Double Standing Seam Roofing/Folded Roofing - Pitched (Gable) Roof

Double standing seam roofing is a metal roof made of long trays joined by folding their edges together. The guide price is €19.00 per m² of roof area, driven mainly by roof complexity and material.

Updated 09/2026·12 min read·9 price list items
Standard labour price
€19.00/ m²
Indicative range
€15.20 - €24.70
60 m² flat
€2850.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Double Standing Seam Roofing/Folded Roofing - Pitched (Gable) Roof

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Roof plumbing and sheet metal9 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Roofs and coverings cost

Lock seam / standing seam metal roof coveringm²€19.00 / m²m²enter quantity-
Timber roof truss installation (load-bearing structure)m²m²-
Install battening for tiled roofm²m²-
Install counter-batteningm²€3.90 / m²m²enter quantity-
Install vapour barrierm²€2.90 / m²m²enter quantity-
Cladding facade - standing seamm²€20.00 / m²m²enter quantity-
Install PVC waterproofing membrane (flat roof)m²m²-
Spark test PVC membrane (flat roof)m²m²-
Lay ceramic/concrete tile coveringm²€30.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

What standing seam roofing is and when it suits a pitched roof

Each sheet, usually called a tray or pan, runs in one piece from the eaves to the ridge. Adjacent trays are joined by folding their edges into each other to form an upright joint, the standing seam. The sheet is never pierced. It is held down by concealed clips. There are no visible screws or sealing washers on the roof surface that could age and start to let water in. This work is part of sheet metal works, together with gutters, flashings and cladding.

Homeowners usually consider this roofing in these situations:

  • new builds, where a clean roof line without visible fixings is wanted,
  • re-roofing, for example replacing worn-out metal sheets, fibre cement sheets or tiles on a roof structure that can no longer carry a heavy covering,
  • low-pitched roofs, where tiles cannot shed water reliably,
  • curved and complex shapes, where tiles or ordinary profiled sheeting are hard to lay well.

A gable roof has two slopes that meet at the ridge. The trays run at right angles to the eaves, so each tray covers the full length of the slope without a cross joint. Fewer joints mean fewer places where water could get in.

What needs deciding before you place the order

With standing seam roofing, many decisions are made before the roofer climbs onto the roof. Late changes are expensive, because the trays are ordered or roll-formed to exact lengths.

  • Material and colour of the sheet, together with gutters, downpipes and flashings.
  • Seam system: traditional double lock standing seam or a click (snap-lock) system. The section on materials below explains when each one is suitable.
  • Roof build-up: whether there is continuous boarding, a ventilated void and a breather membrane under the metal, or whether these need adding.
  • Penetrations and accessories: rooflights, roof access hatch, chimney, soil vent pipe, aerial, snow guards and, where needed, walkways for chimney sweeps. The list should be finished in advance so that all of them are allowed for when the trays are set out.
  • Approvals: when replacing the covering on an existing house, check with your local authority's planning and building control departments beforehand what applies to your property. Planning permission and building regulations approval are separate, so check the Planning Portal before you start: you may still need building regulations approval even where the work is permitted development, and flats, listed buildings and conservation areas have stricter rules. In Scotland, changing roofs and other structural elements needs a building warrant from the council before work starts. In a block of flats, decisions about the roof are made by the freeholder or the management company.

If re-roofing reveals that rafters need repairing or the roof structure needs other work, this concerns the load-bearing structure. The extent of the repair should be assessed by a professional, such as a structural engineer or a carpenter, not judged by eye by the roofer. New or altered roof rafters should be designed by an engineer to Eurocode 5 (BS EN 1995-1-1) with the UK National Annex. A lightning protection system removed during re-roofing should be reconnected and tested afterwards by a qualified lightning protection specialist.

The roof build-up it cannot work without

The metal is only the top layer. Most problems that appear after some years do not start in the metal but beneath it. A typical build-up of a pitched roof over a warm, insulated loft room looks roughly like this, from the bottom up:

  • vapour control layer on the room side, which stops moist indoor air from getting into the insulation,
  • thermal insulation between the rafters, and possibly also below or above them,
  • breather membrane over the rafters,
  • counter battens, which create a ventilated void,
  • continuous boarding of timber boards or sheet material such as OSB, as required by the roofing manufacturer,
  • structured separating underlay and finally the standing seam covering.

