Building work price list: Chasing Channels for Water Installation (Concrete)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Plumbing works cost | ||||
| Chase cutting for plumbing (concrete) | lm | €29.00 / lm | lm | enter quantity- |
| Installation of wall-hung WC duct frame | pcs | pcs | - | |
| Install and fit access panels | pcs | €45.00 / pcs | pcs | enter quantity- |
| Installation of concealed WC frame | pcs | €120.00 / pcs | pcs | enter quantity- |
| Install and brick-up bath | pcs | €90.00 / pcs | pcs | enter quantity- |
| Install ceramic basin | pcs | €50.00 / pcs | pcs | enter quantity- |
| Shower tray installation | pcs | €130.00 / pcs | pcs | enter quantity- |
| Install shower enclosure glass (screen) | pcs | pcs | - | |
| Installation of shower enclosure | pc | €150.00 / pc | pc | enter quantity- |
| Install deck-mounted tap | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install wall-mounted bath/shower mixer | pcs | €65.00 / pcs | pcs | enter quantity- |
| Install concealed shower valve body (iBox) | pcs | pcs | - | |
| Install concealed mixer tap | pcs | pcs | - | |
| Cold and hot water outlet point | pcs | €35.00 / pcs | pcs | enter quantity- |
| Internal waste and drainage outlet point | pcs | €25.00 / pcs | pcs | enter quantity- |
| Install washing machine/dishwasher valve and trap | pcs | pcs | - | |
| Hang and connect electric water heater up to 120 l | pcs | €104.35 / pcs | pcs | enter quantity- |
| Install whole-house water filter | pcs | €55.00 / pcs | pcs | enter quantity- |
| Installation of domestic sewage treatment plant / septic tank on gravel bed | pc | €600.00 / pc | pc | enter quantity- |
| Hot water circulation pipework | lm | lm | - | |
| Pressure test internal water supply pipework | hr | hr | - | |
| Make good walls after plumbing | lm | €8.50 / lm | lm | enter quantity- |
| Install and chase in concealed valve body | pcs | €95.00 / pcs | pcs | enter quantity- |
| Install shower channel + screed in | pcs | pcs | - | |
| Install stopcocks / isolation valves | pcs | €13.00 / pcs | pcs | enter quantity- |
| Install valve for dryer/washer + waste | pcs | €55.00 / pcs | pcs | enter quantity- |
| Connect pipework to cast iron waste stack | pcs | pcs | - | |
What chasing for water pipes is and when it is needed
A channel, or chase, is cut into a concrete wall or floor. The plumber lays the pipe in it and the chase is then filled. The pipework is hidden, and the wall can be plastered or tiled. This work is part of most bathroom and kitchen refurbishments. It is also needed when a basin or washing machine is moved, when old galvanised steel pipes are replaced with plastic or multilayer pipe, and for any new pipe run that should not be surface-mounted. For an overview of the related trades, see plumbing work.
The quality of the chase decides how well the pipe is protected, how easily the wall can be made flat and whether the tiles will crack later. Chasing is only the first step. After it come laying the pipework, a pressure test and making good the chases. Only then is the wall plastered or tiled.
What to decide before any chasing starts
A chase in concrete should be cut once. Every change after cutting means more chasing, more dust and a larger wall repair. Agree the following in advance:
- Exact outlet positions: taps for the basin, bath and shower, the WC, washing machine, dishwasher and kitchen sink. For a kitchen, a finished unit layout with the worktop height helps. For a bathroom, the position of each fitting. If a concealed shower valve is planned, its position and recess depth should be fixed before chasing.
- Which pipe will be used: the diameter of the plastic or multilayer pipe and the thickness of its insulation set the required depth and width of the chase.
- Which walls may be chased: in concrete blocks of flats many walls are load-bearing. Details follow in the next section.
- Pipe routes in relation to furniture: pipes should not run where cabinets, a mirror, brackets or kitchen units will be fixed.
- What the price includes: whether rubble removal, making good and hand chasing in corners are included, or charged as separate items.
Based on the outlet positions, the tradesperson plans the shortest route with as few bends and joints as possible. Fewer joints in the wall means fewer places that can leak later.
Concrete flats: load-bearing walls, the building management and building control
In flats built from precast concrete panels, most walls and all floor slabs are reinforced concrete. Many internal walls are load-bearing, and the reinforcement often sits only a few centimetres below the surface, frequently around 1.5 to 2.5 cm. The commonly quoted chase depth of 3 to 5 cm would almost certainly hit it in such a panel. Cut reinforcement weakens a panel that also carries the flats above.
