Price list 2026 · Europe

Plumbing work: cost of plumbing per point 2026 and process

Plumbing covers running the water and waste pipes and fitting the sanitaryware, taps and in-wall systems. What you pay depends mostly on how many outlets you need, how long the pipe runs are, how the pipes go into the wall, and how much fitting work there is.

Updated 09/2026·16 min read·29 price list items
Standard labour price
€35.00/ pcs
Indicative range
€28.00 - €45.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page
Short answer

Under the current price list, a cold and hot water outlet costs €35.00 per point of labour. Drainage outlets, fitting work and in-wall systems are charged separately, based on how much pipework your job actually needs.

Types of work and their prices

€35.00
per pcs
Water Pipe Runs

The basic unit of pipework that determines the number and length of the pipes. The outlet position is set according to the layout of the sanitaryware.

€25.00
per pcs
Drainage Runs

The waste pipe needs a sufficient fall towards the vertical stack, otherwise debris settles in the pipe and causes odours.

€90.00
per pcs
Fitting a Bath

The bath is set on a solid base and bedded in so it does not transfer movement to the tiling and sealant joints.

€50.00
per pcs
Fitting a Basin

Covers connection to the water and waste pipework including fitting the trap. The height and position are matched to the vanity unit or bracket.

€120.00
per pcs
In-Wall WC Systems

The support frame for a wall-hung toilet is anchored to the wall or floor before the false wall is built, with the flush plate position set in advance.

€104.35
per pcs

The water heater is hung on a support capable of carrying its full weight and connected to both the water supply and the electrics.

Plumbing price list 2026

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Plumbing29 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Plumbing works cost

Cold and hot water outlet pointpcs€35.00 / pcspcsenter quantity-
Installation of wall-hung WC duct framepcspcs-
Install and fit access panelspcs€45.00 / pcspcsenter quantity-
Installation of concealed WC framepcs€120.00 / pcspcsenter quantity-
Install and brick-up bathpcs€90.00 / pcspcsenter quantity-
Install ceramic basinpcs€50.00 / pcspcsenter quantity-
Shower tray installationpcs€130.00 / pcspcsenter quantity-
Install shower enclosure glass (screen)pcspcs-
Installation of shower enclosurepc€150.00 / pcpcenter quantity-
Install deck-mounted tappcs€35.00 / pcspcsenter quantity-
Install wall-mounted bath/shower mixerpcs€65.00 / pcspcsenter quantity-
Install concealed shower valve body (iBox)pcspcs-
Install concealed mixer tappcspcs-
Internal waste and drainage outlet pointpcs€25.00 / pcspcsenter quantity-
Install washing machine/dishwasher valve and trappcspcs-
Hang and connect electric water heater up to 120 lpcs€104.35 / pcspcsenter quantity-
Install whole-house water filterpcs€55.00 / pcspcsenter quantity-
Installation of domestic sewage treatment plant / septic tank on gravel bedpc€600.00 / pcpcenter quantity-
Hot water circulation pipeworklmlm-
Pressure test internal water supply pipeworkhrhr-
Chase cutting for plumbing (concrete)lm€29.00 / lmlmenter quantity-
Make good walls after plumbinglm€8.50 / lmlmenter quantity-
Install and chase in concealed valve bodypcs€95.00 / pcspcsenter quantity-
Install shower channel + screed inpcspcs-
Install stopcocks / isolation valvespcs€13.00 / pcspcsenter quantity-
Install valve for dryer/washer + wastepcs€55.00 / pcspcsenter quantity-
Connect pipework to cast iron waste stackpcspcs-

Package deals

Plumbing pipework installation for flat (WC, bathroom, kitchen)pcspcs-

Other works

Other unspecified works in tradehrhr-
Total labour
- enter quantity
Create quote from price list →

How much it costs by scope

Model Scope of Plumbing for a Bathroom Renovation (6 m²)
Pipe Runs Only
3 water outlets, 3 drainage outlets and 15 linear metres of chasing for the pipework.
€615.00
Pipe Runs and Fitting Sanitaryware
The same scope plus fitting a basin, a bath and two taps.
€855.00
Full Installation Including a Wall-Hung WC and Accessories
The same scope plus an in-wall WC module, stop valves and finishing the chases.
€1180.50
Indicative total labour based on the quantities shown. Sanitaryware, taps and tiling are priced separately.

Preparing the Pipe Runs

01
Marking Out the Outlets

Before any chasing starts, the plumber marks where the water and drainage outlets go, based on where the bath, basin, WC and washing machine will sit.

02
Cutting Chases for Pipes

The chases follow the sanitaryware layout and give the waste pipe the fall it needs.

