Building work price list: Installation and Recessing of Concealed Cisterns/Frames
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Plumbing works cost | ||||
| Install and chase in concealed valve body | pcs | €95.00 / pcs | pcs | enter quantity- |
| Installation of wall-hung WC duct frame | pcs | pcs | - | |
| Install and fit access panels | pcs | €45.00 / pcs | pcs | enter quantity- |
| Installation of concealed WC frame | pcs | €120.00 / pcs | pcs | enter quantity- |
| Install and brick-up bath | pcs | €90.00 / pcs | pcs | enter quantity- |
| Install ceramic basin | pcs | €50.00 / pcs | pcs | enter quantity- |
| Shower tray installation | pcs | €130.00 / pcs | pcs | enter quantity- |
| Install shower enclosure glass (screen) | pcs | pcs | - | |
| Installation of shower enclosure | pc | €150.00 / pc | pc | enter quantity- |
| Install deck-mounted tap | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install wall-mounted bath/shower mixer | pcs | €65.00 / pcs | pcs | enter quantity- |
| Install concealed shower valve body (iBox) | pcs | pcs | - | |
| Install concealed mixer tap | pcs | pcs | - | |
| Cold and hot water outlet point | pcs | €35.00 / pcs | pcs | enter quantity- |
| Internal waste and drainage outlet point | pcs | €25.00 / pcs | pcs | enter quantity- |
| Install washing machine/dishwasher valve and trap | pcs | pcs | - | |
| Hang and connect electric water heater up to 120 l | pcs | €104.35 / pcs | pcs | enter quantity- |
| Install whole-house water filter | pcs | €55.00 / pcs | pcs | enter quantity- |
| Installation of domestic sewage treatment plant / septic tank on gravel bed | pc | €600.00 / pc | pc | enter quantity- |
| Hot water circulation pipework | lm | lm | - | |
| Pressure test internal water supply pipework | hr | hr | - | |
| Chase cutting for plumbing (concrete) | lm | €29.00 / lm | lm | enter quantity- |
| Make good walls after plumbing | lm | €8.50 / lm | lm | enter quantity- |
| Install shower channel + screed in | pcs | pcs | - | |
| Install stopcocks / isolation valves | pcs | €13.00 / pcs | pcs | enter quantity- |
| Install valve for dryer/washer + waste | pcs | €55.00 / pcs | pcs | enter quantity- |
| Connect pipework to cast iron waste stack | pcs | pcs | - | |
What a concealed body is and when it is needed
Once the wall is tiled, only the lever handle, the spout or the flush plate is visible. Everything else stays hidden. This work comes up during a bathroom refurbishment or in a new build, when clean walls without exposed pipework are wanted. It covers cutting the opening and the chases, setting the body to the correct depth, fixing it and connecting it to the water supply. It forms part of plumbing work and is usually planned together with the rest of the bathroom.
The term "concealed body" covers several different products. Most often it means:
- the body of a concealed shower or bath valve, to which a handset or overhead shower is later connected,
- the body of a wall-mounted basin mixer, from which only the spout and lever emerge,
- a concealed WC frame, a steel frame with a built-in cistern on which a wall-hung pan is mounted.
The procedure is similar, the difference lies in the dimensions and how much wall has to be removed. For a mixer, an opening for the body itself and chases for the hot and cold supplies are enough. For a WC frame in a masonry wall, a larger area is often cut back, or the frame is built in front of the wall and boxed in with plasterboard. In a plasterboard stud partition nothing is cut out of masonry - the body is screwed to the metal studwork or to a mounting board.
If the WC flush plate is to be illuminated or electronically operated, the electrical supply to it must be installed by a qualified electrician, not by the plumber. A new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start.
What to decide before any cutting into the wall
Once tiled, the body cannot be moved or turned without breaking out the wall. Most of the important decisions are therefore made before the first cut.
- The exact valve or frame model. The installer needs the body and its installation instructions on site at the marking-out stage, because dimensions and depths vary between manufacturers.
- The tiles. The setting depth of the body depends on their thickness. The tiles should be chosen before installation.
- Control height. A shower valve is usually set at roughly 100 to 120 cm above the floor, depending on the height of the people in the household and whether an overhead shower is planned. A bath valve is set considerably lower, above the bath rim, so it can be operated from the bath. The exact height is determined by the manufacturer and the type of bath.
- Position relative to the tiles. Agree whether the control should sit in the centre of a tile or on a grout intersection, so the trim plate does not end up awkwardly on a tile edge.
- Wall type. Will the body be recessed into a masonry wall, or will a plasterboard service wall be built? In blocks of flats with concrete walls, the condition of the load-bearing walls often decides this.
- Where the water comes from. Where the risers and isolation valves are, what pipe will be used for the connection and whether it makes sense to replace the old pipework at the same time. Some plumbing work, such as certain bidets, pumps or large baths, must be notified to your water company before you start, unless you use an approved (WaterSafe) plumber who can self-certify.
