Building work price list: Laying and Installation of Clay/Concrete Tile Roofing
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Roofs and coverings cost | ||||
| Lay ceramic/concrete tile covering | m² | €30.00 / m² | m² | enter quantity- |
| Timber roof truss installation (load-bearing structure) | m² | m² | - | |
| Install battening for tiled roof | m² | m² | - | |
| Install counter-battening | m² | €3.90 / m² | m² | enter quantity- |
| Install vapour barrier | m² | €2.90 / m² | m² | enter quantity- |
| Cladding facade - standing seam | m² | €20.00 / m² | m² | enter quantity- |
| Lock seam / standing seam metal roof covering | m² | €19.00 / m² | m² | enter quantity- |
| Install PVC waterproofing membrane (flat roof) | m² | m² | - | |
| Spark test PVC membrane (flat roof) | m² | m² | - | |
When a tiled roof is laid and what the work includes
A new tiled roof is needed on a new build, when the old covering is replaced during a renovation, or when a loft is converted or an extra storey is added. The roofer does more than lay tiles across the main slope. The job also covers verges, the ridge, valleys and the junctions with the chimney, roof windows and other penetrations.
A plain, open roof slope is routine work for an experienced gang. Whether the roof stays watertight for decades depends mainly on what lies beneath the tiles and on the details. When comparing quotes, check exactly what the price includes: only laying and fixing tiles on the main slope, or also battening, the ridge, verges, accessories and coordination with the sheet metal worker or leadworker.
Clay or concrete tiles: which to choose
Clay tiles are made from fired clay. Correctly installed, they last for decades and keep their colour for a long time. Glazed versions have a smoother surface, so water runs off faster and moss finds it harder to take hold. Manufacturers also make lightweight clay tiles for older or weaker roof structures.
Concrete tiles are made to very consistent dimensions, so they can be laid quickly and evenly. They are strong but usually heavier, so the roof structure must carry their weight comfortably. Flat interlocking profiles with a simple shape are a popular choice on modern houses.
Clay tiles weigh roughly 30 to 50 kg per m² depending on the model, and lightweight versions less. Concrete tiles tend to sit at the upper end of this range or above it. Metal roofing weighs only a few kilograms per m². The exact weight is given on the technical data sheet for the specific tile, and the roof structure is assessed against it.
When choosing, compare three main points:
- the weight of the covering and whether the roof structure can carry it (on a renovation it is sensible to have the roof checked by a structural engineer, and new or altered rafters should be designed to Eurocode 5 (BS EN 1995-1-1) with the UK National Annex),
- the minimum roof pitch the manufacturer specifies for that tile,
- appearance and how the roof will fit in with the surrounding buildings.
Some homeowners consider standing seam metal roofing as an alternative. It is lighter and copes with lower pitches. With a correct build-up of insulation and deck, the difference in rain noise is small, but the roof looks quite different from a traditional tiled one. Similar metal systems are also used on walls, for example as angle standing seam facade cladding.
What must be in place before the tiles are laid
Tiles are only the top layer of the roof. If something underneath is wrong, even a good tile will not save the roof. Before laying, the following build-up should be ready:
- the roof structure, meaning the timber rafters or trusses treated against insects, fungi and moisture,
- an underlay, usually a breathable membrane, which catches wind-driven rain that gets under the tiles and carries it to the gutter, and which should be suited to the wind zone under BS 5534,
- counter-battens, which create a ventilated gap between the membrane and the tiles,
- roof battens set at the gauge given on the data sheet for the specific tile,
- a raised eaves batten or tilting fillet, which supports the first course so it sits at the same angle as the courses above,
- a ridge batten set at the height required by the ridge tiles and clips of the chosen system,
- in a habitable loft, insulation between the rafters and a vapour control layer on the room side.
Every tile model has a precisely defined batten gauge. A deviation of just a few millimetres means the tiles will not interlock properly, gaps appear and the roof starts to leak. The gauge is therefore always set out to the manufacturer's figures, never by eye.
Ventilation is just as important. Air moving under the tiles from eaves to ridge carries moisture away. If the ventilation gap is missing or too shallow, moisture condenses, the roof timbers get damp and the insulation loses its effectiveness.
Standard interlocking tiles are usually laid on roofs pitched above roughly 22°. There are models and details with additional waterproofing and seals for lower pitches. The exact limit is always set by the manufacturer of the specific tile.
What to decide before placing the order
The roofer needs to know the exact tile model before battening starts, because the batten gauge and the height of the eaves and ridge battens depend on the specific tile. Clarify the following in advance:
- tile model, colour and finish: changing the model later can mean re-battening the roof,
- accessories from the manufacturer's system: ventilation tiles, verge tiles or a dry verge system, ridge tiles, soil vent and aerial outlet tiles,
- snow guards: whether you want them and how many, the number is determined by calculation,
- access for the chimney sweep: walkways, roof steps or safety hooks if the chimney is reached over the roof,
- roof windows and their position: a window fitted after the tiles are laid means stripping part of a finished slope,
- who does the flashings and the guttering: the same firm, or two firms that need to coordinate,
- material quantities: the number of tiles and accessories comes from a laying plan or take-off from the manufacturer or merchant. Tiles are usually ordered with an allowance of around 5 to 10 % for cuts and breakages.
