Installation of Concealed Shower Valve (iBox) - Shower Mixer

Installing a concealed shower valve (iBox) means fitting the hidden body of a built-in shower mixer into the wall before tiling. The guide price is €120.00 per piece, excluding the valve body and trim. The wall type and the number of outlets affect the price most.

Updated 09/2026·10 min read·27 price list items
Standard labour price
€120.00/ pcs
Indicative range
€96.00 - €156.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Installation of Concealed Shower Valve (iBox) - Shower Mixer

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Plumbing27 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Plumbing works cost

Install concealed shower valve body (iBox)pcs€120.00 / pcspcsenter quantity-
Installation of wall-hung WC duct framepcspcs-
Install and fit access panelspcs€45.00 / pcspcsenter quantity-
Installation of concealed WC framepcs€120.00 / pcspcsenter quantity-
Install and brick-up bathpcs€90.00 / pcspcsenter quantity-
Install ceramic basinpcs€50.00 / pcspcsenter quantity-
Shower tray installationpcs€130.00 / pcspcsenter quantity-
Install shower enclosure glass (screen)pcspcs-
Installation of shower enclosurepc€150.00 / pcpcenter quantity-
Install deck-mounted tappcs€35.00 / pcspcsenter quantity-
Install wall-mounted bath/shower mixerpcs€65.00 / pcspcsenter quantity-
Install concealed mixer tappcspcs-
Cold and hot water outlet pointpcs€35.00 / pcspcsenter quantity-
Internal waste and drainage outlet pointpcs€25.00 / pcspcsenter quantity-
Install washing machine/dishwasher valve and trappcspcs-
Hang and connect electric water heater up to 120 lpcs€104.35 / pcspcsenter quantity-
Install whole-house water filterpcs€55.00 / pcspcsenter quantity-
Installation of domestic sewage treatment plant / septic tank on gravel bedpc€600.00 / pcpcenter quantity-
Hot water circulation pipeworklmlm-
Pressure test internal water supply pipeworkhrhr-
Chase cutting for plumbing (concrete)lm€29.00 / lmlmenter quantity-
Make good walls after plumbinglm€8.50 / lmlmenter quantity-
Install and chase in concealed valve bodypcs€95.00 / pcspcsenter quantity-
Install shower channel + screed inpcspcs-
Install stopcocks / isolation valvespcs€13.00 / pcspcsenter quantity-
Install valve for dryer/washer + wastepcs€55.00 / pcspcsenter quantity-
Connect pipework to cast iron waste stackpcspcs-
Total labour
- enter quantity
Create quote from price list →

What a concealed shower valve body is and when it is needed

The valve body is the hidden part of a concealed shower mixer. Many people call it an iBox. That is the trade name of one manufacturer's product, and it has become a general name for all similar products. Other manufacturers sell their own valve bodies under different names.

The body is fitted into the wall before tiling. Hot and cold supplies are connected to it, along with the outlets to the fixed shower head or the handset. Once the bathroom is finished, only the wall plate with the lever or thermostatic control is visible.

This work is needed:

  • for a new bathroom in a new build or during first fix,
  • in a renovation, when an exposed bar mixer is replaced with a concealed one,
  • when an old valve body leaks or spare parts are no longer available.

The body is a metal or plastic housing with hot and cold inlets and outlets for the shower. A working unit is fitted into it later. This can be a standard lever cartridge or a thermostatic cartridge, and with two outlets also a diverter between the shower head and the handset. Many valve bodies are universal, so several types of control can be fitted to the same base. Some bodies have built-in isolation valves. These allow the cartridge to be replaced later without turning off the water to the whole home.

The body stays buried in the wall behind the tiles. Once covered, changing to a different system almost always means removing tiles. The choice is therefore worth thinking through carefully. It is one of the more permanent decisions in plumbing work for a bathroom.

What to decide before the plumber arrives

With a concealed shower, most decisions are made at once and for good. Later changes are expensive, so the following points should be settled in advance.