Load-bearing walls and blocks of flats: what to keep in mind
In concrete blocks of flats, the walls around the bathroom are often load-bearing. A load-bearing wall must not be cut into freely - horizontal chases and larger openings in particular can weaken the structure. Before starting, contact the managing agent or freeholder and find out what rules apply in the building.
Alterations to load-bearing structures may need approval. Check with the local authority's building control what applies in the specific case. In Scotland, structural alterations, including building or removing load-bearing walls, need a building warrant from the council before work starts. A larger intervention in a load-bearing wall usually requires an assessment by a structural engineer. A common solution is a plasterboard service wall into which the body is fitted without cutting into the load-bearing wall.
The connection to the riser and shutting off water for the whole building concern the communal parts. Here, too, agree in advance with the managing agent so that neighbours know when the water will be off.
How deep to set a concealed body
The correct depth decides whether the visible part of the valve will sit properly after tiling. Most bodies have minimum and maximum depth marks on the protective plastic cover. These marks do not refer to the bare masonry but to the finished wall surface, including adhesive and tiles.
The installer therefore needs to know the thickness of the adhesive and tile layer and sets the body further out or further in accordingly. In practice, the opening in the wall is about 7 to 12 cm deep, but the exact figure depends on the specific body. If the tiles are changed after installation and have a different thickness, the body may no longer fit, and an extension piece does not always solve the problem.
How a concealed body is installed, step by step
- Marking out: following the manufacturer's installation instructions, the centre line of the body, its height and the positions of the supplies are marked on the wall. For a WC frame, the pan and flush plate heights are set according to the instructions, and the frame has marks for this. The tile layout is planned at the same time.
- Checking for services in the wall: before cutting, the wall is scanned with a detector to avoid hitting an electrical cable or another pipe. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Isolating the water: before working on the pipework, the water is turned off and the pressure released from the pipes.
- Cutting the chases: chases are cut with a wall chaser connected to dust extraction. They run vertically or horizontally, never diagonally, so that the pipe route can be estimated later. In hard walls this is a job in its own right, as described for chasing channels for water pipes in concrete.
- Cutting the opening for the body: the opening is cut with a core drill or broken out with an SDS hammer drill to the depth the body requires.
- Setting to the correct depth: the most important step. The body is adjusted to the marks on the cover and the planned tiles. It must be level and plumb, otherwise the trim plate or flush plate will sit crooked.
- Mechanical fixing: the body is secured to the wall with screws or brackets.
- Connecting the supplies: hot and cold water are connected using multilayer composite, PPR or copper pipe, depending on the system in the property. For a shower valve, the outlet to the shower is connected as well. The specifics of shower valves are covered in more detail under installation of a concealed shower valve (iBox).
- Pressure test: before the body is built in, a pressure test is carried out according to the pipe manufacturer's instructions. The joints must stay dry.
- Securing and making good: only once the joints are sound is the body fixed solid and the chases filled. Around showers and baths, in the wet zone, cement mortar or a compound approved by the body manufacturer is used. Gypsum plaster is not suitable for the wet zone, although some manufacturers allow it in the dry part of the wall. Expanding foam alone is not enough, because the body may work loose with lever operation and pressure surges. The protective cover stays on.
- Waterproofing: in the shower wet zone, a tanking system with special sealing collars around the outlets follows, so water cannot get behind the tiles.
- Tiling and finishing: after tiling, the protective cover is trimmed according to the instructions and the visible part of the valve, the trim plate or the flush plate is fitted.
What the price of installing a concealed body depends on
The guide labour price is €95.00 per piece. The per-piece price assumes a standard installation of one body. The actual amount moves up or down with these factors:
- Wall material. Aircrete blocks cut easily and quickly, so the price stays at the lower end. In a plasterboard partition or service wall nothing is cut at all - the body is simply screwed to the framework. Clay brick is common, but with hollow clay blocks the opening must be well filled so the body holds firm. Concrete and reinforced concrete panels are the hardest - cutting is slow, noisy and dusty, and reinforcement is often hit. Work in concrete takes considerably longer, easily twice as long as in aircrete.
- Old mixed walls. Brick combined with concrete and various older repairs bring surprises, and the body is harder to anchor. Installers often charge a supplement for this or bill the actual time spent.
- Type of body. A basin mixer body with two supplies is the simplest. A shower valve with a diverter for several outlets means more chases and joints. A WC frame in a masonry wall, where a larger area has to be cut back, is among the most demanding options.
- Length and route of the supplies. The further the body is from the riser or existing pipework, the more chasing and pipe is needed. Running pipes through another room extends the work considerably. Longer chases are often priced as a separate item - check this in the quote.
- Condition of the existing pipework. Old galvanised steel pipework that the new body cannot safely be connected to must be replaced first. That is separate work beyond setting the body.