Why does ventilation matter so much? Metal cools quickly at night and condensation forms on its underside. If air does not move beneath the boarding, the timber gets damp and loses strength. The ventilated void needs an air inlet at the eaves and an outlet at the ridge, otherwise it does not work.

The minimum pitch depends on the specific system and is stated by the manufacturer in its technical literature. Double standing seam can cope with low pitches, commonly from about 3° with sealing tape in the seam. Without tape, manufacturers usually require a steeper pitch. The flatter the roof, the more precise the seaming must be and the more the details matter.

Tray length is also important. Metal expands and contracts with temperature changes, and on a long tray this can amount to several millimetres. Beyond the length set by the manufacturer (for steel often around 10 to 13 m), the slope should be divided by a stepped cross joint or another expansion detail. On a typical house this mainly affects very long roof slopes.

Material and system: what to choose and when

In practice three materials are mainly used:

  • coated galvanised steel, the usual choice for houses, available in a wide range of colours,
  • aluminium, light and corrosion-resistant, suitable for damp, coastal or industrial environments,
  • titanium zinc, a material with a natural patina and a long service life, popular on historic and architecturally demanding buildings. It needs an experienced roofer to work it.

Take care when combining metals. Water running off copper onto zinc or galvanised steel causes corrosion, which first shows as stains and later as holes in the sheet. Gutters, flashings and accessories should therefore be made of a material that is compatible with the roofing itself.

Besides the traditional seam folded on the roof, there is also a click system. The trays snap together without seaming, so installation is quicker. It suits simpler roofs with steeper pitches, and manufacturers usually allow it from about 15°, with the exact value given in their literature. Low pitches, curves and complex shapes generally call for traditional double standing seam. The same technique can also be used on walls, for example as angle standing seam facade cladding, if you want the roof and walls to look like one whole.

Installing standing seam roofing step by step

From the ground the roof looks simple, but whether it stays watertight for years depends on the accuracy of each step. On a gable roof the sequence is usually as follows:

  1. Checking the substrate. The continuous boarding must be flat, dry and firm. The roofer also checks the breather membrane and the ventilated void beneath the boarding.
  2. Gutter brackets. These are often fixed when the boarding goes on, or recessed into it so they do not create bumps under the metal. If not, the roofer fixes them before laying the covering.
  3. Separating layer. A structured underlay or another layer specified by the manufacturer is laid over the boarding. It separates the metal from the timber and drains away condensation that forms under the sheet.
  4. Eaves edge. The eaves flashing is fixed so that water from the roof runs straight into the gutter.
  5. Preparing the trays. The trays are cut to the length of the slope. Long trays are often roll-formed on site, so there are no cross joints on the roof surface.
  6. Fixing with clips. Each tray is fixed to the boarding with fixed and sliding clips concealed in the seam. Fixed clips hold the tray in one place, sliding clips allow it to expand and contract with temperature changes. For shorter trays, roughly up to 10 m, the fixed zone is usually at the ridge, for longer ones at mid-length so the metal can move in both directions.
  7. Seaming. The edge of the next tray overlaps the previous one and the joint is folded with hand tools or a seaming machine. A double seam is folded twice, so the joint stays watertight even under snow and standing water.
  8. Details. Next come the ventilated ridge, verge flashings, valleys, chimney flashing, wall abutments and penetrations.
  9. Snow guards. Snow slides quickly off smooth metal, so snow guards are fitted to protect the gutters and people below.

Price per m²: what it depends on

The guide labour price is €19.00 per m². This refers to the roof area, not the footprint of the house. On a gable roof the roof area is larger than the floor area it covers, and the steeper the roof, the bigger the difference. The final price on a particular roof is affected by these factors:

