Applying Waterproofing Tapes to Corners

Waterproofing tapes are bedded into wall and floor corner joints as part of liquid tanking. Expect roughly €8.70 per running metre, depending mainly on corners, pipe penetrations and the substrate.

Updated 09/2026·13 min read·3 price list items
Standard labour price
€8.70/ lm
Indicative range
€6.96 - €11.30
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Applying Waterproofing Tapes to Corners

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Tiling3 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Preparation

Installation of waterproofing sealing tape in cornerslm€8.70 / lmlmenter quantity-
Primer application before tilingm²€1.90 / m²m²enter quantity-
Waterproofing (bathroom)m²€7.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

What corner waterproofing tapes do and where they are needed

Corner tapes are flexible strips bonded into the joint between two walls, or between a wall and the floor, before tiling. They are usually bedded into the first coat of liquid tanking and covered by the next coat, so they become part of the membrane. Together with the waterproofing coating around the bath, basin and under the shower tray, they form a continuous layer that water cannot pass through, even if a hairline crack appears in the corner. They are needed wherever water regularly hits the tiles: in the shower, around the bath and at the floor drain.

Why is painting the corner not enough? A corner is where two parts of the structure meet, and each behaves slightly differently. Walls and floors move with changes in temperature and humidity, new buildings settle and floor screeds shrink and flex. The tanking coat alone is only flexible to a point. With repeated movement in the corner it can crack, and water then finds its way under the floor tiles.

The tape takes up this movement without failing. If water does not reach the substrate, there is no damp corner behind the tiles. Plaster does not blow, grout does not turn black and there is no mould that keeps coming back. In a block of flats it also means no leak into the flat below.

What to decide before work starts

Tapes go on while the bathroom is stripped out. Afterwards the tiles cover them and nothing can be changed. It is worth agreeing a few things in advance:

  • How far the tanking goes: the shower, bath and drain areas are obvious. For other corners in the bathroom, decide according to how the room is used. If the floor is often washed down with plenty of water, or children splash at bath time, it makes sense to tank the whole floor with an upstand onto the walls.
  • Height on the walls: in a shower the walls are usually tanked to about 2 metres, or up above the shower head. Around a bath the tanking should go at least about 20 centimetres above the rim. If there is a shower over the bath, treat it as a shower. Agree the height with the tradesperson beforehand.
  • Connection to the bath: the joint between bath and wall is a weak point and is sealed with a dedicated bath sealing tape. There are two approaches. Either the bath is fitted first and the wall above is tanked and lapped onto the tape, or the wall and the area behind and under the bath are tanked first and the bath goes in afterwards. Agree with the tiler which approach will be used, so the bath is fitted at the right stage.
  • Who buys the materials: agree whether the tradesperson supplies the materials and whether they are included in the price. If you buy them yourself, ask for the exact system they work with.
  • Who tanks and who tiles: the simplest arrangement is for the same tiler to do both. If not, agree who is responsible for connecting the tanking to the drain and the bath.
  • Changes to pipework and structure: if waste pipes or supply pipes are being moved, or a partition is coming down, decide this before tanking starts. Work on load-bearing or shared parts of the building, such as the soil stack, needs the consent of the freeholder or managing agent and a qualified professional.

How the work is done step by step

Tapes are not a standalone waterproofing layer but part of a tanking system. The work therefore follows the same sequence as the liquid membrane:

  1. Preparing the substrate: the surface must be sound, dry and free of dust, grease and old adhesive. Larger hollows and holes in the corner are filled first.
  2. Priming: absorbent surfaces such as plaster, plasterboard or screed are primed with the primer belonging to the system and left to dry.
  3. Cutting the tapes: tapes are cut to the length of each corner with an allowance for overlaps, and corner pieces and pipe collars are prepared.
  4. Bath sealing tape: this is self-adhesive, so it goes onto a dry surface. The bath rim is degreased, the tape is stuck to both the bath and the primed wall and pressed down firmly. The tanking coat covers it later in line with the manufacturer's instructions.
  5. Fitting corners and collars: corner pieces and collars with a fleece edge are not laid on a dry surface. Tanking is applied at the corner, pipe outlet or drain, the piece is pressed into the wet coat and smoothed down. Details are fitted before the straight runs so that the straight tapes can lap over them.
  6. Bedding the straight tapes: a band of tanking slightly wider than the tape is applied along the corner. The tape is pressed into the wet coat, centred exactly in the corner, and smoothed with a trowel or brush from the centre outwards so no air is trapped. A small loop of slack is left in the corner and the tape is not stretched. Self-adhesive tapes are instead applied to the dry primed surface after removing the backing film and pressed down across their full width. The system instructions determine which method applies.
  7. Overlapping joints: adjoining lengths overlap, usually by at least five centimetres or as the manufacturer specifies, and the joint is well pressed into the tanking.
  8. Movement joints: if the floor has a movement joint, it is covered with tape in the same way as a corner. The wall-to-floor joint where the tape lies is later not filled with rigid grout in the tiling, but with a flexible sealant.
  9. First coat on the main area: straight after the tapes go in, while the tanking alongside them is still wet, the rest of the area is given its first coat so that it runs seamlessly into the bands along the tapes.
  10. Second coat: once dry as the manufacturer specifies, the tapes and the whole area get another coat, and a third if required. The thickness and coverage per m² are set by the instructions for the specific product. For two-part cementitious membranes this is often around 2 mm when dry. A thinner layer is not enough.
  11. Drying: tiling can only start once the tanking has fully dried. The drying time is given by the manufacturer and is longer in a cold, damp room.

Tapes, corners and collars: what goes where

Straight tape covers an ordinary corner. More complex points use preformed pieces made of the same material:

  • Internal and external corners: preformed pieces for points where three surfaces meet. Cutting and folding straight tape in a corner is an unnecessary risk.
  • Pipe collars: small round pieces with a hole for water outlets at the mixer tap or shower.
  • Floor collar: a larger square around the floor drain or linear drain, connected to the floor tanking.
  • Bath sealing tape: a self-adhesive strip for the rim of a bath or shower tray that links it to the wall tanking.

The common types are tapes with a fleece edge that are bedded into the tanking, and self-adhesive tapes. The choice depends on the membrane. The safest option is to use primer, membrane, tapes and preformed pieces from one manufacturer as a single system, because nobody guarantees mixed brands. For a wet room without a shower tray, it is worth choosing materials the manufacturer specifically rates for that load. Balconies and terraces are a different case: they face frost, sun and large temperature swings, so they need a system designed for outdoor use and a method not covered in this article.

What affects the cost of applying waterproofing tapes

Tape work is priced per running metre of corner. The indicative labour price in the price list is €8.70 per running metre. Many tradespeople charge corner pieces and collars separately per piece, while others include them in the price per metre. When comparing quotes, ask whether fitting the preformed pieces is included, and whether the quote covers tanking the whole area, priming and materials. The main factors are:

  • Length and complexity of the corners: a long straight corner is quick. Lots of short runs, recesses and external corners mean more cutting, more joints and more preformed pieces, so the work costs noticeably more per metre.
  • Number of penetrations: every water outlet, tap or drain needs a collar and careful sealing. A shower with several outlets will push the price up noticeably.
  • Condition of the substrate: a flat, dry, new surface only needs cleaning and priming. An old surface after removing tiles must first be cleaned of adhesive, repaired and left to harden, which adds time and cost.
  • Shape of the surfaces: curved walls or sloping ceilings under the roof take longer to tank than straight corners.
  • Type of shower: a wet room with a sloped floor and linear drain is the most demanding. The connection to the drain must be precise and the materials tend to cost more.
  • Tanking height: the higher the walls are tanked, the more vertical corners and membrane the job involves.
  • Materials: branded tapes and preformed pieces cost more than cheap tapes of unknown origin. For one bathroom the difference is small compared with the cost of repairing a leaking one.
  • Small jobs: with only a few metres of corners, travel and setting up make up a large part of the price. It pays to order the tanking together with the tiling work.

What makes the job quicker and what slows it down

A tradesperson loses a lot of time waiting and dealing with things that should have been finished earlier. The work goes faster when:

  • the bathroom is cleared, the old tiles removed and the rubble taken away,
  • water supply and waste pipes are finished, tested and the outlets fixed in their final position, so the collar does not have to be cut later,
  • the floor drain or linear drain is installed and it is clear when and at what height the bath will be fitted,
  • the materials are bought in advance and on site,
  • the room is warm and can be ventilated, but without draughts or direct sunlight,
  • water for mixing and cleaning tools and electricity are available,
  • nobody walks on the fresh tanking or puts anything on it.