€29.00/lm
03
Laying Water and Waste Pipes

The plumber lays the pipes with the right fall on the waste line and leaves enough spare length to connect the fittings later.

€35.00/pcs
04
Fitting In-Wall Modules

The wall-hung WC module is fixed in place before the false wall goes up. The plumber then checks the supply and waste positions against the actual toilet.

€120.00/pcs
05
Pressure Test First

The plumber pressure-tests the pipes before tiling and boxing-in, so any leak shows up while it can still be reached.

Method of work

  1. 01Visiting the site and planning where the sanitaryware and pipe runs will go.
  2. 02Cutting chases and openings for the water and waste pipes.
  3. 03Laying the water pipes and keeping the right fall on the waste line.
  4. 04Fitting in-wall modules and putting inspection hatches where they are easy to reach.
  5. 05Pressure-testing the water pipes before boxing-in and tiling.
  6. 06Filling the chases and getting the walls ready for tiles or other finishes.
  7. 07Fitting the sanitaryware, taps and stop valves once the tiling is done.
  8. 08Checking that everything works, the joints don't leak and the waste drains properly before handover.

5 common mistakes

01
Not enough fall on the waste pipe

If the fall is too shallow, debris settles in the pipe and it starts to smell. The plumber checks the fall with a spirit level while fitting, not once it is covered.

02
Boxing in before a pressure test

If a leak only turns up after tiling, finished work has to be ripped out. That is why the pipes always get a pressure test before boxing-in.

03
No inspection hatches

If you can't get to the valves and joints, every future repair or service gets much harder.

04
Wall too weak for water heater or WC

A full water heater or a WC in use puts real weight on the wall. The wall has to take that load or be properly anchored, otherwise things can work loose.

05
Supply pipe too small

A pipe that is too narrow loses flow when several taps run at once. You notice it most when the shower and washing machine are on together.

What water pipes are made of and when to replace them

If you live in an older flat or house, your water probably still comes through galvanised steel pipes. After a few decades they rust on the inside and fill up with limescale. From the outside the pipe looks the same, but the space inside keeps shrinking. You notice it when someone runs a bath and you turn on the kitchen tap: the flow drops right away. After a holiday, brownish water comes out of the tap for a while, and small drips appear at the threaded joints. That is why plumbers usually replace old steel pipework in full when a bathroom or kitchen is renovated, rather than patching it bit by bit.

For new pipework you will mostly come across three materials:

  • Polypropylene (PPR): the plumber fuses pipes and fittings together with a heating tool. The joints are strong and the material is inexpensive. PPR pipe grows noticeably longer when hot water runs through it, so hot lines need room to expand and the right fixings.
  • Multilayer pipe: a plastic pipe with a thin aluminium layer in the middle. You can bend it, it expands much less when warm, and the joints are pressed with a special tool. It works well in floors and in walls.
  • Copper: tough and very long-lasting, but it costs more and takes more skill to join. Plumbers use it less than they used to, often where pipes stay visible.

Waste pipes indoors are usually polypropylene, which copes with hot water without trouble. Underground and outside, you need thick-walled drainage pipe that the manufacturer has designed for burial.

Pressure, filter and hard water

Right after the water meter or main stopcock there should be a filter. It catches sand and grit from the public mains before they reach your taps and appliances. If the mains pressure is high, a pressure-reducing valve belongs here too. Why does this matter? Constant high pressure strains taps, toilet cisterns, the water heater and the washing machine, and they wear out sooner. Pressure that is too low shows up as a feeble shower, especially upstairs in a house.

In many regions the water is hard. Limescale settles in the water heater, in taps, aerators and shower heads, and a scaled-up heater warms water less efficiently. You can fight it with a water softener or a polyphosphate dosing unit fitted after the filter. Which one suits you depends on how hard your water is. Your water supplier can tell you, and a simple test kit from a DIY shop gives a good idea too.

Newer installations often use a manifold instead of one main pipe with branches. A separate pipe runs from the manifold to each basin, shower and toilet. When several taps run at once, the pressure stays steadier, and you can shut off each circuit on its own, for example when you change a tap.

Where to position the outlets

The exact position of the water outlets depends on the sanitaryware you choose. So pick your basin, taps and toilet before the plumber starts cutting channels in the wall. As a rough guide, outlets for a washbasin or kitchen sink sit about half a metre above the floor, outlets for a bath mixer a few dozen centimetres above the rim of the bath, and outlets for a shower mixer at around one metre. The manufacturer's data sheet always has the final word. This matters most with concealed mixers and WC frames, because they need a precise depth as well as height.