- Chase load-bearing walls only after assessment by a structural engineer, who will also set the permitted depth. Horizontal chases need particular care, as they weaken a load-bearing wall more than vertical ones.
- Floor slabs and ceiling panels are not chased for water pipes.
- Before work starts, inform the managing agent or freeholder. Many have their own rules for structural alterations and for noisy work at certain hours, and a lease may require written consent.
- Check with building control whether work to the load-bearing structure needs approval. Do not assume that a simple notification is enough.
Where a route through a load-bearing wall cannot be avoided, the usual solution is a stud wall or false wall of plasterboard or an installation frame system, in which the pipes run without chasing. In a bathroom this is often useful anyway, because it allows the installation of a concealed cistern and frame for a wall-hung WC.
How chasing is carried out step by step
- Isolating the water: where work is near existing pipework, the supply to the affected part of the property is turned off and drained.
- Locating hidden services: the wall is scanned with a cable and pipe detector and the result is compared with any available drawings, especially for electrics, gas and heating.
- Marking out: routes are drawn on the wall in pencil using a spirit level or laser, vertically and horizontally only.
- Protection and dust extraction: floors and furniture are covered with sheeting, doorways are sealed and a vacuum extractor is connected to the wall chaser.
- Cutting: the wall chaser cuts two parallel lines at the set depth.
- Breaking out: the strip of concrete between the cuts is removed with a light breaker or chisel.
- Cleaning and checking: the chase is cleaned out, depth and width are checked and loose pieces are removed.
- Laying the pipework: the plumber lays the pipe in insulation sleeves and clips it so it does not move in the chase.
- Pressure test and photographs: the system is pressurised and checked, and the routes are photographed with the distances from corners and floor visible.
- Making good: only once the system holds pressure is the chase filled flush with sand and cement mortar or a suitable repair compound.
Hand chasing or a wall chaser
For concrete, a wall chaser with twin diamond blades is the usual tool. It cuts accurately, the depth is set in advance and with an extractor connected there is far less dust. The wall does not take unnecessary blows, so the surrounding plaster and concrete stay sound.
A wall chaser has its limits. It is slow on hard reinforced concrete, the blades wear quickly and a standard chaser is sometimes not up to the job. When the blade hits reinforcement, it stalls or starts to spark. That is a sign to stop, not to push harder: reinforcement must not be cut, and the route needs to be moved or changed.
Hand chasing with a hammer and chisel, or with a breaker alone without pre-cutting, makes sense where a chaser will not fit: in corners, behind risers and next to door frames. It is slow, the chase tends to be wider and irregular, and a larger piece of material often breaks away around it and has to be filled. A narrow, straight chase, by contrast, is quick to make good, uses little mortar and leaves no bumps under tiles.
Price of chasing concrete per running metre
Chasing is priced per running metre, that is by the length of the chase. The guide labour price is €29.00 per running metre. The final figure may differ depending on how demanding the particular wall is:
- Wall material: plain concrete cuts more easily than hard reinforced concrete with dense reinforcement. Reinforced concrete makes the work noticeably slower and wears the blades faster.
- Depth and width: larger pipe with insulation needs a deeper and wider chase, so more cutting and breaking out per metre.
- Number of outlets and branches: each outlet and branch means another cut. Many short sections cost more per metre than one long straight run.
- Hand chasing: sections in corners, behind a riser or next to a door frame, where the chaser cannot reach, take several times longer than a plain wall.
- Access and height: a small bathroom and runs near the ceiling that need a stepladder or scaffold tower slow the work down.
- Unknown services: without drawings, locating cables and other services takes longer and sometimes forces a route change.
- Existing tiles: if tiles have to be removed first, that is separate work and is added to the price.
- Related items: rubble removal, making good and a structural engineer's assessment are often charged separately. When comparing quotes, ask exactly what each one includes.
What makes the work easier and what slows it down
Good preparation on the client's side saves a lot of time:
- the room is cleared, with no furniture or appliances that would need covering and moving,
- outlet positions are agreed in advance and do not change during the work,
- the location of the main stopcock and the consumer unit is known, with clear access to both,
- there is a working socket for the chaser and extractor, or a temporary supply if the electrics are disconnected,
- the building management and neighbours know about the noisy work, and chasing is scheduled within permitted hours,
- it is agreed where rubble will be stored and who will take it away, after checking that the carrier is registered with the Environment Agency and will provide a waste transfer note,
- the plumber follows on as soon as possible after chasing, so open chases do not sit and collect debris.
The work takes longer when routes are still being adjusted during chasing, when other trades are working in the property at the same time, or when the tradesperson has to stop frequently because of building rules.