The job is slowed down by fresh plaster or screed that must dry first, a cold unheated room and other trades working in the same bathroom at the same time.

Typical mistakes and how they show up later

Problems rarely start in the open area but at the details. They cannot be seen under the tiles and only show after months or years.

Tape stretched tight

There is no slack in the corner, so the tape tears away from the substrate when the structure moves. Later this shows as darkened grout in the corner or a damp wall behind the tiles.

Air bubbles and creases

Water can track under the tape through them. Moisture spreads into the substrate and over time mould appears in the corner and returns even after cleaning.

Missing overlap

If adjoining lengths of tape do not overlap, the gap between them is exactly where water gets through.

Tape bonded to dust or a damp surface

The tape only appears to hold. With movement it comes loose and the tanking in the corner stops working, even though it looked fine at handover.

Preformed pieces laid on a dry surface

A corner piece or collar with a fleece edge that is simply placed and painted over is not bonded to the tanking underneath. A channel remains under the edge and water runs around the detail.

Second coat left out

The tape remains uncovered and the membrane is too thin. Weak spots let water through, especially at the drain and in the shower.

Tanking stops too low

If the tanking in a shower only goes up a short way from the floor, water gets in through the grout joints above it and the wall behind the tiles gets damp from the top.

No collar at an outlet or drain

A ring around the pipe or drain is left unsealed. A typical sign is a damp wall behind the mixer tap or a damp patch on the ceiling of the flat below the shower.

Bath without sealing tape

The joint between bath and wall relies on silicone alone. When it eventually lets go, water runs behind and under the bath, which is only discovered when the bath is removed.

Straight tape folded into a corner

Creases and cuts in the corner are hard to seal and the corner becomes the weakest point of the whole membrane.

Rigid grout over the tape at the wall-to-floor joint

The movement the tape absorbs cracks rigid grout in the tiling. The joint in the corner cracks and falls out, which is why it should be filled with a flexible sealant.

Tiling onto tanking that has not dried

Adhesive and tiles trap the moisture in the membrane, which then does not cure to its full strength and flexibility. The adhesive grips a soft layer, tiles can loosen over time and sound hollow when tapped, and the tanking in the corners does not take up movement as it should.

How to check the finished work

The check must be made before tiling starts, because nothing is visible afterwards. It is sensible to photograph the finished tanking with a tape measure showing the height on the walls, and keep the photos in case of a claim.

  • tapes are in all corners of the shower, around the bath and at the drain,
  • preformed pieces are used in the corners, not folded straight tape,
  • collars are fitted around water outlets and the drain,
  • the bath rim is linked to the wall tanking with sealing tape,
  • the tape is bonded over its full area, with no bubbles, creases or lifting edges,
  • tape joints overlap,
  • movement joints in the floor are covered with tape,
  • tapes are covered with tanking and no dry spots show through,
  • the tanking on the walls reaches the agreed height,
  • you know the names of the materials used,
  • the tanking has fully dried before tiling.

Tips for DIYers applying the tapes themselves

A careful, handy homeowner can manage the tapes by working methodically, following the sequence above and the manufacturer's instructions. For a wet room without a tray or a connection to a linear drain, it is better to call a tiler. Moving water outlets or waste pipes is a job for a plumber. Besides the method itself, it helps to:

  1. Buy all the materials at once and with some spare, so a corner piece does not run out halfway through.
  2. Read the instructions while still in the shop and find out whether the tapes are bedded into the membrane or self-adhesive, what the drying time is between coats and before tiling, and what thickness is required.
  3. Have scissors or a sharp knife, a small smoothing trowel, a brush and a clean mixing bucket ready.
  4. Practise pressing in tape on a shorter corner away from the shower, where a mistake is easier to fix.
  5. Work in short sections so the membrane under the tape does not start to set before the tape is smoothed down.
  6. Before the second coat, run a finger along the whole tape and look for areas that lift or have air underneath.

Wall tiling should follow the BS 5385 code of practice, with the background prepared and the adhesive chosen to suit the tile size and weight. Once the tanking has dried, tiling can follow, whether that is standard tiling with formats up to 60 cm or large format 60×120 wall and floor tiles.

Frequently asked questions

Roughly €8.70 per running metre. Corner pieces and collars may be charged separately. The price rises mainly with many corners, pipe penetrations and short runs, and with a poor substrate. When comparing quotes, check whether they include materials and tanking of the whole area.