soiled with adhesive, foam or render,
- the running metres invoiced match the actual length of the reveals, which can be measured independently.
Frequently asked questions
The guide price for labour is €3.00 per running metre. The final figure depends mainly on reveal depth, substrate condition, the need for scaffolding, window shape and whether frame tapes need adding or the sill needs attention. When getting a quote, check which sides of the window are included in the running metres.
The actual work on a typical window takes a few hours in total, but because of the intervals between coats it is spread over several days. At room temperature the adhesive usually needs at least one to two days before rasping and meshing, and the reinforcement layer often longer before rendering, depending on the system. In colder weather everything takes longer. The technical data sheet for the specific adhesive and base coat is always what counts.
No. Both terms refer to the same part of the wall around the window opening. The side surfaces are the reveals, the top is the head or soffit, and the whole is sometimes loosely called the window surround.
On narrow reveals the boards are usually only bonded. A fixing would be hard to install there and could damage the frame or the edge of the masonry. Mechanical fixing is more relevant on wide areas and weaker substrates, in line with the system manufacturer's instructions.
Yes, but an external solution is better in terms of building physics. Internal insulation is used where external work is not possible, for example on a listed building or in a conservation area. In that case the vapour control layer must be detailed carefully, otherwise there is a risk of condensation within the wall.
Minor damage can be repaired locally: clean the area, re-bond the board if needed and renew the base coat and mesh. If a large section is coming away, it is usually more sensible to remove the reveal insulation and redo it on a sound substrate. If the crack runs from a sill end cap, the flexible connection must also be repaired, otherwise the crack will return.
Related work
How external wall insulation with fully bonded polystyrene boards is installed, which materials to choose, what to avoid and how to check the finished work.
How mineral wool external wall insulation is bonded and anchored, when it makes sense, what complicates the job and how to check the result.
How external wall insulation (ETICS) up to 20 cm is installed, when to choose EPS or mineral wool, and how to check the finished facade.
How a 2 mm scraped exterior render is applied, which type to choose, what makes the job harder and how to check the finished facade.
How a window head drip bead is fitted on an insulated façade, which type to choose and how to stop rainwater running back into the window reveal.
How PVC corner beads are fitted on external wall insulation and render, which type to choose, what makes the job harder and how to check the corners.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.