Looking at the wall from the front, hot water normally goes on the left and cold on the right. A pair of outlets for a wall-mounted mixer must match the standard spacing mixers are made for, and both outlets must sit exactly level. In practice it often happens that the outlets stick out too far from the tiles, or sit too deep. The mixer then does not fit flush against the wall, and extension pieces rarely look neat.

In the kitchen, place the outlets so you can reach them under the sink and they do not get in the way of the cabinet drawers. For a washing machine and dishwasher, plan an appliance valve with a non-return valve and a waste connection with a trap, so drain smells stay out of the room.

Drainage: fall, ventilation and noise

A waste pipe has to slope steadily down towards the soil stack. It must never rise again along the way, and it must not sag, because water sits in a dip and dirt builds up there. The toilet waste is wider than the others and the plumber plans its route first, since it is the hardest one to move later. The other wastes join it, or join the stack directly, with angled branches pointing in the direction the water flows.

Drainage also needs air. When a lot of water rushes down the stack, it creates suction that can pull the water out of the traps. A trap without water leaves an open path from the sewer into your home, and the bathroom starts to smell. That is why stacks are vented above the roof, and why longer waste runs get an air admittance valve.

In blocks of flats, think about noise as well. A plastic stack can carry the sound of running water through the whole building. Acoustically insulated pipe, insulation wrapped around the pipes and resilient brackets that do not fix the pipe rigidly to the wall all make a real difference.

Risers and water meters in blocks of flats

In a block of flats, the water and drainage risers are usually part of the common parts of the building. You do not replace them on your own: the building management or owners' association organises it, typically for a whole stairwell at once. Before you start redoing your bathroom, ask whether riser replacement is planned. If it is, time your renovation around it and adapt the plans.

Some older blocks still have soil stacks made of asbestos cement. An ordinary plumber must not cut or remove such pipe during a flat renovation. Only a contractor licensed for asbestos work may do this.

The water meters and the isolation valves on the supply into each flat are often sealed. If you want to move them, talk to the building management first. Isolation valves should sit behind an access panel where you can reach them, and before anyone works on the pipes, check that they really shut off completely.

For a larger rebuild of a bathroom or kitchen, especially if walls or the soil stack connection change, ask your local building authority whether you need a permit or a notification. Rules differ from country to country, so do not assume a simple notice will be enough.

Water heating: storage heater, instantaneous heater, indirect heating

In flats, water is most often heated by an electric storage water heater, a tank that keeps hot water ready. You choose its size according to how many people live with you and whether you take baths or mostly shower. It needs a safety valve on the cold water inlet. If the valve drips while the heater warms up, nothing is wrong: water expands as it heats and the extra has to go somewhere. That is why the valve connects to a waste pipe and must never be blocked off.

Inside the tank sits a magnesium anode that protects the steel from rust. It slowly dissolves, so it needs replacing after a few years. With hard water, it is a good moment to clear the limescale from the bottom of the tank as well. If you change the anode regularly, the heater lasts years longer.

If you have a gas boiler or a heat pump, your hot water is usually heated indirectly, in a cylinder connected to the heating system. Only a qualified, registered gas engineer may work on a gas boiler or gas pipes. If you ever smell gas, do not touch light switches or use any open flame, open the windows, get to a safe place and call 112 or your local emergency number.

An instantaneous water heater warms water only while you run it. It stores nothing, but it needs a high power supply, so check your electrical connection first. For long hot water runs, consider a circulation loop, so hot water reaches the tap straight away and you do not waste water waiting. It is also wise to heat stored water regularly to a sufficiently high temperature, because bacteria such as Legionella can multiply in lukewarm water that stands for a long time. Your heater's manual usually states the recommended setting.

Garden water and frost protection

Plan the outside tap and garden pipes so you can drain them before winter. A separate stopcock inside the house and a drain valve at the lowest point of the pipe make this easy. You can also fit a frost-proof outside tap. It closes the water deep inside the wall, in the warm part of the masonry, so no water stays in the outdoor section. In many places the water regulations also require a check valve on outside taps, so a garden hose cannot draw dirty water back into the mains.

Insulate any pipe that runs through unheated spaces, such as a cellar, a garage or a crawl space under a suspended floor. An outdoor water meter chamber has to be deep enough and properly covered so the meter does not freeze in winter.

Water leaks and how to prevent them

A leak is one of the most unpleasant and expensive kinds of damage. Water ruins floors and walls, and in a flat it often reaches the neighbours below. Where do leaks usually start? At the flexible connectors under taps, at washing machine and dishwasher connections, and at pipes that burst in frost. So replace flexible connectors as a precaution after some years, before they start leaking. For the washing machine and dishwasher, hoses with burst protection are worth having.

