Building work price list: Apartment Plumbing - Installation of New Water Supply Systems
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Package deals | ||||
| Plumbing pipework installation for flat (WC, bathroom, kitchen) | pcs | €850.00 / pcs | pcs | enter quantity- |
What replacing the water pipework in a flat involves and when it is needed
A fixed-price replumb of a flat means fully replacing the hot and cold water pipes and the waste pipes, from the riser and soil stack to each outlet in the kitchen, bathroom and WC. It is usually ordered during a full refurbishment of an older flat, when tiles and floors are coming up anyway. The other common reason is old galvanised steel pipe that has started to rust, scale up and leak.
These signs point to pipework that needs replacing:
- rusty or cloudy water when a tap is opened,
- weak pressure, especially when two outlets run at once,
- damp patches on walls, near the floor or in the flat below,
- valves that will not shut off fully or drip when closed,
- slow-draining wastes and smells from drains that come back even after the trap has been cleaned.
In a concrete-framed block with its original galvanised pipes, replacement during a refurbishment almost always makes sense. New pipes are hidden behind the tiles and last for decades, so the tiling will not have to be broken out again because of them.
What the fixed price usually covers and what it does not
The advantage of a fixed price is that the scope is agreed for the whole flat at once rather than pricing every metre of pipe separately. The scope varies between firms, though, so always get it in writing. A typical package includes:
- removal of the old water and waste pipes within the flat,
- chasing or cutting channels for the new pipe runs,
- new hot and cold supply pipework, most often in PPR,
- new plastic waste pipework laid to the correct fall,
- outlets for taps, shower, bath, WC, washing machine and dishwasher,
- isolation valves and a pressure test before anything is covered up.
Often not included are replacement of the riser, filling and plastering the chases, tiling, fitting sanitaryware or an electric water heater. Clients sometimes expect a "finished bathroom", but the package ends at capped-off outlets. Ask in advance exactly where the work stops.
When comparing quotes, it pays to get an answer to the same questions from every firm:
- how many outlets the package covers and what each additional one costs,
- whether materials are included or labour only,
- whether fitting a concealed frame for a wall-hung WC is included,
- who removes the old pipes and rubble, and whether the carrier is registered with the Environment Agency and provides a waste transfer note,
- whether the connection to the riser is included, with a new stopcock,
- who fills the chases and by when.
What to decide before the plumber starts
The pipes are laid in the walls and floor and then covered by tiling. Any change afterwards means cutting into finished work. Before starting, these points need to be settled:
- Position of sanitaryware and appliances: where the basin, shower or bath, WC, sink, dishwasher and washing machine will go. A floor plan with dimensions is best, even a hand-drawn one. Moving outlets later is avoidable extra work.
- WC type: a wall-hung WC needs a concealed frame and water and waste outlets at a different height from a floor-standing pan. See installing and recessing concealed cisterns and frames.
- Shower: a linear drain or a floor-level tray needs space for the waste under the floor and a fall. On a concrete floor slab this can mean raising the bathroom floor.
- Mixers: a concealed shower valve is set in at the first-fix stage and its body must match the thickness of the tiling. More detail is in the article on installing a concealed shower valve (iBox).
- Specific products: with some basins, vanity units and sinks the outlet height matters to the centimetre. If products are already chosen, give the plumber the installation sheets.
- Hot water: whether hot water stays on the communal supply or comes from a water heater or boiler, and where it will be.
- Isolation: whether separate valves are wanted for the kitchen, bathroom and WC, and possibly a filter after the water meter.
How the replacement is carried out
Good plumbing starts with planning, not drilling. The usual sequence is:
- Measuring up the flat against the agreed plan. The plumber marks the pipe routes and outlet heights on the walls.
- Agreement with the managing agent or residents' management company on shutting off the riser and on where the communal pipework ends and the flat's begins.
- Shutting off and draining down the pipework in the flat. With old stopcocks it is checked before the day whether they actually seal.
