Building work price list: Installation of Fatrafol PVC Sheet Waterproofing (Flat Roof)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Roofs and coverings cost | ||||
| Install PVC waterproofing membrane (flat roof) | m² | €17.00 / m² | m² | enter quantity- |
| Timber roof truss installation (load-bearing structure) | m² | m² | - | |
| Install battening for tiled roof | m² | m² | - | |
| Install counter-battening | m² | €3.90 / m² | m² | enter quantity- |
| Install vapour barrier | m² | €2.90 / m² | m² | enter quantity- |
| Cladding facade - standing seam | m² | €20.00 / m² | m² | enter quantity- |
| Lock seam / standing seam metal roof covering | m² | €19.00 / m² | m² | enter quantity- |
| Spark test PVC membrane (flat roof) | m² | m² | - | |
| Lay ceramic/concrete tile covering | m² | €30.00 / m² | m² | enter quantity- |
What Fatrafol PVC membrane is and what it is used for
The membrane forms a single continuous waterproof layer on a flat roof. The sheets are mechanically fixed or ballasted, the laps are welded with hot air, and the edges are joined to the metal trims. It is used on new buildings with flat roofs. More often, it is chosen when an old felt or bitumen roof on a house, garage or block of flats starts to leak.
PVC roofing membrane such as Fatrafol is made of plasticised PVC with an internal reinforcement. Membranes for mechanical fixing have a polyester scrim. This gives them tensile strength and stops the membrane tearing around the fixings. Membranes for adhered or ballasted systems usually have a glass fleece reinforcement, which keeps them dimensionally stable through heat and frost. A membrane made for exposed use resists UV, so it can be left in direct sunlight. A typical thickness is around 1.5 mm. For more demanding roofs a thicker grade, for example 2 mm, is chosen.
Not all PVC sheets are the same. An exposed roof needs a membrane that the manufacturer has designed for that purpose. Pond liners, pool liners and below-ground membranes have a different composition and would age quickly in the sun.
Overlay, strip and replace, or repair: what to decide first
Depending on the condition of the roof, there are three options:
- new roof or full strip and replace: the old build-up is removed and a new one is laid, including a vapour control layer and insulation,
- overlay of the old covering: the existing build-up is dry and sound, so the membrane is laid over it on a separation layer,
- local repair: most of the roof is fine and only a particular detail or damaged area needs attention.
The membrane can be secured in different ways. The most common is mechanical fixing, where fixings hold it down to the deck. In a ballasted system it is held by gravel, paving slabs on pedestals or the layers of a green roof. An adhered membrane is used where fixings cannot be installed. The right method depends on the roof deck, the height of the building and whether people will walk on the roof.
When overlaying an old roof, guesswork is not enough. If the membrane is fixed through the existing build-up, a pull-out test shows how much load a fixing really holds in the deck. If the membrane is adhered, the old build-up is checked for cohesion and for whether the adhesive bonds firmly to it. The result determines the number of fixings and whether an overlay is possible at all.
Before placing an order, it is worth clarifying these questions:
- Is the existing build-up dry? This cannot be said reliably without a core sample. The result decides whether an overlay is enough or the build-up has to come off.
- Do you want to add insulation? Replacing the waterproofing is a good opportunity to insulate the roof. Thicker insulation, however, raises the roof surface, so the parapet upstand above the new build-up becomes lower. It often needs to be raised and the coping and trims altered.
- Will people walk on the roof? A terrace or a roof with plant needs a protection layer, walkways or paving on pedestals.
- Does the water drain away? If water ponds on the roof today, the falls need correcting or extra outlets added. A flat roof is never completely level - the designer sets a slight fall towards the outlets.
- What about equipment on the roof? Aerials, satellite dishes, air conditioning units and lightning protection have to be removed temporarily and then refitted. Agree in advance who will arrange this.
- What guarantee do you want? The manufacturer's guarantee on the membrane is often conditional on installation by a contractor the manufacturer has trained. Before signing, ask whether the roofer has that training and what guarantee is given on the workmanship.
How the installation works step by step
The process is always similar. At every step, though, something can go wrong, and it only shows in the first heavy rain.
- Survey: the roofer inspects the roof and checks the moisture content of the existing build-up, for example with a core sample or meter readings. For an overlay, a pull-out test is also carried out or the cohesion of the substrate is checked.
- Preparing the substrate: the surface is cleaned, and sharp projections, loose material and gravel are removed. For a full replacement, the old build-up is stripped and a new vapour control layer and insulation are laid.
- Separation layer: a separation and protection layer, most often a geotextile fleece, is laid on the substrate.
- Rolling out the sheets: the membrane is rolled out to a laying plan, with the lap width the manufacturer specifies.