Another option is a leak protection system. Sensors on the floor next to the washing machine, under the sink and in the bathroom detect water and close the main valve automatically. And when you go away for a while, shut off the main water supply to your home. It takes a moment and can save a lot of trouble. It is also worth checking what your home insurance expects from you here.

DIY guide: cleaning a blocked trap and tap aerator

If your washbasin drains slowly or a tap gives only a weak flow, you can often sort it out without a plumber. All you need is a bucket, a cloth and a little patience.

  1. Place a bucket and a cloth under the washbasin trap.
  2. Loosen the bottom part of the trap or the nuts on the bend by hand and remove the trap carefully.
  3. Clear out dirt, hair and deposits, rinse the trap with warm water and check the seals.
  4. If possible, push a drain spring into the outlet in the wall and break up any blockage further along the pipe.
  5. Put the trap back together, hand-tighten the nuts and run the water. Check that the joints do not drip.
  6. Unscrew the aerator at the end of the tap spout, using pliers over a cloth if needed so you do not scratch it.
  7. Soak the aerator in vinegar or descaler for a few hours, rinse the little screens and screw the aerator back on.
  8. Use harsh chemical drain cleaners only as an exception. They damage seals, and if the drain is fully blocked they just sit in the pipe.

How to check a plumbing installation on handover

  • You have received a record of the pressure test carried out before the pipes were covered
  • You have photos of the pipes in walls and floors, with distances measured from corners and from the floor
  • The main stopcock and the isolation valves for each circuit are accessible and labelled
  • Every tap gives a good flow, even when water runs at several points at once
  • Wastes drain quickly without gurgling, and there is no smell from the traps
  • Under the washbasin, the sink and next to the washing machine everything stays dry after several minutes of running water
  • The water heater safety valve is connected to a waste pipe

Frequently asked questions

Under the current price list, a cold and hot water outlet costs €35.00 per point of labour. A drainage outlet is charged separately at €25.00 per point.

Related work

Package deals
Apartment Plumbing - Installation of New Water Supply Systems

What a fixed-price plumbing package for a flat covers, how the pipework is replaced, what makes the job harder and how to check the finished work.

Plumbing works
Chasing Channels for Water Installation (Concrete)

How channels for water pipes are cut into concrete, when to use a wall chaser, what to watch for in concrete blocks of flats and how to check the work.

Plumbing works
Installation and Recessing of Concealed Cisterns/Frames

How a concealed cistern frame or valve body is set into a wall, what to watch when chasing it in, and how to check the work before tiling.

Plumbing works
Installation of Concealed Shower Valve (iBox) - Shower Mixer

How a concealed shower valve body (iBox) is installed, what makes the job harder, the mistakes to avoid and how to check the finished work.

Plumbing works
Installation of Access Panels

How access panels are fitted into masonry, concrete, plasterboard and riser boxing. Choosing type and size, installation steps, typical mistakes and checks.

Plumbing works
Installation and Bedding of a Shower Channel

How a shower channel is set into the floor, connected to the waste, bedded in screed and waterproofed, and how to check the finished work.

Plumbing works
Shower screen installation

How a glass shower screen or bath screen is fitted, screen versus shower enclosure, choosing glass and doors, common mistakes and checks at handover.

Plumbing works
Washing Machine and Tumble Dryer Valve and Waste Installation

How a washing machine and tumble dryer valve and waste trap are fitted, which heights to follow, common mistakes and how to check the finished job.

Plumbing works
Terminal Valve Installation

How terminal valves are fitted under a basin, for a washing machine or on a radiator, which valve to choose and how to check the joint for leaks.

Plumbing works
Geberit Frame Installation & Connection (Duofix / Kombifix)

How a Geberit Duofix or Kombifix concealed WC frame is fitted, connected and boxed in, what makes the job harder and how to check the finished work.

Plumbing works
Connecting to a Cast Iron Soil Stack

How new plastic waste pipe is joined to an old cast iron soil stack, which adaptors are used and how to check that the joint is watertight.

Plumbing works
Shower enclosure installation with tray

How a complete shower enclosure with tray is fitted: the steps, tray or no tray, sizes and door types, common mistakes and what to check before first use.

Plumbing works
Installing a domestic treatment plant or cesspit

How a domestic sewage treatment plant or cesspit is set on a gravel bed, how groundwater and infiltration are handled and what to check.

Plumbing works
Fitting a wall-hung electric water heater

How a wall-hung electric water heater is fitted, where the safety valves and tundish go, who may install it in the UK and what to check afterwards.

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.