  • Roof complexity. Every valley, dormer, chimney or rooflight means a detail made by hand. A simple gable roof without penetrations is the cheapest option. A roof with dormers and several chimneys can be noticeably dearer per m², because the details take more time than the plain area.
  • Pitch. A low pitch requires more careful sealing of the seams, sometimes with sealing tape. A very steep roof slows the work, because the roofer can only move around on it with fall protection.
  • Height and access. Scaffolding, edge protection and getting long trays up onto the roof. A tall house, a narrow plot or a roof next to a neighbouring building all add cost.
  • Condition of the substrate. Re-roofing often involves replacing boarding, adding ventilation or repairing the roof structure. These items are usually priced separately and on old roofs can make up a large share of the budget.
  • Material. Titanium zinc and aluminium are worked differently from steel and need more experience, so labour for them is usually dearer than for galvanised steel.
  • System. A click system is installed faster than a traditional seam folded on the roof, so on a suitable roof the labour costs less.
  • Stripping and disposal of the old covering. If an old covering is being replaced, stripping and disposal are additional items. Asbestos cement roofing is subject to special rules under the Control of Asbestos Regulations 2012 and its removal should be carried out by a contractor competent in asbestos work. In homes built before 2000, have suspect materials tested before work starts; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.

When comparing quotes, check whether the price includes the separating underlay, flashings to details, the ventilated ridge, snow guards and scaffolding, or whether these are separate items.

Preparing the site: what speeds the work up and what holds it back

How well the site is prepared also affects progress. It helps when:

  • there is room for a vehicle carrying long trays to reach the house and a flat, dry area to store the sheets,
  • there is space next to the house for a roll-forming machine and a power supply for tools,
  • rooflights, the access hatch and other penetrations have been bought and their positions agreed before the trays are set out,
  • removal of waste from the old roof is arranged, for example with a skip. Check that the carrier is registered with the Environment Agency and ask for a waste transfer note,
  • the carpenter, roofer and, where needed, chimney sweep have their dates coordinated so the boarding is not left unprotected for long.

Rain and strong wind, on the other hand, lengthen the job, because long metal trays cannot be handled safely on the roof in those conditions. Boarding that gets wet must dry out before the covering is laid. In winter the work also slows down because some materials, especially titanium zinc, are harder to bend at low temperatures and manufacturers set working conditions for them. Changes of mind during installation, such as adding a rooflight later, mean reworking trays already laid.

Mistakes that only show after years

  • Metal fixed rigidly. Without sliding clips, or with the fixed zone in the wrong place, the tray cannot expand freely. The surface ripples badly, cracks loudly with temperature changes and the seams are put under strain.
  • Missing ventilation. Moisture stays under the metal and the boarding starts to rot. This cannot be seen from outside until the roof begins to give underfoot or stains appear on the loft ceilings.
  • System unsuitable for the pitch. A click system or single seam on too flat a roof lets water in under snow and wind.
  • Careless details. Leaks are almost always at a valley, a chimney or a wall abutment, not on the plain roof area.
  • Missing separating layer where the manufacturer requires it, especially with titanium zinc.
  • Overlong trays without expansion detail. On trays longer than the manufacturer allows, the movement of the metal concentrates at the ridge and eaves details, which tear or deform.
  • Cutting with an angle grinder on the roof. Hot swarf burns into the coating and later turns into rust spots. The metal should be cut with shears and any swarf removed from the surface straight away.
  • Forgotten snow guards, which are harder to fit afterwards.

How to check the finished roof

At handover, inspect the roof from the ground and from the scaffolding while it is still up. Check that:

  • the seams are straight, parallel and evenly folded along their full length,
  • there are no visible screws, dents or scratches on the surface,
  • no swarf or rust spots from cutting are left on the metal,
  • the surface does not ripple badly, even in sunshine. Slight waviness between the seams, visible mainly in low-angled light, is normal for standing seam roofing and is not a defect in itself. Pronounced bulges, dents along the seams or loud cracking with temperature changes are a problem,
  • the eaves edge directs water into the gutter and the gutter falls towards the downpipe,
  • the ridge is properly ventilated and the air inlet at the eaves is protected by a mesh,
  • valleys, the chimney and wall abutments are flashed without gaps and not sealed with mastic where there should be metal,
  • snow guards are fitted as designed,
  • there are no damp patches or stains in the loft after the first heavy rain,
  • the contractor has handed over the material details, the manufacturer's guarantee terms and maintenance recommendations.

Frequently asked questions

The guide labour price is €19.00 per m² of roof area. The final price depends mainly on roof complexity, the number of details, pitch, height and access, the condition of the boarding and the chosen material.