- Fixing: the membrane is fixed in the number and pattern that come from the wind uplift calculation. There are more fixings at the edges and corners.
- Metal trims: parapet coping and other trims made of PVC-coated metal are fitted. They must be in place before the details are formed, because the membrane is welded to them.
- Welding the laps: the laps are welded with hot air, usually with an automatic welder on long straight runs and with a hand welder and roller on details.
- Details: parapets, outlets, penetrations, corners and abutments with walls are formed, and the membrane is welded to the PVC-coated metal. Penetrations are sealed with preformed pieces or collars of the same material.
- Testing: all welds are checked and any defects are repaired.
- Finishing: rooftop equipment is refitted, gravel or paving is reinstated on a ballasted roof, and offcuts are cleared away.
Why is the membrane not laid directly on bitumen or polystyrene? PVC is not chemically compatible with these materials. Plasticisers gradually migrate out of it, the membrane hardens and eventually cracks. The separation layer keeps them apart.
Cost of installing PVC membrane per m² and what affects it
The guide price for labour is €17.00 per m². The final price can differ considerably, because a roof cannot be priced on area alone.
- Roof shape and number of details: a large plain roof with no penetrations goes quickly, because an automatic welder can be used. Every chimney, vent pipe, rooflight or internal corner is formed by hand. On a complicated roof, the details can take longer than the whole plain area.
- Roof size: a small garage or extension roof costs more per m² than a large roof, because travel, preparation and details are spread over fewer square metres.
- Condition of the existing build-up: if it is dry and sound, an overlay is enough. Wet insulation has to be removed, disposed of and replaced, which usually makes the whole job several times more expensive than the membrane alone.
- Deck and fixing method: fixing into profiled metal decking or timber boarding is quicker than drilling into concrete. If the pull-out test shows a weak deck, more fixings or a different fixing method are needed. Ballasting with gravel or paving adds the work of moving material.
- Building height: a taller building means higher wind suction, more fixings and more demanding fall protection for the workers.
- Access: if materials cannot be carried up by hand and a crane or access platform is needed, the hire cost is added.
- Membrane thickness and type: a thicker or surface-finished membrane costs more and can be slower to weld.
- Related work: new outlets, more extensive sheet metal work, raising the parapet or correcting the falls are usually priced as separate items.
When comparing quotes, check whether they include the membrane, separation layer, fixings, metal trims, details and waste removal. Before you hand over the old roof build-up or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note. A quote that gives only a labour price per m² may look cheaper than it will turn out to be.
What makes the work easier and what slows it down
The weather matters a great deal. The membrane is welded in dry conditions and at temperatures the manufacturer allows. Welds do not hold on a wet or frozen substrate, so installation in winter or in a wet spell is often postponed, and in frost only emergency repairs are carried out. It is sensible to plan the start date with some slack for rainy days.
On the client's side, it helps to:
- have the drawings available, or at least information on what the roof and deck are made of, if this can be found out,
- provide safe access to the roof, for example a roof hatch or space for a ladder or scaffold,
- set aside space near the building for rolls of membrane, insulation and a skip,
- if a skip, scaffold or crane has to stand on the pavement or road, obtain the necessary permit from the local council in advance, unless the contractor or hire company arranges it,
- provide a power supply for the welding equipment,
- arrange in advance with an electrician or service engineer to disconnect aerials, air conditioning and other rooftop equipment,
- in a block of flats, inform residents about the dates, the noise and restricted access to the roof and around the building.
The work is held up by unplanned changes during installation, for example new penetrations decided on the roof, or waiting for the owners to decide when wet insulation is found under the old covering. Agree in advance how to proceed if the survey reveals more damage than expected.
Where the flat roof abuts a pitched roof or a clad wall, coordinate the junctions with the other trades. Typical examples are roof battens for a tiled roof next to a flat extension, or angle standing seam facade cladding above a parapet. The membrane upstand should be completed before the adjoining finish covers it.
Typical mistakes and how they show up later
Most leaking membrane roofs do not fail because of poor material but because of poor workmanship. These problems come up again and again:
Cold welds. They look welded, but because the temperature was too low or the welder moved too fast, the sheets did not fuse into one. The lap lasts a few months, then starts to open, and water gets in at places that are hard to find.
Membrane over a wet build-up. Water is trapped under the membrane and damages the roof from below without being visible. It shows as damp patches on the ceiling, mould or blisters in the membrane, even though the roof does not leak anywhere.
Too few fixings or fixings in a weak deck. This is mainly a problem at corners and edges, where wind suction is highest, and on overlays done without a pull-out test. In a severe storm the membrane can lift or tear off.
No separation from bitumen or polystyrene. After some years the membrane hardens, loses flexibility and cracks, often well before the end of its expected life.