Manual or thermostatic control

A manual lever mixer is simple and easy to repair. A thermostatic valve holds the set temperature even when someone else in the home runs a tap, and it protects against scalding. This is especially useful for families with children and for older people. A thermostatic cartridge is, however, more sensitive to limescale and debris from the pipework. In hard water areas, a filter or water softener is worth considering. It is also worth checking that the chosen valve suits the water system in the home, for example a combi boiler, an unvented cylinder or a gravity-fed system.

One or two outlets

A shower head and a handset together need a valve body with two outlets and a diverter. Decide early, because adding another outlet to a finished wall is difficult. A handset is useful not only for washing but also for rinsing the walls and floor of the shower area. If it is a possibility, have it prepared from the start.

Valve body and trim from the same system

Before installation, check that the chosen trim is compatible with the valve body. Manufacturers state this in the technical data sheet. The safest approach is to buy the body and the trim at the same time, from one manufacturer and from one product range.

Height and position

The control is usually placed roughly 100 to 120 cm above the finished floor. The shower head sits higher, depending on the height of the people in the household. Also consider which side the shower is entered from. The control should be within reach before the water hits the user.

Thickness of the future tiling

The installation depth depends on where the finished wall surface will be. Each valve body has a minimum and maximum installation depth set by the manufacturer, given in the technical data sheet. The plumber therefore needs to know what tiles will go on the wall and whether they will be fixed to plaster, tanking or a stud wall. Large-format tiles and natural stone need a thicker layer of tile and adhesive than standard tiles. Wall tiling should follow the BS 5385 code of practice, with the background prepared and the adhesive chosen to suit the tile size and weight.

Who does the tanking

The plumber fits the valve body and prepares it for sealing. Tanking of the shower wall, however, is often done by the tiler. Agree in advance who fits the sealing collars around the valve body and outlets, and who is responsible for a continuous waterproof layer. If this is not clear, it can easily end up being done by nobody.

Flats and loadbearing walls

In a block of flats, agree with the managing agent or freeholder in advance if the water supply to a shared riser needs to be shut off. Deep chases must not be cut into loadbearing concrete walls without an assessment, so a plasterboard stud wall is often used instead. If the renovation would affect the structure, consult a structural engineer. Check with local building control whether anything needs to be notified or approved. Simply replacing bathroom fittings does not usually need approval, but only the local authority can confirm this. Some plumbing work, such as certain bidets, pumps or large baths, must be notified to your water company before you start, unless you use an approved (WaterSafe) plumber who can self-certify.

How the installation is done step by step

The plumber works roughly in this order:

  1. Agreeing the position: together with the client, sets the height of the control, the position of the shower head and handset, and the side on which the control will sit.
  2. Turning off the water and marking out: shuts off the water and marks the position of the valve body and the pipe routes on the wall.
  3. Preparing the wall: cuts or chases the opening and channels, or builds the support frame in a plasterboard stud wall. If a WC frame is going into the same false wall, it makes sense to coordinate with the installation of a concealed cistern frame.
  4. Fitting the valve body: sets it level and at the correct depth. The protective plaster guard usually shows the range within which the finished tile surface must end.
  5. Connecting the water: connects hot on the left and cold on the right, as is the usual convention, and connects the shower outlets.
  6. Fixing: secures the valve body and the pipes firmly so that nothing moves during plastering and the pipes do not bang later.
  7. Pressure test: carries it out according to the applicable standards and the manufacturer's instructions, before the wall is closed. The pipework is filled with water at a higher pressure than in normal use, in practice about 1.5 times the working pressure. The plumber then checks that the pressure does not drop over the specified time and that there are no leaks. The exact value and duration are set by the applicable standards and the pipe manufacturer.
  8. Closing the wall: fills the chases and prepares the wall for tiling. Sealing collars are fitted around the valve body and the tanking is joined to them, by the plumber or the tiler as agreed. The protective guard stays on the body throughout tiling and grouting, so that no adhesive or dust gets inside.
  9. Fitting the trim: only after tiling, once the grout and the area around the body are finished, is the working unit fitted together with the wall plate and lever or thermostatic control. Before the cartridge goes in, the pipework is usually flushed so that sand and debris do not get into it.