- Stripping out the old pipework and preparing channels in walls and floor - see chasing channels for water pipework in concrete. Cables in the walls are taken into account and the relevant circuit is switched off at the consumer unit before work starts.
- Laying the new pipework, welding the PPR joints, fixing and insulating. Where hot and cold run side by side, the hot pipe goes above the cold with a gap between them so that the cold water does not warm up.
- Laying the waste pipes with a fall towards the soil stack. In flats a fall of around 2 % is usual, roughly 2 cm per metre of run. The WC connects to a 110 mm waste, the sink and shower usually to a smaller diameter as designed. The waste must be vented, normally via the stack. On a longer horizontal run or a poorly vented stack an air admittance valve is fitted so that draining water does not siphon the traps.
- Connecting to the riser and fitting the main stopcock and room isolation valves. Water meters often belong to the water supplier or the building and may be sealed. Removing, replacing or resealing them is therefore done only to the extent agreed with the managing agent or supplier.
- Pressure testing the supply and checking the wastes while the chases are still open. With PPR the test is done only once the welds have cooled, according to the manufacturer usually no sooner than an hour after the last weld. The system is pressurised to 1.5 times the working pressure, usually at least 10 bar. It stays under pressure according to the system manufacturer's procedure, typically for at least several tens of minutes and with plastics often several hours. The checks are that pressure does not drop more than the manufacturer allows and that nothing drips anywhere.
- Photographing the pipe routes with a tape measure held against the wall, so it is clear later where pipes run.
- Covering the chases with plaster or preparing for tiling. Outlets are capped and stay under pressure until the taps are fitted.
Materials: PPR, multilayer pipe and waste pipe
Old metal pipework is now almost always replaced with plastic. It does not rust, does not scale up the way galvanised pipe does, is light and quick to install.
- PPR (polypropylene) is widely used in flats. Joints are heat-welded, so pipe and fitting become one piece with no seals. Temperature and pressure resistance depend on the pipe type. For hot water, pipes rated by the manufacturer for hot water are used, often with a stabilising layer that limits expansion.
- Multilayer pipe (PEX-AL-PEX) has an aluminium layer, bends easily and suits floor runs, for example. It is joined with press fittings, which need the correct press tool.
- Plastic waste pipe is for drainage only, not for drinking water.
Copper is now used less often in flat refurbishments. With good material and correct installation, manufacturers rate plastic pipework for decades of service. Insulation matters too. Hot pipes need it to limit heat loss, cold pipes to prevent condensation and warming from the hot run.
The pipe is not the only thing that counts. It is just as important that pipes and fittings come from one system and that the plumber joins them with the tools and method the manufacturer specifies. The system warranty often depends on it.
How much plumbing in a flat costs and what affects the price
The guide labour price in the list is €850.00 per piece, meaning a fixed package of pipework for the WC, bathroom and kitchen in one flat. The package is agreed in advance, but the complexity of the flat has a big effect on it. Firms mainly look at the following when pricing:
- Number of outlets: each extra outlet, such as a second basin, a bidet, a utility sink or a fridge supply for an ice maker, adds material and time. Some packages are based on an exact number of outlets and each extra is charged separately. A second bathroom effectively means another package.
- Moving the kitchen or bathroom: keeping the original layout is cheapest. When moved further from the stack, the waste needs a fall and space in the floor. That can mean cutting into the floor or raising it. Such a move pushes the price up considerably, by tens of per cent over a longer distance.
- Original bathroom pod: if an old prefabricated bathroom pod has to be taken out first and new partitions built, that is separate extra work.
- Wall construction: in hard concrete and precast panel walls, chases are cut more slowly than in brick or aerated block. Sometimes pipes are better run in plasterboard false walls.
- Condition of the riser and stopcocks: old corroded stopcocks that will not shut need replacing and the whole riser shut down, which adds work and coordination with the managing agent.