Poorly formed details around outlets and penetrations. They leak even when the main roof area is perfect. Water then appears far from where it enters, because it runs through the build-up.
Inadequate falls. Water and dirt sit on the roof. Ponding blocks the outlets, freezes in winter and speeds up the ageing of the membrane.
Membrane pulled tight with no slack at internal corners. When it shrinks in frost, it pulls on the parapet and can tear or ripple at the corner.
Low parapet after adding insulation. If thicker insulation is added and the parapet is not raised, there is not enough height to terminate the membrane safely. In a downpour or under snow, water can then get behind the coping.
Permissions, safety and blocks of flats
Replacing the waterproofing without changing the shape or height of the roof is usually treated as maintenance. However, re-roofing work can fall under building regulations, especially where the roof build-up changes, insulation is added, the parapet height changes or a roof terrace is created. A terrace or a change to the roof height may also need planning permission. Check with the local authority building control and planning departments in advance what is required, rather than assuming nothing needs to be done. Insulation on renovations and extensions in England must currently meet Approved Document L (2021 edition); the new 2026 edition (Future Homes Standard) takes effect on 24 March 2027. In Scotland, changing roofs and other structural alterations need a building warrant from the council before work starts.
In a block of flats, the roof is usually part of the common parts of the building. Repairs are decided and organised by the freeholder, the managing agent or the residents' management company. An individual flat owner cannot commission the work on their own.
This is work at height with hot-air welding. It belongs in the hands of a contractor with proper fall protection and experience of this system - it is not a job for a homeowner to do alone. Gas pipework passing through the roof may only be altered by a Gas Safe registered engineer, and electrical cables only by a qualified electrician. The same applies to relocating lightning protection and electrical equipment on the roof. If the renovation affects the roof structure or significantly increases its load, for example with a ballasted system or a green roof, a structural engineer must assess its load-bearing capacity.
How to check the finished roof
At handover, walk the roof with the roofer and ask about anything that is unclear:
- the membrane lies flat, without ripples, blisters or visible damage,
- the welds are continuous, with a fine bead of melted material visible along the edge of the lap,
- the laps have been checked with a seam probe, or by spark testing where the build-up allows, and defects have been repaired,
- there are no creases or unbonded areas around outlets, penetrations and corners,
- the parapet coping is firmly fixed and the membrane is welded to it,
- the membrane is not drum-tight at the edges and is not torn at internal corners,
- after rain, water drains to the outlets without large ponds,
- outlets and downpipes are clear and fitted with leaf guards,
- aerials, air conditioning and lightning protection are back in place and their penetrations are sealed,
- no offcuts, fixings or other waste are left on the roof,
- you have received a guarantee for both materials and workmanship, a description of the build-up used and, for an overlay, the pull-out test results.
If possible, check the ceiling below and the roof itself again after the first heavy rain. Any problem can then be dealt with under the guarantee, not years later.
Frequently asked questions
Installation alone costs roughly €17.00 per m². The price goes up mainly with a wet existing build-up that has to be removed, many penetrations and details, a small roof area, a tall building and difficult access. Metal trims, outlets and insulation are usually priced separately.
Installed correctly and inspected now and then, a good quality PVC roofing membrane lasts several decades. Manufacturers usually quote a service life of around thirty years. It is shortened most by faulty welds, ponding water and mechanical damage.
Yes, if the existing build-up is dry and sound. A separation layer is always laid between the bitumen and the PVC. If the insulation under the felt is saturated, an overlay will not solve the problem and the wet layers must be removed.
For occasional inspection and cleaning, yes, but carefully and in soft-soled footwear. If the roof is to be used regularly, for example as a terrace, a protection layer and paving on pedestals are laid over the membrane.
A typical flat roof on a house or a small block of flats is usually finished in a few days. The details take the most time, and with a full replacement so does stripping the old build-up. Rain and frost can interrupt the work.
Inspect it about once or twice a year, mainly in spring and autumn. Clear the outlets and remove leaves and debris during the check. Do not drag sharp objects or heavy tools across it. Minor damage can be repaired by a roofer welding on a patch.
Related work
How angle standing seam metal facade cladding is installed, which metals are used, what makes the job harder and how to check the finished work.
How roof battens for tiles are installed: setting out the gauge, batten size and treatment, fixing, typical mistakes and checks before tiling.
How a vapour barrier is fitted in a loft or plasterboard ceiling, which membrane to choose, how to seal joints and how to check the finished work.
How counter battens are fixed on a roof, what height to choose, what to prepare beforehand and what to check before the roofers move on.
How a sheet metal roofer lays a double standing seam roof, what roof build-up it needs, which metal to choose and how to check the finished work.
How a spark test finds leaks in a PVC flat roof membrane, when to book one, what the roof needs and how to check the test report.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.