Before replacing the roof covering on an existing house, check with your local authority's planning and building control departments whether any approval or notification is needed. This matters especially if the appearance, the material or the structure changes, or if the property is listed or in a conservation area. Planning permission and building regulations approval are separate, and in Scotland changing roofs or other structural elements needs a building warrant from the council before work starts. In a block of flats, decisions about the roof are made with the freeholder, the managing agent or the residents' management company.
How tiles are laid step by step
The first step is measuring. The roofer sets out the whole slope so that there are as few cuts as possible and the courses finish neatly at the verges and the ridge.
- Measuring and setting out: the roofer measures the roof and works out the number of courses and columns of tiles from the cover width and gauge of the model.
- Eaves: gutter brackets and the eaves trim are fitted before the tiles. The underlay is dressed onto the eaves trim so that water runs off it into the gutter. The gutters themselves are often hung after the tiles are laid.
- Checking the battens: the batten gauge, the height of the raised eaves batten and the position of the ridge batten are checked against the data sheet.
- Loading out: tiles are carried onto the roof and spread along the battens in small stacks so the structure is loaded evenly.
- First course at the eaves: it sits on the raised eaves batten so it has the same angle as the rest of the roof, and it sets the line for the whole slope. An eaves ventilation grille or bird comb is also fitted here, keeping out birds and insects while letting air through.
- Main slope with fixing as you go: tiles are laid from the bottom up and correctly bonded in each course. Clips and nails are fitted as the tiles are laid, not afterwards. The fixing specification is set by the manufacturer according to pitch and wind exposure, but verges, the ridge and exposed areas are always mechanically fixed. Re-roofing should follow BS 5534:2014+A2:2018, the code of practice for slating and tiling, including mechanically fixed ridges and verges.
- Details: verges, valleys, hips and the ridge. Ridge tiles are clipped to the ridge batten over a ventilated ridge roll that lets air escape from under the tiles.
- Flashings: chimney, roof windows and other penetrations. The sheet metal and flashing work is carried out alongside the roofing, not as a repair afterwards.
- Accessories: snow guards, walkways, outlet tiles.
- Checking and clearing up: a check for watertightness, removal of offcuts and cutting dust from the roof and the gutters.
This is work at height. It belongs in the hands of an experienced gang with scaffolding or other fall protection. Laying the roof yourself is not recommended.
What the price of tiling per m² depends on
The guide price for the labour is €30.00 per m². It applies to laying and fixing tiles on a standard roof slope. The ridge, verges and accessories are often quoted as separate items per running metre or per piece. The final figure is driven mainly by these factors:
- Roof complexity: the simplest is a large gable roof without penetrations, where the roofer lays full tiles in regular courses. Hips, dormers and valleys mean many raking cuts and slow work, so the price per m² rises noticeably.
- Number of penetrations: every chimney, roof window or vent means cutting tiles and forming a junction. Many penetrations on a small area push the price up.
- Pitch and height: a steep roof or a tall house requires more safety measures and the work is slower. On very steep roofs every tile often has to be fixed, which slows the job further.
- Low pitch: when the roof is close to the manufacturer's minimum, additional seals and waterproofing are needed.
- Access to the house: a narrow street with no room for scaffolding or a crane, carrying materials by hand, a roof overhanging a neighbour's property.
- Tile type: large-format concrete tiles are quicker to lay than small clay tiles or plain and beaver-tail tiles, which need more pieces per m².
- Renovation: stripping and disposing of the old covering, any repairs to the roof timbers, new underlay, counter-battens and battens are priced separately and can make up a large part of the cost.
When comparing quotes, ask whether the price per m² includes battening, the ridge and verges, or only laying tiles on the main slope. Otherwise the quotes cannot be compared fairly.
How long tiling takes and what slows it down
On a typical family house, laying the tiles usually takes from a few days to around two weeks. It depends on the area, the complexity of the roof, the number of penetrations and the weather. How well the site is prepared also has a big effect on progress:
- Space for materials: pallets of tiles are heavy. A firm area close to the house and clear access for a lorry with a crane help a great deal.
- Power on site: the roofer needs electricity for saws and cutters.
- Materials on time: tiles and accessories sometimes have long lead times. If one type of accessory is missing, the whole detail stops.
- Chimney and windows ready: the chimney should be built and the roof windows delivered so nobody has to wait.
- Coordinated trades: the flashing installer, the roofer and, where needed, the carpenter should have agreed dates and a sequence of work.
- Weather: tiling is planned for a dry period without strong wind. Rain, frost and wind interrupt the work, and a roof with exposed underlay should not be left uncovered for long.
- Skip: on a renovation it speeds up clearing the old covering. Before the old tiles and battens are taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Neighbours and licences: if scaffolding extends onto a neighbour's land or the pavement, this needs to be arranged in advance, including any licence from the council.