- Unexpected obstacles in the walls: old buried pipes, steel elements or cables crossing the route. Each of these adds time and material.
- Materials and fittings: concealed valves, frames for wall-hung WCs, linear drains, filters and separate room isolation raise the price according to number and quality.
- What the package contains: a package with materials, filling of chases and waste removal cannot be compared with one that is labour only.
Ask for an itemised quote, so it is clear which of these items are included in the total.
What makes the job easier and what slows it down
A lot depends on how well the job is prepared. The work goes faster with:
- an empty flat with no furniture and the tiles already removed,
- good access to the risers and stopcocks, for example access panels removed or tiling around the riser broken out,
- electrical and flooring work done at the same time, so the chases are cut in one go,
- a water shut-off date agreed with the managing agent in advance,
- a finished plan with the position of every item and products chosen,
- somewhere arranged for waste and parking near the building.
The work takes longer when decisions change during installation. It is also delayed by a managing agent who cannot arrange the shut-off on the agreed date, or by another trade working in the flat at the same time. In a block of flats, check the building rules or lease for the hours when noisy work is allowed.
Replacing pipework and risers in a block of flats: managing agent and building control
Risers, main stopcocks and often water meters are part of the common parts of the building. Any work on them, shutting off water to the whole riser or replacing a meter should therefore be agreed in advance with the managing agent, freeholder or residents' management company. Many buildings have their own rules, such as set shut-off times or requirements for meter seals. It is courteous to let neighbours on the same riser know they will be without water. Leaseholders should also check whether the lease requires the landlord's consent for alterations.
Replacing the pipework within a flat without touching the structure is usually less demanding, but do not assume that nothing is required. If removing a bathroom pod, moving partitions or other alterations are also planned, check with local authority building control whether approval is needed. The pipework should be designed in line with the applicable standards and the manufacturer's instructions, which the contractor should know. Under the Water Supply (Water Fittings) Regulations 1999, some plumbing work, such as certain bidets, pumps or large baths, must be notified to the water company before work starts, unless an approved (WaterSafe) plumber is used who can self-certify.
If kitchen work involves the gas pipe or the cooker, only a Gas Safe registered engineer may carry it out. If you smell gas, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland) straight away. Likewise, electrical connection of a water heater, washing machine or dishwasher is for a qualified electrician, not a plumber or a DIYer. A new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts.
Typical mistakes and how they show up later
Covering pipework without a pressure test. A leaking joint then has to be found by cutting into new tiling. It often only shows months later as a damp patch or a leak into the flat below.
Pressure testing straight after welding. If PPR is pressurised before the welds have cooled, a joint can be damaged and the leak only appears later behind the tiles.
Too little fall on the wastes or too many bends. Water drains slowly, debris settles in the pipe and the waste blocks repeatedly.
Unvented waste. When a bath or washing machine empties, a nearby drain gurgles, traps are siphoned and drains smell. The fix is a correct connection to a vented stack or an air admittance valve.
Missing insulation or the hot pipe below the cold. The cold water then warms up and the pipe sweats. Condensation dampens the wall and mould can form behind the tiles. An uninsulated hot pipe wastes heat and hot water takes a long time to arrive.
Mixing cheap fittings from different manufacturers that do not match. Joints can loosen over time, especially on hot water, and the system manufacturer will not honour the warranty.
No separate valves for individual rooms. In a fault the water to the whole flat has to be shut off, even for a simple tap replacement.
No photos of the pipe routes. Later it is easy to drill into a pipe when putting up a shelf or cabinet.
Outlets at the wrong height or off centre. This only shows when the basin or kitchen units are fitted, when the trap will not fit in the cabinet or the tap sits crooked. It usually happens when positions were agreed only verbally.
Concealed valve set without regard to the tiling. If the body sits too deep or sticks out too far, the cover plate will not seat and water gets behind the tiles.