- Related work. Making good the chases, tanking, a service wall, removing tiles around the body or taking away rubble may not be included in the per-piece price. When comparing quotes, ask exactly what the price covers.
What makes the job easier and what slows it down
Besides the wall itself, the customer's preparation makes a big difference:
- Helps: a bathroom stripped back to bare masonry, the body and the visible trim bought and on site, tiles chosen, control heights drawn or agreed, access to the main stopcock and a clear route for removing rubble.
- Slows down: a body still on order, a change of valve position during the work, missing installation instructions, a furnished and occupied home that needs protecting from dust, or a water shut-off not agreed with the managing agent.
A planned sequence of trades also helps. The plumber sets the body and carries out the pressure test, then the making good and tanking follow, and only after the mortar has cured does the tiler start. The visible part of the valve is fitted only after tiling.
Mistakes that only show after tiling
- Wrong body depth: if the body is too deep, an extension piece may not be enough. If it is too shallow, the trim plate stands proud of the tiles and the gap is hard to seal.
- Body not level: the lever or flush plate sits crooked and this cannot be corrected without breaking out the tiles.
- No pressure test: a leaking joint shows up as a damp patch on the wall or in the neighbour's flat, often only after months.
- Fixed with foam only: the body moves over time, damages the seal or the tiles, and the valve starts to feel loose in use.
- Gypsum plaster in the wet zone: it softens with long-term moisture and the body loses its support.
- No waterproofing around the outlets: water gets behind the tiles, the masonry becomes damp and the tiles may come loose.
- Hot and cold swapped: the valve works the wrong way round, and thermostatic valves may not regulate temperature correctly.
- Protective cover removed during the works: mortar or adhesive gets into the body and the cartridge is damaged before first use.
- Installation instructions thrown away: spare parts are hard to find when servicing or replacing the cartridge. For WC frames, consider in advance how the cistern will be reached - usually through the flush plate opening, and for other concealed fittings an access panel may be worth planning in.
How to check the installed body at handover
Before the wall is closed and tiled, go through these points with the installer:
- the body is firmly fixed and does not move when pushed,
- it is level and plumb, and the centre line matches the marking out,
- the depth corresponds to the marks on the cover,
- hot and cold water are connected to the correct sides,
- the pressure test has been carried out and the joints are dry,
- the protective cover is still in place so no mortar can get in,
- the chases run vertically or horizontally,
- sealing collars are fitted around the outlets in the wet zone,
- photographs have been taken of the wall showing the pipe routes before it is closed,
- the installation instructions and documents for the body are kept for future servicing.
After tiling and fitting the visible part, also check that the trim plate sits against the tiles without a gap, the lever turns smoothly, the diverter between outlets works and the area around the valve stays dry after several uses.
Frequently asked questions
The guide price is €95.00 per piece. The final amount depends mainly on the wall material, the type of body, the length of the supplies and whether making good the chases, tanking and rubble removal are included.
It is not recommended for non-professionals. Before cutting, it must be checked that no electrical cable or other pipe runs in the wall, and in a block of flats the rules for load-bearing walls must first be cleared with the managing agent and building control. Accurate setting, connection and pressure testing require experience, and a mistake only shows after tiling, when repair is most expensive.
Yes, the body and the trim cannot be mixed between manufacturers. Some manufacturers do, however, offer universal bodies that accept trims from several of their ranges. Before buying, check in the catalogue which trims a particular body supports.
Usually it is enough to remove the trim plate and replace the cartridge - the wall is not broken out. That is why a quality body with available spare parts matters.
Yes, but the tiles around the body and chases must be removed and replaced after installation. Without matching tiles the repair will be visible, so this work is usually done together with new tiling.
In lightweight masonry with a short supply run, it is usually a few hours' work. In concrete, with longer pipe runs or with a WC frame in a masonry wall, it takes longer. Time must also be allowed for the mortar to cure before tiling.
With a load-bearing wall in a concrete block of flats, a plasterboard service wall is often the only sensible solution, because the structure is not touched. It does, however, take several centimetres off the bathroom floor area. In a non-load-bearing masonry wall, the body is normally recessed directly.
Related work
How channels for water pipes are cut into concrete, when to use a wall chaser, what to watch for in concrete blocks of flats and how to check the work.
How a concealed shower valve body (iBox) is installed, what makes the job harder, the mistakes to avoid and how to check the finished work.
How access panels are fitted into masonry, concrete, plasterboard and riser boxing. Choosing type and size, installation steps, typical mistakes and checks.
How a shower channel is set into the floor, connected to the waste, bedded in screed and waterproofed, and how to check the finished work.
How a glass shower screen or bath screen is fitted, screen versus shower enclosure, choosing glass and doors, common mistakes and checks at handover.
How a washing machine and tumble dryer valve and waste trap are fitted, which heights to follow, common mistakes and how to check the finished job.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.