Typical mistakes and how they show up later
Diagonal chases. Chases are sometimes run diagonally to shorten the route. A few years later someone drills that wall for a shelf and hits the pipe. Vertical and horizontal routes can be predicted reasonably well even without a plan.
Chase too shallow. The pipe stands proud, the plaster over it cracks and condensation can form on cold water pipes. Under tiles this shows as a bump or a cracked tile.
Chase too deep. It weakens the wall unnecessarily and in a concrete panel reaches the reinforcement. A depth of roughly 3 to 5 cm and a width of about 4 to 6 cm are commonly quoted, but always according to the diameter of the insulated pipe and the wall material. In a load-bearing panel, the structural engineer decides the depth, not this guide figure.
Covering up without a pressure test or photographs. A leaking joint under tiles means breaking open a finished wall. Without photographs it is hard to find the pipe route later. Where a joint or valve has to stay accessible, access panel installation is worth planning from the start.
Hot water pipe without a sleeve. A hot water pipe moves slightly with temperature changes. Without a sleeve, the plaster over it can crack.
Damaged wall around the chase. Breaking out without pre-cutting loosens the surrounding material. The repair then covers a larger area and the wall is harder to level for tiling.
Underestimating safety. Concrete dust contains silica and is harmful to the lungs. An FFP2 or FFP3 mask, safety glasses, ear defenders and dust extraction are essential. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. If a gas pipe is damaged during the work, stop immediately, do not use electrical switches, appliances or naked flames, ventilate, leave the property and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). Any repair to the gas pipe must then be done by a Gas Safe registered engineer. If an electrical cable is hit, switch off at the consumer unit and call an electrician.
Checking the work before it is covered
Before the chases are made good, go through these points with the tradesperson:
- chases run only vertically and horizontally along the agreed routes,
- outlets are in the agreed positions and at the heights set by the kitchen or bathroom design,
- depth and width suit the insulated pipe, and the pipe does not stand proud of the wall face anywhere,
- chase edges are straight and the surrounding plaster is not loose,
- no electrical, gas or heating service has been damaged,
- in load-bearing walls the structural engineer's instructions were followed and no reinforcement has been cut,
- the pipe is clipped, sleeved, has passed the pressure test and the routes are photographed,
- chases are filled solidly and flush with the surface, ready for plaster or tiles,
- rubble has been removed and the area cleaned as agreed.
Frequently asked questions
The guide price is €29.00 per running metre. Expect to pay more for hard reinforced concrete, deep chases, many short branches and sections that have to be cut by hand. Rubble removal and making good are usually separate items.
In a concrete-panel flat it is not recommended, because the work affects a reinforced concrete structure and there may be hidden cables in the wall. The homeowner can prepare the room, clear the furniture and plan the outlet positions. The cutting itself is better left to a tradesperson with a wall chaser, detector and dust extraction.
With a wall chaser and an empty room, the chases for a typical bathroom are usually done within one day. A whole flat with kitchen, bathroom and WC may take around one to two days. Hand chasing and hard reinforced concrete add time.
Ceiling slabs are not chased for water pipes. In floors, pipes are normally run within the floor build-up above the structural slab, if it is thick enough. Otherwise a route in a wall or a stud wall is chosen.
Stop work and do not cut through the reinforcement. Most often the route is moved or the chase made smaller, or the pipe is run in a stud wall. If the reinforcement is already damaged, have it assessed by a structural engineer.
Ordinary chases in non-load-bearing partitions do not usually need approval, but in a block of flats always inform the managing agent or freeholder and check the lease. For work to load-bearing walls, check the procedure with building control and obtain a structural engineer's assessment.
Only once the mortar or repair compound has dried and cured. The time depends on the product, the layer thickness and the room temperature, and the manufacturer states it on the packaging. Before tiling, the wall is usually levelled and primed.
Related work
How a concealed cistern frame or valve body is set into a wall, what to watch when chasing it in, and how to check the work before tiling.
How a concealed shower valve body (iBox) is installed, what makes the job harder, the mistakes to avoid and how to check the finished work.
How access panels are fitted into masonry, concrete, plasterboard and riser boxing. Choosing type and size, installation steps, typical mistakes and checks.
How a shower channel is set into the floor, connected to the waste, bedded in screed and waterproofed, and how to check the finished work.
How a glass shower screen or bath screen is fitted, screen versus shower enclosure, choosing glass and doors, common mistakes and checks at handover.
How a washing machine and tumble dryer valve and waste trap are fitted, which heights to follow, common mistakes and how to check the finished job.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.