Connecting to a corroded riser without a new stopcock. The new pipework is fine, but the first failure comes at the joint with the old pipe. The connection itself is part of the plumber's work and the plumber is responsible for it. If the riser is in poor condition, the plumber should warn the client before installation.
Checks at handover
Before the chases are covered and the handover is signed, check:
- that the pressure test was carried out and there is a record of it with the date, test pressure, duration and pressure drop,
- that there are photos or a sketch of the pipe routes in the walls and floor,
- that hot and cold are correctly identified and hot is on the left,
- that every outlet is at the agreed position and height,
- that the pipes are insulated and securely fixed,
- that all valves work and shut off fully,
- that the wastes drain quickly in a test discharge and nothing gurgles,
- that there are no signs of water or drips at joints, outlets or the riser,
- that there is a list of materials used and the warranty terms,
- that the managing agent has confirmed the water is back on and the meter readings.
Keep the paperwork, route photos and pressure test record with the flat's documents. They help with warranty claims, insurance claims and a later sale. For an overview of related jobs, see plumbing work.
Frequently asked questions
A fixed package of pipework for the WC, bathroom and kitchen in one flat costs, according to the price list, a guide of €850.00 per piece. The final figure rises with more outlets, a moved bathroom or kitchen and more expensive fittings such as concealed valves or a frame for a wall-hung WC. Only compare quotes for the same written scope, with the same materials, filling of chases and waste removal.
For a typical one- or two-bedroom flat with one bathroom, a separate WC and a kitchen, the installation itself usually takes 3 to 5 working days. A second bathroom, moved fittings or removing a bathroom pod add time, and filling the chases plus plaster drying time must be added separately. Living there is possible but uncomfortable. Water will be limited or off completely for several days and chasing creates a lot of dust and noise. Most people therefore combine the replumb with a full bathroom refurbishment and stay elsewhere for that time.
Not always, but if the riser is old and corroded, the new pipework is being connected to a weak point. The riser is part of the common parts of the building, so arrange its replacement with the managing agent or residents' management company, ideally for the whole riser at once.
Look at the pipes near the riser, under the basin or behind access panels. Galvanised pipes are grey metal, joined with threads along the whole run and often rusty at the joints. Plastic pipes are white, grey or green, with welded or pressed joints, and metal threads usually only at transitions to valves and outlets. Asking the managing agent whether and when the building's pipework was replaced also helps.
Both are common and reliable in flats. PPR is welded and has no seals, multilayer pipe bends more easily and suits floor runs. More important than the material itself is that the plumber uses one complete system and works to the manufacturer's instructions.
It depends on the terms of the specific policy, so read them or ask the insurer before starting. DIY installation does not in itself void cover, but after damage, for example to a neighbour's flat, the insurer usually examines whether the installation was done competently. If that cannot be shown, the payout may be reduced or refused. A pressure test record and an invoice from a professional help considerably in that situation.
Often yes, but the waste is the deciding factor. It needs a fall to the stack and space in the floor, so the further from the stack, the more the floor has to be raised or cut. If the move involves removing partitions or a bathroom pod, check in advance with local authority building control whether approval is needed. Where load-bearing walls are involved, a structural engineer is essential.
Related work
Price list for plumbing work in 2026: water supply pipes, waste pipes and fitting sanitaryware. What the cost depends on and a quick estimate in NUMIQ.
How channels for water pipes are cut into concrete, when to use a wall chaser, what to watch for in concrete blocks of flats and how to check the work.
How a concealed cistern frame or valve body is set into a wall, what to watch when chasing it in, and how to check the work before tiling.
How a concealed shower valve body (iBox) is installed, what makes the job harder, the mistakes to avoid and how to check the finished work.
How access panels are fitted into masonry, concrete, plasterboard and riser boxing. Choosing type and size, installation steps, typical mistakes and checks.
How a shower channel is set into the floor, connected to the waste, bedded in screed and waterproofed, and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.