Typical mistakes in tiling and how they show up later
Repairing a leaking roof is unpleasant and expensive. Most problems can be avoided if the tiling is done properly the first time. These mistakes come up again and again in practice:
- Ventilation that does not work: missing or too shallow counter-battens, a ridge bedded solid in mortar without ventilation, or blocked eaves. Years later this shows up as mould on the roof timbers, wet insulation and a musty smell in the loft.
- Inaccurate batten gauge: tiles do not sit properly, courses wave and gaps remain at the laps. Driving rain and gales get in.
- No raised eaves batten: the first course lies flatter than the rest, the tiles above it lift and gaps form at the eaves where wind and rain get in.
- Ridge batten set wrongly: the ridge tiles do not sit on the tiles below, cannot be fixed correctly and the ridge leaks.
- Tiles laid below the manufacturer's minimum pitch without additional sealing: water runs off slowly and wind drives it under the tiles. The manufacturer may also refuse the guarantee.
- Weak or missing fixings: verge and ridge tiles are torn off by the first strong gale, often at the gable and the ridge.
- Poorly flashed chimney, window or valley: the leak first appears as a damp patch on the ceiling near the chimney or window, often only after several heavy downpours.
- Underlay not taken into the gutter: water from the membrane runs behind the gutter onto the fascia, soffit or wall, which gradually get damp and rot.
- Laying in rain or frost: the membrane and seals do not perform as they should and taped joints later come apart.
- Cutting dust left on the roof: it clogs the gutters and can stain glazed tiles.
Sensible ordering also helps. Buying more tiles from the same batch later can be difficult because the shade varies slightly between production runs. Keep a few spare tiles for repairs.
How to check a finished tiled roof
At handover, inspect the roof from outside and from the loft. Check in particular that:
- the courses are straight, the tiles interlock evenly and the first course at the eaves has the same angle as the others,
- verge, ridge and exposed tiles are mechanically fixed,
- the ridge is closed with ridge tiles and ventilation at the eaves and ridge is unobstructed,
- the flashings around the chimney, windows and valleys are watertight and shed water in the right direction,
- the underlay at the eaves finishes on the eaves trim and drains into the gutter,
- snow guards, walkways and other accessories are where they were agreed,
- the gutters have a fall and water drains into the downpipes,
- no wet patches or damaged underlay are visible from inside the loft,
- no offcuts or debris are left on the roof or in the gutters,
- you have spare tiles from the same batch,
- you have received the technical data sheets for the tiles and the documents needed for the guarantee.
It is sensible to look into the loft again after the first heavy rain. Any small problem is then found while the work is still under guarantee.
Frequently asked questions
The guide price for the labour is €30.00 per m². You will pay more for a complex roof with hips, dormers and valleys, many penetrations, a steep pitch or poor access. Stripping the old covering, battening, the ridge, verges and accessories are often priced separately.
It depends on the size of the tile. Large-format tiles need roughly 10 to 15 pieces per m², while plain or beaver-tail tiles can need well over 30 depending on the lap. The exact number is given on the manufacturer's data sheet. For a specific roof, ask for a laying plan or material take-off that also allows for verges, the ridge and penetrations.
Neither is clearly better. Clay tiles are chosen for their appearance, colour stability and long life. Concrete tiles are dimensionally accurate and strong, but usually heavier. The decision comes down to budget, the load capacity of the roof structure and the look of the house. For a weaker roof structure, lightweight clay tiles are an option.
Choose a model the manufacturer approves for that pitch and add waterproofing and seals according to its instructions. A standard tile laid below its permitted pitch leaks in driving rain and the manufacturer may not honour the guarantee. The figure for a specific model is on its data sheet.
Usually not. Old battens often have a different gauge from the one the new tile requires and are frequently damaged by moisture. When a roof is re-covered, new underlay, counter-battens and battens are therefore normally fitted as well.
Yes, where sliding snow could injure someone or cause damage, for example above an entrance, a footpath, parking spaces or lower roofs. Their number and layout depend on the snow load, the pitch and length of the roof and a calculation following the manufacturer's instructions. They are therefore often spread across the whole roof rather than fitted only in one spot.
Correctly installed, the tiles themselves last for decades. The life of the roof is more often limited by the underlay, battens, flashings and seals at the details. Regular inspections after winter and after gales, replacing cracked tiles and clearing the gutters all help.
Related work
How angle standing seam metal facade cladding is installed, which metals are used, what makes the job harder and how to check the finished work.
How roof battens for tiles are installed: setting out the gauge, batten size and treatment, fixing, typical mistakes and checks before tiling.
How a vapour barrier is fitted in a loft or plasterboard ceiling, which membrane to choose, how to seal joints and how to check the finished work.
How counter battens are fixed on a roof, what height to choose, what to prepare beforehand and what to check before the roofers move on.
How a sheet metal roofer lays a double standing seam roof, what roof build-up it needs, which metal to choose and how to check the finished work.
How a PVC membrane is fitted on a flat roof, when it can go over old felt, which mistakes cause leaks and how to check the finished work.