What affects the price

The guide labour price is €120.00 per piece. The final cost depends mainly on the type and condition of the wall:

  • Open wall in a new build: the simplest case. The wall is at first fix stage, the pipes can be run directly and the price stays near the lower end.
  • Plasterboard stud wall: makes installation easier, as there is no need to cut into masonry. The stud wall itself is, however, a separate job with extra materials.
  • Brick or concrete: brick is relatively easy to chase. Concrete is hard, so cutting and chasing take much longer and noticeably increase the cost. For more detail, see chasing channels for water pipes in concrete.
  • Replacing an old valve body: usually harder than it looks. Tiles have to be removed, the old body taken out and the existing pipework adapted. The price can be up to double that of fitting into an open wall.
  • Number of outlets: more complex setups with several outlets and a diverter mean more joints, more chases and longer work.
  • New pipework: if hot and cold supplies have to be brought from elsewhere, they are usually charged separately per running metre.
  • What is included: the labour price normally does not include the valve body or the trim. When comparing quotes, ask whether the pressure test, sealing collars and later fitting of the trim are included.

What makes the job easier and what slows it down

The plumber works faster and with less risk of mistakes when the following is ready on site:

  • the valve body and trim are bought and on site together with the technical data sheet, not just chosen from a catalogue,
  • it is clear what tiles will go on the wall and how thick they will be with adhesive,
  • the heights of the control and showers are decided and ideally marked on the wall,
  • shutting off the water to a shared riser is agreed with the managing agent for a specific date,
  • the bathroom is cleared, access is free and the hallway is protected from dust,
  • the timing is coordinated with the tiler, so that the wall is not covered before the pressure test has been done and checked.

The job takes longer when the valve body is bought only during installation, when the shower height changes at the last minute, or when the water in the building cannot be shut off in time.

Typical mistakes with concealed shower valves and how they show up later

Valve body too deep or too shallow

The trim cannot be pulled tight to the tiles, or it sticks out from them. Extension kits exist only for some systems and only within a limited range.

Valve body not level

The whole wall plate is then crooked as well, which is very noticeable with regular tiling.

Hot and cold supplies swapped

This shows up mainly with a thermostatic valve, which then does not work properly or delivers the opposite temperature.

Missing or poorly done pressure test

A leaking joint only shows after tiling, as a damp patch or mould on the wall or on the other side of it.

Missing sealing collars and tanking around the valve body

Shower water gets behind the tiles through the opening around the wall plate. This often happens when the plumber and tiler have not agreed who does this part.

Poorly secured pipework

The pipes bang and vibrate when water flows, often audibly in the neighbouring flat.

Valve body and trim that do not match

The trim cannot be fitted to the body or does not work correctly. The usual fix is opening up the wall.

All of these mistakes only show up after tiling. That is why the work should be checked before the wall is covered.

How to check the finished work

Before tiling

  • the pressure test has been carried out and no joints leaked during it,
  • the valve body is level, which can be checked with an ordinary spirit level,
  • its depth matches the range marked on the protective guard for the planned tiling,
  • the valve body and pipes are firm and do not move when pushed,
  • sealing collars are fitted around the body and the tanking is continuous,
  • the protective guard is on the valve body,
  • photos of the wall showing the pipework and measurements have been taken, so it is known later where not to drill.

After the trim is fitted

  • hot water comes from the correct side,
  • the thermostat holds the temperature and the diverter switches reliably between the showers,
  • the wall plate sits flush to the tiles all the way round and is not crooked,
  • nothing bangs or whistles when the water is turned on and off,
  • after a few days of use there are no damp spots on or below the wall,
  • the technical data sheet and instructions for the valve body have been handed over, so it is known which cartridges and parts belong to it.

Frequently asked questions

As a guide, €120.00 per piece. The price rises mainly with a hard concrete wall, replacement of an old valve body including tile removal, more outlets and the need for new pipework. The valve body and trim are usually paid for separately.